EP3352385 - METHOD, DEVICE, AND SYSTEM FOR SYNCHRONIZING PHYSICAL LAYER STATE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.10.2020 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 08.11.2019 | ||
Former | Grant of patent is intended Status updated on 23.06.2019 | ||
Former | Request for examination was made Status updated on 01.02.2019 | ||
Former | The application has been published Status updated on 22.06.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/30] | Inventor(s) | 01 /
CHEN, Jun Huawei Technologies Co.,Ltd. Intellectual Property Department G1-2F, Bantian Longgang District shenzhen, Guangdong / CN | [2018/30] | Representative(s) | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstraße 25 80992 München / DE | [2019/50] |
Former [2018/30] | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstrasse 8 80992 München / DE | Application number, filing date | 17192500.1 | 28.02.2012 | [2018/30] | Priority number, date | CN201110108663 | 28.04.2011 Original published format: CN201110108663 | [2018/30] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3352385 | Date: | 25.07.2018 | Language: | EN | [2018/30] | Type: | B1 Patent specification | No.: | EP3352385 | Date: | 11.12.2019 | Language: | EN | [2019/50] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.06.2018 | Classification | IPC: | H04B7/26, H04W52/02, H04W76/27 | [2018/30] | CPC: |
H04W52/0216 (EP,US);
H04B7/2603 (EP,US);
H04W56/00 (US);
H04W72/29 (US);
H04W72/51 (US);
H04W76/27 (EP,US);
Y02D30/70 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/10] |
Former [2018/30] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN, VORRICHTUNG UND SYSTEM ZUR SYNCHRONISIERUNG EINES PHYSISCHEN SCHICHTZUSTANDS | [2018/30] | English: | METHOD, DEVICE, AND SYSTEM FOR SYNCHRONIZING PHYSICAL LAYER STATE | [2018/30] | French: | PROCÉDÉ, APPAREIL ET SYSTÈME POUR SYNCHRONISER UN ÉTAT DE COUCHE PHYSIQUE | [2018/30] | Examination procedure | 25.01.2019 | Amendment by applicant (claims and/or description) | 25.01.2019 | Examination requested [2019/10] | 25.01.2019 | Date on which the examining division has become responsible | 24.06.2019 | Communication of intention to grant the patent | 04.11.2019 | Fee for grant paid | 04.11.2019 | Fee for publishing/printing paid | 04.11.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12776222.7 / EP2685769 | Opposition(s) | 14.09.2020 | No opposition filed within time limit [2020/47] | Fees paid | Renewal fee | 22.01.2018 | Renewal fee patent year 03 | 22.01.2018 | Renewal fee patent year 04 | 22.01.2018 | Renewal fee patent year 05 | 22.01.2018 | Renewal fee patent year 06 | 28.02.2018 | Renewal fee patent year 07 | 28.02.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2012 | AL | 11.12.2019 | AT | 11.12.2019 | CY | 11.12.2019 | CZ | 11.12.2019 | DK | 11.12.2019 | EE | 11.12.2019 | FI | 11.12.2019 | HR | 11.12.2019 | IT | 11.12.2019 | LT | 11.12.2019 | LV | 11.12.2019 | MC | 11.12.2019 | MK | 11.12.2019 | MT | 11.12.2019 | NL | 11.12.2019 | PL | 11.12.2019 | RO | 11.12.2019 | RS | 11.12.2019 | SE | 11.12.2019 | SI | 11.12.2019 | SK | 11.12.2019 | SM | 11.12.2019 | TR | 11.12.2019 | IE | 28.02.2020 | LU | 28.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | FR | 29.02.2020 | LI | 29.02.2020 | BG | 11.03.2020 | GB | 11.03.2020 | NO | 11.03.2020 | GR | 12.03.2020 | IS | 11.04.2020 | PT | 06.05.2020 | DE | 01.09.2020 | [2022/33] |
Former [2022/27] | HU | 28.02.2012 | |
AL | 11.12.2019 | ||
AT | 11.12.2019 | ||
CY | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
MT | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 11.03.2020 | ||
GB | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
DE | 01.09.2020 | ||
Former [2021/22] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 11.03.2020 | ||
GB | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
DE | 01.09.2020 | ||
Former [2021/10] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
DE | 01.09.2020 | ||
Former [2021/07] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
CH | 29.02.2020 | ||
FR | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
DE | 01.09.2020 | ||
Former [2020/51] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
LU | 28.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/50] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
LU | 28.02.2020 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/47] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
LU | 28.02.2020 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/40] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/36] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/35] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/32] | AL | 11.12.2019 | |
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/25] | FI | 11.12.2019 | |
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/23] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/22] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
Former [2020/21] | NO | 11.03.2020 | Documents cited: | Search | [A]WO2004028050 (NOKIA CORP [FI], et al) [A] 1,4,7,10,13,16,19 * abstract ** pages 9-18 *; | [A]WO2009022812 (SAMSUNG ELECTRONICS CO LTD [KR], et al) [A] 1,4,7,10,13,16,19 * abstract * * pages 12-17 *; | [A]WO2009100220 (QUALCOMM INC [US], et al) [A] 1,4,7,10,13,16,19 * abstract * * paragraphs [0040] - [0081] *; | [A]WO2010028607 (DA TANG MOBILE COMM EQUIPMENT [CN], et al) [A] 1,4,7,10,13,16,19 * abstract *; | [A]CN102036284 (HUAWEI TECH CO LTD) [A] 1,4,7,10,13,16,19 * paragraphs [0042] - [0130] *; | [P]US2011287774 (LI XIAOKA [CN]) [P] * abstract * * paragraphs [0028] - [0078] *; | [A] - ERICSSON ET AL, "Dual band capability signalling", 3GPP DRAFT; R2-095715, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091012), no. Miyazaki; 20091012, XP050390220 [A] 1,4,7,10,13,16,19 * the whole document * |