| EP3459985 - UREA URETHANES (II) [Right-click to bookmark this link] | Status | Patent revoked Status updated on 22.10.2025 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 15.05.2020 | ||
| Former | Grant of patent is intended Status updated on 16.01.2020 | ||
| Former | Request for examination was made Status updated on 06.09.2019 | ||
| Former | The application has been published Status updated on 22.02.2019 | Most recent event Tooltip | 24.10.2025 | Revocation of patent | published on 26.11.2025 [2025/48] | Applicant(s) | For all designated states CliQ SwissTech (Netherlands) B.V. Zernikepark 6-8 9747 AN Groningen / NL | [N/P] |
| Former [2020/34] | For all designated states CliQ SwissTech (Netherlends) B.V. Zernikepark 6-8 9747 AN Groningen / NL | ||
| Former [2019/13] | For all designated states CLIQ SWISSTECH GMBH Hauptstraße 97 51465 Bergisch Gladbach / DE | Inventor(s) | 01 /
HAVEMAN, Daniel Het Schar 40 8332 Steenwijk / NL | 02 /
VAN VEEN, Adrianus Peter Borgdomein 10 9351ST Leek / NL | 03 /
WIJMA, Neeltje Opper 7 9288DD Kootstertille / NL | [2019/13] | Representative(s) | Fabry, Bernd IP2 Patentanwalts GmbH Schlossstrasse 523-525 41238 Mönchengladbach / DE | [2019/13] | Application number, filing date | 17192570.4 | 22.09.2017 | [2019/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3459985 | Date: | 27.03.2019 | Language: | EN | [2019/13] | Type: | B1 Patent specification | No.: | EP3459985 | Date: | 17.06.2020 | Language: | EN | [2020/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.03.2018 | Classification | IPC: | C08G18/76, C08G18/10, C08G18/28, C09D175/02, C09D5/04, C08G71/02 | [2019/13] | CPC: |
C08G18/7621 (EP,US);
C08G18/3243 (CN,US);
C08G18/3819 (US);
C08G18/10 (EP,US);
C08G18/283 (EP,US);
C08G18/4833 (CN,US);
C08G18/4862 (US);
C08G18/6685 (CN,US);
C08G71/02 (EP,US);
C09D175/02 (EP,US);
C09D5/04 (EP,US);
C09D7/43 (EP,US);
C09D7/65 (CN,US)
(-)
| C-Set: |
C08G18/10, C08G18/324 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/41] |
| Former [2019/13] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HARNSTOFF URETHANE (II) | [2019/13] | English: | UREA URETHANES (II) | [2019/13] | French: | URÉE URETHANES (II) | [2022/25] |
| Former [2019/13] | URÉE URETHANES (II) | Examination procedure | 30.08.2019 | Amendment by applicant (claims and/or description) | 30.08.2019 | Examination requested [2019/41] | 30.08.2019 | Date on which the examining division has become responsible | 17.01.2020 | Communication of intention to grant the patent | 06.05.2020 | Fee for grant paid | 06.05.2020 | Fee for publishing/printing paid | 06.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
15.03.2021
18.03.2021
ADMISSIBLE BYK-Chemie GmbH Abelstrasse 45 46483 Wesel / DE Opponent's representative Strych, Sebastian Mitscherlich PartmbB Karlstraße 7 80333 München / DE | [N/P] |
| Former [2025/01] | |||
| Opponent(s) | 01
15.03.2021
18.03.2021
ADMISSIBLE BYK-Chemie GmbH Abelstrasse 45 46483 Wesel / DE Opponent's representative Strych, Sebastian Mitscherlich PartmbB Patent- und Rechtsanwälte Karlstraße 7 80333 München / DE | ||
| Former [2021/16] | |||
| Opponent(s) | 01
15.03.2021
18.03.2021
ADMISSIBLE BYK-Chemie GmbH Abelstrasse 45 46483 Wesel / DE Opponent's representative Altana IP Department Altana Management Services GmbH Abelstraße 45 46483 Wesel / DE | 29.03.2021 | Invitation to proprietor to file observations on the notice of opposition | 17.06.2021 | Reply of patent proprietor to notice(s) of opposition | 08.08.2022 | Despatch of interlocutory decision in opposition | 12.09.2025 | Legal effect of revocation of patent [2025/48] | 20.10.2025 | Despatch of communication that the patent will be revoked | Appeal following opposition | 27.09.2022 | Appeal received No. T2206/22 | 27.09.2022 | Payment of appeal fee | 16.12.2022 | Statement of grounds filed | 12.09.2025 | Result of appeal procedure: revocation of the patent | 20.10.2025 | Despatch of the decision of the Board of Appeal | 12.09.2025 | Date of oral proceedings | Fees paid | Renewal fee | 23.09.2019 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.09.2017 | AL | 17.06.2020 | AT | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | MT | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | TR | 17.06.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IE | 22.09.2020 | LU | 22.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | [2022/33] |
