EP3393025 - METHOD AND SYSTEM FOR CONTROLLING RECTIFIER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.10.2020 Database last updated on 26.04.2025 | |
Former | The patent has been granted Status updated on 25.10.2019 | ||
Former | Grant of patent is intended Status updated on 13.08.2019 | ||
Former | Request for examination was made Status updated on 21.09.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Industrial Technology Research Institute No. 195 Sec. 4 Chung Hsing Rd. Chutung Hsinchu 31040 Taiwan / TW | [2018/43] | Inventor(s) | 01 /
Yeh, Po-Ting Industrial Technology Research Institute No. 195, Sec. 4, Chung Hsing Road Chutung Hsinchu, Taiwan 31040 / TW | 02 /
Chang, Yuan-Tai Industrial Technology Research Institute No. 195, Sec. 4, Chung Hsing Road Chutung Hsinchu, Taiwan 31040 / TW | 03 /
Juang, Kai-Cheung Industrial Technology Research Institute No. 195, Sec. 4, Chung Hsing Road Chutung Hsinchu, Taiwan 31040 / TW | [2018/43] | Representative(s) | Ablett, Graham Keith Lewis Silkin LLP Arbor 255 Blackfriars Road London SE1 9AX / GB | [N/P] |
Former [2019/48] | Ablett, Graham Keith Lewis Silkin LLP 5 Chancery Lane Clifford's Inn London EC4A 1BL / GB | ||
Former [2018/43] | Ablett, Graham Keith, et al Ablett & Stebbing 7-8 Market Place London, W1W 8AG / GB | Application number, filing date | 17189367.0 | 05.09.2017 | [2018/43] | Priority number, date | CN201710254000 | 18.04.2017 Original published format: CN201710254000 | [2018/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3393025 | Date: | 24.10.2018 | Language: | EN | [2018/43] | Type: | B1 Patent specification | No.: | EP3393025 | Date: | 27.11.2019 | Language: | EN | [2019/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.03.2018 | Classification | IPC: | H02M1/08, H02M7/219 | [2018/43] | CPC: |
H02M7/219 (EP,US);
H02P9/48 (CN);
H02M7/162 (US);
H02J7/1415 (CN);
H02M1/083 (EP,US);
H02M7/217 (CN);
H02M7/2195 (EP,US);
H02M1/0048 (CN);
H02P2101/45 (CN);
Y02B70/10 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/43] | Title | German: | VERFAHREN UND SYSTEM ZUR STEUERUNG EINES GLEICHRICHTERS | [2018/43] | English: | METHOD AND SYSTEM FOR CONTROLLING RECTIFIER | [2018/43] | French: | PROCÉDÉ ET SYSTÈME DE COMMANDE DE REDRESSEUR | [2018/43] | Examination procedure | 05.09.2017 | Date on which the examining division has become responsible | 04.10.2017 | Examination requested [2018/43] | 24.10.2018 | Amendment by applicant (claims and/or description) | 14.08.2019 | Communication of intention to grant the patent | 17.10.2019 | Receipt of the translation of the claim(s) | 18.10.2019 | Fee for grant paid | 18.10.2019 | Fee for publishing/printing paid | Opposition(s) | 28.08.2020 | No opposition filed within time limit [2020/45] | Fees paid | Renewal fee | 17.09.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.09.2017 | AL | 27.11.2019 | AT | 27.11.2019 | CY | 27.11.2019 | CZ | 27.11.2019 | DK | 27.11.2019 | EE | 27.11.2019 | ES | 27.11.2019 | FI | 27.11.2019 | HR | 27.11.2019 | IT | 27.11.2019 | LT | 27.11.2019 | LV | 27.11.2019 | MC | 27.11.2019 | MK | 27.11.2019 | MT | 27.11.2019 | NL | 27.11.2019 | PL | 27.11.2019 | RO | 27.11.2019 | RS | 27.11.2019 | SE | 27.11.2019 | SI | 27.11.2019 | SK | 27.11.2019 | SM | 27.11.2019 | TR | 27.11.2019 | BG | 27.02.2020 | NO | 27.02.2020 | GR | 28.02.2020 | IS | 27.03.2020 | PT | 19.04.2020 | [2022/33] |
Former [2022/28] | HU | 05.09.2017 | |
AL | 27.11.2019 | ||
AT | 27.11.2019 | ||
CY | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
IT | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
MC | 27.11.2019 | ||
MT | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
TR | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2022/27] | HU | 05.09.2017 | |
AL | 27.11.2019 | ||
AT | 27.11.2019 | ||
CY | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
IT | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
MT | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
TR | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2021/10] | AL | 27.11.2019 | |
AT | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
IT | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/51] | AL | 27.11.2019 | |
AT | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/37] | AL | 27.11.2019 | |
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/36] | AL | 27.11.2019 | |
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/35] | AL | 27.11.2019 | |
CZ | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/34] | AL | 27.11.2019 | |
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/32] | AL | 27.11.2019 | |
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/26] | FI | 27.11.2019 | |
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/24] | FI | 27.11.2019 | |
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/23] | FI | 27.11.2019 | |
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
Former [2020/22] | FI | 27.11.2019 | |
LT | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
Former [2020/21] | NO | 27.02.2020 | Documents cited: | Search | [XA]US2011255320 (TABATA MITSUNORI [JP], et al) [X] 1-8,10-17 * abstract * * paragraphs [0040] - [0062]; figures 1-15 * [A] 9,18; | [XA]EP2400651 (MITSUBISHI ELECTRIC CORP [JP]) [X] 1-8,10-17 * abstract * * paragraphs [0002] , [0 54] , [0 56]; figures 1-3 * [A] 9,18; | [A]US2015146466 (KIM DONG ZO [KR], et al) [A] 1-18* abstract * |