EP3312015 - BATTERY-POWERED PRINTER AND METHOD FOR DRIVING BATTERY-POWERED PRINTER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 26.03.2021 | ||
Former | Grant of patent is intended Status updated on 29.11.2020 | ||
Former | Request for examination was made Status updated on 02.11.2018 | ||
Former | The application has been published Status updated on 23.03.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Toshiba TEC Kabushiki Kaisha 1-11-1, Osaki Shinagawa-ku Tokyo 141-8562 / JP | [2021/17] |
Former [2018/17] | For all designated states Toshiba TEC Kabushiki Kaisha 1-11-1, Osaki Shinagawa-ku Tokyo 141-8562 / JP | Inventor(s) | 01 /
TSUCHIMOTO, Hiroshi c/o IP Division, Toshiba Tec Kabushiki Kaisha 1-11-1, Osaki Shinagawa-ku, Tokyo 141-8562 / JP | [2018/17] | Representative(s) | Bandpay & Greuter 11 rue Christophe Colomb 75008 Paris / FR | [N/P] |
Former [2021/17] | Bandpay & Greuter 30, rue Notre-Dame des Victoires 75002 Paris / FR | ||
Former [2018/17] | Takeuchi, Maya, et al Fédit-Loriot 38, avenue Hoche 75008 Paris / FR | Application number, filing date | 17192934.2 | 25.09.2017 | [2018/17] | Priority number, date | JP20160208022 | 24.10.2016 Original published format: JP 2016208022 | [2018/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3312015 | Date: | 25.04.2018 | Language: | EN | [2018/17] | Type: | B1 Patent specification | No.: | EP3312015 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.02.2018 | Classification | IPC: | B41J29/393, B41J29/02, B41J2/355 | [2018/17] | CPC: |
B41J2/355 (EP,CN,US);
B41J2/0452 (US);
B41J2/04551 (US);
B41J2/04568 (US);
B41J2/0457 (US);
B41J29/023 (EP,US);
B41J29/38 (US);
B41J29/393 (EP,CN,US);
B41J3/36 (US);
H02P8/12 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/49] |
Former [2018/17] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BATTERIEBETRIEBENER DRUCKER UND VERFAHREN ZUR ANSTEUERUNG DES BATTERIEBETRIEBENEN DRUCKERS | [2018/17] | English: | BATTERY-POWERED PRINTER AND METHOD FOR DRIVING BATTERY-POWERED PRINTER | [2018/17] | French: | IMPRIMANTE ALIMENTÉE PAR BATTERIE ET PROCÉDÉ D'ENTRAÎNEMENT D'IMPRIMANTE ALIMENTÉE PAR BATTERIE | [2018/17] | Examination procedure | 23.10.2018 | Amendment by applicant (claims and/or description) | 25.10.2018 | Examination requested [2018/49] | 25.10.2018 | Date on which the examining division has become responsible | 30.11.2020 | Communication of intention to grant the patent | 16.03.2021 | Fee for grant paid | 16.03.2021 | Fee for publishing/printing paid | 16.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 13.09.2019 | Renewal fee patent year 03 | 14.09.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.09.2017 | AL | 28.04.2021 | AT | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | DK | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | FI | 28.04.2021 | HR | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | NL | 28.04.2021 | PL | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SE | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | TR | 28.04.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | IS | 28.08.2021 | PT | 30.08.2021 | IE | 25.09.2021 | LU | 25.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/29] |
Former [2024/22] | HU | 25.09.2017 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | HU | 25.09.2017 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/27] | HU | 25.09.2017 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/36] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/35] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 25.09.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 25.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/29] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/25] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/23] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/10] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/08] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/07] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/52] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/51] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/50] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
Former [2021/49] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
Former [2021/47] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
NL | 28.04.2021 | ||
BG | 28.07.2021 | ||
Former [2021/46] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | Documents cited: | Search | [I]US2004183840 (USHIGOME YOSUKE [JP]) [I] 1-4,8-12 * paragraph [0023]; figure 23; claim 4 *; | [I]JP2005354874 (CANON KK) [I] 1-4,8-12 * paragraph [0008]; figures 1, 2; claims 1, 4 *; | [XI]JP4225274B (BROTHER IND LTD) [X] 1-4,8-12 * paragraphs [0029] , [0 38]; figures 1, 4 * [I] 5-7,13-15; | [A]US2014379285 (DEMPSEY NANCY TAYLOR [US], et al) [A] 1,9 * paragraph [0042]; figure 6 *; | [XI]US2015172495 (OHHASHI KENICHI [JP]) [X] 1-4,8-12 * paragraphs [0023] , [0 67] , [0 73] , [0 74] , [0 79]; figure 10 * [I] 5-7,13-15; | [A]EP2935026 (ZIH CORP [US]) [A] 1,9* paragraphs [0027] , [0 39] , [ 124]; figure 8a *; | [I]US2016056665 (HATANAKA TAKEZO [JP], et al) [I] 1-4,8-12 * paragraphs [0079] , [0 80] , [ 131] , [ 170]; claim 1 *; | [A]US2016110141 (POOLE DAVID L [US], et al) [A] 1,9 * paragraph [0056]; figure 7 * |