blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3301330

EP3301330 - POWER TAKE-OFF UNIT RING GEAR SHAFT, MANUFACTURING METHOD THEREOF AND APPARATUS COMPRISING THE SAME [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  19.11.2021
Database last updated on 01.01.2025
FormerGrant of patent is intended
Status updated on  04.03.2021
FormerExamination is in progress
Status updated on  07.01.2020
FormerRequest for examination was made
Status updated on  07.09.2018
FormerThe application has been published
Status updated on  02.03.2018
Most recent event   Tooltip19.11.2021Application deemed to be withdrawnpublished on 22.12.2021  [2021/51]
Applicant(s)For all designated states
GF Casting Solutions Kunshan Co. Ltd.
No. 300 Tian'e Road
Kunshan Economic and Technical Development Zone
Kunshan Jiangsu Province 215300 / CN
[2019/40]
Former [2018/14]For all designated states
Georg Fischer Automotive (Kunshan) Co Ltd.
300 Tiane Road
KETD Jiangsu Province
Kunshan City
Jiangsu 215300 / CN
Inventor(s)01 / Zhang, Jack
Room 5-504, Mingdu Garden
Yushan Town, Kunshan City, Jiangsu Province / CN
02 / Zhang, Richard
Room 17-301, Jinliang Str. No. 133
Suzhou City, Jiangsu Province / CN
03 / Fu, Aaron
DongfangWeiLuoNa, Keneng Road No. 18
Suzhou City, Jiangsu Province / CN
 [2018/14]
Representative(s)Fenner, Seraina
Georg Fischer AG
Amsler-Laffon-Strasse 9
8201 Schaffhausen / CH
[2018/14]
Application number, filing date17188921.501.09.2017
[2018/14]
Priority number, dateCN20161086229629.09.2016         Original published format: CN201610862296
[2018/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3301330
Date:04.04.2018
Language:EN
[2018/14]
Search report(s)(Supplementary) European search report - dispatched on:EP21.02.2018
ClassificationIPC:F16H48/42, F16H57/00, F16C3/02
[2018/14]
CPC:
F16C3/02 (EP,CN,US); B60K25/06 (US); B60K17/3462 (US);
F16H48/42 (EP,US); F16H57/0025 (EP,US); F16C2361/61 (EP,US);
F16H1/14 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/41]
Former [2018/14]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:RINGRADWELLE-KRAFTABNAHMEEINHEIT, HERSTELLUNGSMETHODE DERSELBEN UND VORRICHTUNG MIT SO EINER RINGRADWELLE-KRAFTABNAHMEEINHEIT[2018/14]
English:POWER TAKE-OFF UNIT RING GEAR SHAFT, MANUFACTURING METHOD THEREOF AND APPARATUS COMPRISING THE SAME[2018/14]
French:UNITÉ DE PRISE DE FORCE D'UN ARBRE DE MEULE ANNULAIRE, ET SA PROCÉDÉ DE FABRICATION ET APPAREIL COMPRENANT LADITE[2018/14]
Examination procedure01.09.2017Date on which the examining division has become responsible
04.09.2018Amendment by applicant (claims and/or description)
04.09.2018Examination requested  [2018/41]
10.01.2020Despatch of a communication from the examining division (Time limit: M04)
12.05.2020Reply to a communication from the examining division
23.07.2020Despatch of a communication from the examining division (Time limit: M04)
09.11.2020Reply to a communication from the examining division
05.03.2021Communication of intention to grant the patent
16.07.2021Application deemed to be withdrawn, date of legal effect  [2021/51]
05.08.2021Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2021/51]
Fees paidRenewal fee
24.09.2019Renewal fee patent year 03
24.09.2020Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
30.09.202105   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]US4496333  (CLEVELAND DONALD C [US]);
 [Y]US2003075301  (KIMBROUGH LARRY C [US], et al);
 [Y]US2004226170  (PRUCHER BRYAN P [US]);
 [A]US2013333503  (PEURA BRENT [US], et al);
 [A]CN204657409U  (KUNSHAN QUANSHUN ALUMINUM FORGING CO LTD)
ExaminationUS5119905
 US5658087
 US2009139368
 US2010283358
 EP2930401
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.