blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3305492

EP3305492 - COMPOSITE MATERIALS AND RELATED METHODS [Right-click to bookmark this link]
Former [2018/15]RECYCLED COMPOSITE MATERIALS AND RELATED METHODS
[2019/45]
StatusNo opposition filed within time limit
Status updated on  09.07.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  31.07.2020
FormerGrant of patent is intended
Status updated on  23.10.2019
FormerExamination is in progress
Status updated on  15.04.2019
FormerRequest for examination was made
Status updated on  05.10.2018
FormerThe application has been published
Status updated on  09.03.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
GFSI Group LLC
21222 30th Drive SE, Building C, Suite 130
Bothell, WA 98021 / US
[2018/15]
Inventor(s)01 / WEYANT, Kenneth
1233 7th Ave. S.
Edmonds
Edmonds, WA 98020 / US
02 / LILLY, Don
18813 First Ave. W.
Bothell, WA 98012 / US
03 / ESSES, Ludlow
1110 North K. St.
Aberdeen, WA 98520 / US
 [2018/15]
Representative(s)J A Kemp LLP
80 Turnmill Street
London EC1M 5QU / GB
[N/P]
Former [2020/36]J A Kemp LLP
14 South Square
Gray's Inn
London WC1R 5JJ / GB
Former [2018/15]J A Kemp
14 South Square
Gray's Inn
London WC1R 5JJ / GB
Application number, filing date17194183.415.03.2011
[2018/15]
Priority number, dateUS20100340286P15.03.2010         Original published format: US 340286 P
[2018/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3305492
Date:11.04.2018
Language:EN
[2018/15]
Type: B1 Patent specification 
No.:EP3305492
Date:02.09.2020
Language:EN
[2020/36]
Search report(s)(Supplementary) European search report - dispatched on:EP08.03.2018
ClassificationIPC:B29C70/12, B29B17/00, B29B17/04, // B29K105/06, B29K709/08, B29L31/08, B29K105/24
[2019/45]
CPC:
B29B17/0042 (EP,US); C08J11/00 (US); B29B17/0404 (EP,US);
B29B17/0412 (EP,US); B29B9/10 (US); B29C70/12 (EP,US);
C08J5/043 (US); B27N3/007 (EP); B29B2017/0484 (EP,US);
B29C2793/0081 (EP,US); B29K2105/06 (EP,US); B29K2105/246 (EP,US);
B29K2709/08 (EP,US); B29L2031/085 (EP,US); C08J2367/00 (EP,US);
Y02P70/50 (EP,US); Y02W30/62 (US) (-)
Former IPC [2018/15]B29B17/00, B29B17/04, B29C70/00, B29C70/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/45]
Former [2018/15]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERBUNDMATERIALIEN UND ZUGEHÖRIGE VERFAHREN[2019/45]
English:COMPOSITE MATERIALS AND RELATED METHODS[2019/45]
French:MATÉRIAUX COMPOSITES ET PROCÉDÉS ASSOCIÉS[2019/45]
Former [2018/15]WIEDERAUFBEREITETE VERBUNDMATERIALIEN UND ZUGEHÖRIGE VERFAHREN
Former [2018/15]RECYCLED COMPOSITE MATERIALS AND RELATED METHODS
Former [2018/15]MATÉRIAUX COMPOSITES RECYCLÉS ET PROCÉDÉS ASSOCIÉS
Examination procedure27.09.2018Amendment by applicant (claims and/or description)
27.09.2018Examination requested  [2018/45]
27.09.2018Date on which the examining division has become responsible
18.04.2019Despatch of a communication from the examining division (Time limit: M04)
22.08.2019Reply to a communication from the examining division
24.10.2019Communication of intention to grant the patent
28.02.2020Fee for grant paid
28.02.2020Fee for publishing/printing paid
28.02.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP11756885.7  / EP2547509
Opposition(s)03.06.2021No opposition filed within time limit [2021/32]
Fees paidRenewal fee
29.09.2017Renewal fee patent year 03
29.09.2017Renewal fee patent year 04
29.09.2017Renewal fee patent year 05
29.09.2017Renewal fee patent year 06
29.09.2017Renewal fee patent year 07
13.03.2018Renewal fee patent year 08
13.03.2019Renewal fee patent year 09
23.07.2020Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2011
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
MT02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
[2024/42]
Former [2024/22]HU15.03.2011
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/33]HU15.03.2011
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/29]AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/24]AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/34]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/11]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/09]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
LU15.03.2021
Former [2022/07]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE15.03.2021
Former [2021/48]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/45]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/36]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/28]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/25]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/22]CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/21]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/10]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/09]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/08]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
Former [2021/07]FI02.09.2020
LT02.09.2020
NO02.12.2020
Documents cited:Search[A]EP0517175  (BASF AG [DE]) [A] 1-9 * column 1, line 1 - line 4 * * column 2, lines 7-11,12-15,47-51, * * column 5, lines 16-20,28-33 * * column 2, line 58 - column 3, line 1 * * column 5, lines 28-42 ** column 4, lines 4-7,17-18,33,28-37 *;
 [IY]US5681194  (BAKER RICHARD [CA]) [I] 1,3-5,7-9 * column 2, line 54 - line 65; figure 1 * * column 3, line 18 - line 23 * * column 4, line 19 - line 23 * * column 4, line 60 - line 64 * * column 2, line 36 - line 39 * * column 3, line 8 - line 23; figure 1 * * column 14, lines 48-55; figure 5 * * column 14, line 48 - line 55 * * column 15, line 18 - line 19 * * column 7, line 51 - line 55 * * column 9, line 19 - line 23; table of raw materials * * column 10, line 29 - line 33 * * example 5; claims 7,9 * [Y] 2,6;
 [Y]  - LARSEN ET AL, "Recycling wind turbine blades", RENEWABLE ENERGY FOCUS,, vol. 9, no. 7, doi:10.1016/S1755-0084(09)70045-6, ISSN 1755-0084, (20090101), pages 70 - 73, (20090101), XP025995802 [Y] 2,6 * page 70, column 1, paragraph 2 * * page 70, column 2, paragraph 6 * * page 71, column 1, paragraphs 10,12,13 * * page 71, column 2, paragraph 16 *

DOI:   http://dx.doi.org/10.1016/S1755-0084(09)70045-6
by applicantUS5569424
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.