| Former [2022/28] | HU | 22.09.2017 | |
| AL | 17.06.2020 | ||
| AT | 17.06.2020 | ||
| CY | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| DK | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| MC | 17.06.2020 | ||
| MT | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SI | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| TR | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| IE | 22.09.2020 | ||
| LU | 22.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2022/27] | HU | 22.09.2017 | |
| AL | 17.06.2020 | ||
| AT | 17.06.2020 | ||
| CY | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| DK | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| MT | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SI | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| TR | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| IE | 22.09.2020 | ||
| LU | 22.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/37] | AL | 17.06.2020 | |
| AT | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| DK | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SI | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| IE | 22.09.2020 | ||
| LU | 22.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/36] | AL | 17.06.2020 | |
| AT | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| DK | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SI | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| LU | 22.09.2020 | ||
| BE | 30.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/27] | AL | 17.06.2020 | |
| AT | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| DK | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SI | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| LU | 22.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/24] | AL | 17.06.2020 | |
| AT | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| DK | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SI | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/21] | AL | 17.06.2020 | |
| AT | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| DK | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/10] | AL | 17.06.2020 | |
| AT | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| PL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SK | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| IS | 17.10.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/09] | AL | 17.06.2020 | |
| AT | 17.06.2020 | ||
| CZ | 17.06.2020 | ||
| EE | 17.06.2020 | ||
| ES | 17.06.2020 | ||
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| RO | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| SM | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| PT | 19.10.2020 | ||
| Former [2021/04] | AL | 17.06.2020 | |
| FI | 17.06.2020 | ||
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| NL | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| Former [2021/01] | FI | 17.06.2020 | |
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| BG | 17.09.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| Former [2020/51] | FI | 17.06.2020 | |
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| RS | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| Former [2020/50] | FI | 17.06.2020 | |
| HR | 17.06.2020 | ||
| LT | 17.06.2020 | ||
| LV | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| NO | 17.09.2020 | ||
| GR | 18.09.2020 | ||
| Former [2020/48] | FI | 17.06.2020 | |
| LT | 17.06.2020 | ||
| SE | 17.06.2020 | ||
| NO | 17.09.2020 | ||
| Former [2020/47] | LT | 17.06.2020 | |
| NO | 17.09.2020 | Documents cited: | Search | [XDY] EP1048681 (BYK CHEMIE GMBH et al.) | [Y] US2007259120 (HAUBENNESTEL KARLHEINZ et al.) | by applicant | EP0198519 | EP0006252 | EP1048681 | JPS58217598 | WO9013533 | DE4321022 | WO9623768 | DE19513391 | WO9519953 | WO9519954 | WO9519955 | WO9101295 | DE4308794 | EP0750606 | Opposition | US2011265691 | US2016185985 | US5093031 | US2002115882 | ANONYMOUS: "Tenside", WIKIPEDIA, 8 September 2021 (2021-09-08), XP055967134, Retrieved from the Internet | FABRY BERND: "Tenside", CHEMIE IN UNSERE SEIT, no. 4, 25 January 1995 (1995-01-25), pages 214 - 222, XP055967138 | "Rmpp-Lexicon Lacke und Druckfarben", 1 January 1998, GEORG THIEME VERLAG, article ZORLL U., HANS-JRGEN P. ADLER: "Tenside", pages: 557 - 558, XP055967145 |