blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3300880

EP3300880 - ROLLER PRESS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.12.2020
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  27.12.2019
FormerGrant of patent is intended
Status updated on  01.10.2019
FormerExamination is in progress
Status updated on  21.12.2018
FormerRequest for examination was made
Status updated on  28.09.2018
FormerThe application has been published
Status updated on  02.03.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Felbermayr, Natalia
Kremsstrasse 16
4553 Schlierbach / AT
[2018/47]
Former [2018/14]For all designated states
Felbermayr, Herbert
Kremsstrasse 16
4553 Schlierbach / AT
Inventor(s)01 / see applicant
...
 [2018/14]
Representative(s)Burgstaller, Peter
Rechtsanwalt Landstrasse 12 Arkade
4020 Linz / AT
[2018/14]
Application number, filing date17193483.927.09.2017
[2018/14]
Priority number, dateAT2016005087328.09.2016         Original published format: AT 508732016
[2018/14]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3300880
Date:04.04.2018
Language:DE
[2018/14]
Type: B1 Patent specification 
No.:EP3300880
Date:29.01.2020
Language:DE
[2020/05]
Search report(s)(Supplementary) European search report - dispatched on:EP20.02.2018
ClassificationIPC:B30B11/22, B30B15/02
[2018/14]
CPC:
B30B11/228 (EP,AT); B30B11/227 (EP); B30B15/026 (EP);
B30B15/028 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/44]
Former [2018/14]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KOLLERPRESSE[2018/14]
English:ROLLER PRESS[2018/14]
French:BROYEUR À ROULEAUX VERTICAUX[2018/14]
Examination procedure27.09.2017Date on which the examining division has become responsible
18.09.2018Amendment by applicant (claims and/or description)
25.09.2018Examination requested  [2018/44]
03.01.2019Despatch of a communication from the examining division (Time limit: M04)
19.04.2019Reply to a communication from the examining division
02.10.2019Communication of intention to grant the patent
26.11.2019Receipt of the translation of the claim(s)
17.12.2019Fee for grant paid
17.12.2019Fee for publishing/printing paid
Opposition(s)30.10.2020No opposition filed within time limit [2021/01]
Fees paidRenewal fee
30.07.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.09.2017
AL29.01.2020
CY29.01.2020
CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
MC29.01.2020
MK29.01.2020
MT29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
TR29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
IE27.09.2020
LU27.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
[2022/31]
Former [2022/30]HU27.09.2017
AL29.01.2020
CY29.01.2020
CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
MC29.01.2020
MT29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
TR29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
IE27.09.2020
LU27.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2022/28]HU27.09.2017
CY29.01.2020
CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
MC29.01.2020
MT29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
TR29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
IE27.09.2020
LU27.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2022/27]HU27.09.2017
CY29.01.2020
CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
MT29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
TR29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
IE27.09.2020
LU27.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2021/37]CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
IE27.09.2020
LU27.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2021/36]CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
LU27.09.2020
BE30.09.2020
FR30.09.2020
Former [2021/35]CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
LU27.09.2020
FR30.09.2020
Former [2021/27]CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
LU27.09.2020
Former [2021/10]CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
IT29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
PL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SI29.01.2020
SK29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
Former [2020/50]CZ29.01.2020
DK29.01.2020
EE29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SK29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
Former [2020/49]CZ29.01.2020
DK29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SK29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
Former [2020/48]DK29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
RO29.01.2020
RS29.01.2020
SE29.01.2020
SM29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
Former [2020/47]DK29.01.2020
ES29.01.2020
FI29.01.2020
HR29.01.2020
LT29.01.2020
LV29.01.2020
NL29.01.2020
RS29.01.2020
SE29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
Former [2020/45]FI29.01.2020
HR29.01.2020
LV29.01.2020
NL29.01.2020
RS29.01.2020
SE29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
Former [2020/40]FI29.01.2020
HR29.01.2020
LV29.01.2020
RS29.01.2020
SE29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
IS29.05.2020
PT21.06.2020
Former [2020/39]FI29.01.2020
HR29.01.2020
LV29.01.2020
RS29.01.2020
SE29.01.2020
BG29.04.2020
NO29.04.2020
GR30.04.2020
PT21.06.2020
Former [2020/38]FI29.01.2020
HR29.01.2020
LV29.01.2020
RS29.01.2020
SE29.01.2020
NO29.04.2020
GR30.04.2020
PT21.06.2020
Former [2020/37]FI29.01.2020
HR29.01.2020
LV29.01.2020
RS29.01.2020
SE29.01.2020
NO29.04.2020
PT21.06.2020
Former [2020/35]FI29.01.2020
NO29.04.2020
Documents cited:Search[XI]US2075450  (MEAKIN EDGAR N) [X] 1-5,8,10 * the whole document * [I] 7,13-15;
 [XI]US2764952  (MEAKIN EDGAR N) [X] 1-5,8,10,12 * the whole document * [I] 7,13;
 [X]US2065141  (MEAKIN EDGAR T) [X] 1 * the whole document *;
 [A]US2124744  (MEAKIN EDGAR T) [A] 1,14 * abstract *;
 [A]US2652007  (MEAKIN EDGAR N) [A] 1,14 * abstract *;
 [A]CN202958195U  (ZHENGZHOU JINTUDI ENERGY TECHNOLOGY CO LTD) [A] 14 * abstract *
ExaminationDE2714614
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.