blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3396121

EP3396121 - EXHAUST DIFFUSER OF A GAS TURBINE ENGINE HAVING EJECTION HOLES AND SUCTION HOLES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.12.2021
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  17.09.2020
FormerRequest for examination was made
Status updated on  28.09.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Doosan Heavy Industries & Construction Co., Ltd.
22, Doosan volvo-ro, Seongsan-gu
Changwon-si
Gyeongsangnam-do, 51711 / KR
[2019/23]
Former [2018/44]For all designated states
Doosan Heavy Industries & Construction Co., Ltd.
22, Doosan volvo-ro, Seongsan-gu
Changwon-si
Gyeongsangnam-do 642-792 / KR
Inventor(s)01 / KIM, Dae Hyun
509-1007, 35, Naejeong-ro 165beon-gil, Bundang-gu
Seongnam-si
Gyeonggi-do, 13597 / KR
 [2021/07]
Former [2018/44]01 / KIM, Dae Hyun
509-1007, 35, Naejeong-ro 165beon-gil, Bundang-gu
Seongnam-si
13597 Gyeonggi-do / KR
Representative(s)Ter Meer Steinmeister & Partner
Patentanwälte mbB
Nymphenburger Straße 4
80335 München / DE
[2018/44]
Application number, filing date17192373.321.09.2017
[2018/44]
Priority number, dateKR2017005516428.04.2017         Original published format: KR 20170055164
[2018/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3396121
Date:31.10.2018
Language:EN
[2018/44]
Type: B1 Patent specification 
No.:EP3396121
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)(Supplementary) European search report - dispatched on:EP26.03.2018
ClassificationIPC:F01D25/30, F04D29/68, F04D29/54
[2018/44]
CPC:
F01D25/305 (EP,US); F01D25/30 (KR); F02C3/04 (US);
F02C7/00 (KR); F04D29/682 (EP,US); F04D29/684 (EP,US);
F05D2220/32 (KR,US); F05D2240/12 (US); F05D2240/35 (US);
F05D2250/324 (EP,US); F05D2270/17 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/17]
Former [2018/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ABGASDIFFUSOR EINES GASTURBINENTRIEBWERKS MIT AUSBLASSLÖCHERN UND ANSAUGLÖCHERN[2018/44]
English:EXHAUST DIFFUSER OF A GAS TURBINE ENGINE HAVING EJECTION HOLES AND SUCTION HOLES[2018/44]
French:DIFFUSEUR D'ÉCHAPPEMENT AYANT DES TROUS D'ÉJECTION ET DES TROUS D'ASPIRATION POUR UN MOTEUR À TURBINE À GAZ[2018/44]
Examination procedure21.09.2017Examination requested  [2018/44]
21.09.2017Date on which the examining division has become responsible
13.03.2019Amendment by applicant (claims and/or description)
18.09.2020Communication of intention to grant the patent
28.12.2020Fee for grant paid
28.12.2020Fee for publishing/printing paid
28.12.2020Receipt of the translation of the claim(s)
Opposition(s)18.11.2021No opposition filed within time limit [2022/04]
Fees paidRenewal fee
24.09.2019Renewal fee patent year 03
23.09.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.09.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
MT17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
TR17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB21.09.2021
IE21.09.2021
LU21.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
[2024/42]
Former [2024/29]HU21.09.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
TR17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB21.09.2021
IE21.09.2021
LU21.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2024/22]HU21.09.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB21.09.2021
IE21.09.2021
LU21.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2023/33]HU21.09.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB21.09.2021
IE21.09.2021
LU21.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2023/30]AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB21.09.2021
IE21.09.2021
LU21.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2022/37]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB21.09.2021
IE21.09.2021
LU21.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2022/35]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB21.09.2021
IE21.09.2021
LU21.09.2021
BE30.09.2021
FR30.09.2021
Former [2022/34]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
LU21.09.2021
BE30.09.2021
FR30.09.2021
Former [2022/25]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/23]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/13]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/10]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/08]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]AT17.02.2021
CZ17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]AT17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]FI17.02.2021
HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]FI17.02.2021
HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]FI17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Documents cited:Search[Y]US2656096  (SCHWARZ MARCEL G) [Y] 1-11,14,15 * figures 1-8 *;
 [Y]US2729974  (LEE JOHN G, et al) [Y] 1,5-11,14,15 * figure 1 *;
 [Y]US2948148  (LOUIS M G DE JURQUET DE LA SAL, et al) [Y] 1-11,14,15 * the whole document *;
 [Y]EP0093462  (BBC BROWN BOVERI & CIE [CH]) [Y] 12,13* figure 4 *;
 [Y]JPS59192699U  (MITSUBISHI) [Y] 1,6-11,15 * figure 6 *;
 [Y]US4515524  (FISHER JR RICHARD K [US]) [Y] 1-3,5-10,14,15 * figure 1 *;
 [Y]US2004091350  (GRAZIOSI PAOLO [US], et al) [Y] 1-7,14,15 * figures 5,14,19,27,28 *;
 [Y]US2009263243  (LITTLE DAVID A [US], et al) [Y] 1-5,8-10,14,15 * paragraphs [0020] - [0024]; figure 1 *;
 [Y]WO2010010277  (GE ENERGY PRODUCTS FRANCE SNC [FR], et al) [Y] 1,7,11,14,15 * page 12; figures 1-6 *;
 [Y]US2011058939  (OROSA JOHN [US], et al) [Y] 1-6,8-10,14,15 * paragraphs [0063] - [0067] - [0047] - [0054]; figures 5-8 *;
 [Y]DE102010022418  (ESG MBH [DE]) [Y] 1-4,6,8-10,14,15 * paragraph [0019]; figures 4,5 *;
 [Y]EP2615262  (GEN ELECTRIC [US]) [Y] 1-15 * paragraphs [0014] - [0018]; figures 1,2 *;
 [Y]US8776527  (SOKHEY JAGDISH [US], et al) [Y] 1-6,8-10,14,15 * figures 2,5 *;
 [Y]WO2016001002  (ABB TURBO SYSTEMS AG [CH]) [Y] 1,6-11,14,15 * figure 3 *
by applicantKR20170055164
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.