EP3291421 - LANDING BEARING ASSEMBLY AND ROTARY MACHINE EQUIPPED WITH SUCH AN ASSEMBLY AND A MAGNETIC BEARING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.11.2021 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 18.12.2020 | ||
Former | Grant of patent is intended Status updated on 09.08.2020 | ||
Former | Request for examination was made Status updated on 07.09.2018 | ||
Former | The application has been published Status updated on 02.02.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states SKF MAGNETIC MECHATRONICS Z.I. de Vernon Saint Marcel 2, rue des Champs 27950 Saint-Marcel / FR | [2018/10] | Inventor(s) | 01 /
Anders, Jens 11 rue de Glatigny 27200 Vernon / FR | [2018/10] | Representative(s) | Kuhstrebe, Jochen, et al SKF GmbH Gunnar-Wester-Straße 12 97421 Schweinfurt / DE | [2018/10] | Application number, filing date | 17185719.6 | 10.08.2017 | [2018/10] | Priority number, date | DE201610216427 | 31.08.2016 Original published format: DE102016216427 | [2018/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3291421 | Date: | 07.03.2018 | Language: | EN | [2018/10] | Type: | A3 Search report | No.: | EP3291421 | Date: | 21.03.2018 | Language: | EN | [2018/12] | Type: | B1 Patent specification | No.: | EP3291421 | Date: | 20.01.2021 | Language: | EN | [2021/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.02.2018 | Classification | IPC: | H02K7/09, F16C32/04, F16C35/073, F16C35/077 | [2020/33] | CPC: |
F16C35/073 (EP,US);
H02K5/16 (CN);
F16C32/0474 (US);
F16C32/0442 (EP,US);
F16C35/077 (EP,US);
H02K7/09 (EP,CN,US);
|
Former IPC [2018/12] | H02K7/09, F16C32/04 | ||
Former IPC [2018/10] | H02K7/09, F16C19/18, F16C23/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/41] |
Former [2018/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FANGLAGERANORDNUNG UND DAMIT UND MIT EINEM MAGNETLAGER AUSGERÜSTETE ROTIERENDE MASCHINE | [2020/33] | English: | LANDING BEARING ASSEMBLY AND ROTARY MACHINE EQUIPPED WITH SUCH AN ASSEMBLY AND A MAGNETIC BEARING | [2018/10] | French: | ENSEMBLE DE COUSSINET DE PALIER ET MACHINE TOURNANTE ÉQUIPÉE D'UN TEL ENSEMBLE ET D'UN PALIER MAGNÉTIQUE | [2018/10] |
Former [2018/10] | LANDUNGSLAGERANORDNUNG UND MIT SOLCH EINER ANORDNUNG AUSGERÜSTETE DREHMASCHINE UND MAGNETLAGER | Examination procedure | 10.08.2017 | Date on which the examining division has become responsible | 30.08.2018 | Amendment by applicant (claims and/or description) | 30.08.2018 | Examination requested [2018/41] | 10.08.2020 | Communication of intention to grant the patent | 09.12.2020 | Fee for grant paid | 09.12.2020 | Fee for publishing/printing paid | 09.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 21.10.2021 | No opposition filed within time limit [2021/52] | Fees paid | Renewal fee | 29.08.2019 | Renewal fee patent year 03 | 28.08.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.08.2017 | AL | 20.01.2021 | AT | 20.01.2021 | CY | 20.01.2021 | CZ | 20.01.2021 | DK | 20.01.2021 | EE | 20.01.2021 | ES | 20.01.2021 | FI | 20.01.2021 | HR | 20.01.2021 | LT | 20.01.2021 | LV | 20.01.2021 | MC | 20.01.2021 | MK | 20.01.2021 | NL | 20.01.2021 | PL | 20.01.2021 | RO | 20.01.2021 | RS | 20.01.2021 | SE | 20.01.2021 | SI | 20.01.2021 | SK | 20.01.2021 | SM | 20.01.2021 | TR | 20.01.2021 | BG | 20.04.2021 | GR | 21.04.2021 | IS | 20.05.2021 | PT | 20.05.2021 | GB | 10.08.2021 | IE | 10.08.2021 | LU | 10.08.2021 | BE | 31.08.2021 | [2024/29] |
Former [2024/22] | HU | 10.08.2017 | |
AL | 20.01.2021 | ||
AT | 20.01.2021 | ||
CY | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
MK | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
Former [2023/30] | HU | 10.08.2017 | |
AL | 20.01.2021 | ||
AT | 20.01.2021 | ||
CY | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
Former [2023/29] | HU | 10.08.2017 | |
AL | 20.01.2021 | ||
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
NL | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
Former [2023/28] | HU | 10.08.2017 | |
AL | 20.01.2021 | ||
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
Former [2022/35] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
Former [2022/34] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
LU | 10.08.2021 | ||
BE | 31.08.2021 | ||
Former [2022/23] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
LU | 10.08.2021 | ||
Former [2022/18] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
MC | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2022/13] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SI | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2022/10] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2022/08] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
ES | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2022/07] | AL | 20.01.2021 | |
AT | 20.01.2021 | ||
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/50] | AT | 20.01.2021 | |
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RO | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SK | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/49] | AT | 20.01.2021 | |
CZ | 20.01.2021 | ||
DK | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/48] | AT | 20.01.2021 | |
CZ | 20.01.2021 | ||
EE | 20.01.2021 | ||
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/46] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
SM | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/42] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
IS | 20.05.2021 | ||
PT | 20.05.2021 | ||
Former [2021/39] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
PL | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/38] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
SE | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/37] | AT | 20.01.2021 | |
FI | 20.01.2021 | ||
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
LV | 20.01.2021 | ||
RS | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/36] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
BG | 20.04.2021 | ||
GR | 21.04.2021 | ||
PT | 20.05.2021 | ||
Former [2021/35] | FI | 20.01.2021 | |
HR | 20.01.2021 | ||
LT | 20.01.2021 | ||
PT | 20.05.2021 | ||
Former [2021/33] | FI | 20.01.2021 | |
LT | 20.01.2021 | ||
PT | 20.05.2021 | Documents cited: | Search | [A]US6004372 (QUETS JOHN [US]) [A] 3 * column 2, lines 15-17 ** column 3, lines 47-53 *; | [XA]US2003205944 (ADAMS ROBBIE [US], et al) [X] 1-3 * paragraph [0018] * [A] 4; | [XAYI]DE102006049974 (OERLIKON LEYBOLD VACUUM GMBH [DE]) [X] 1-3,6,11,13 * paragraph [0022]; figures 1,2; claim 2 * [A] 4 [Y] 6,8,10 [I] 5,7,12; | [YD]US7847454 (WEEBER KONRAD ROMAN [US], et al) [YD] 6,8,10 * column 9, lines 17-34; figure 5 *; | [X]EP2803875 (SKF AB [SE]) [X] 1,3,9,10 * paragraph [0008]; figures 1,2 * | by applicant | US7847454 |