EP3477307 - PIPETTING DEVICE AND PIPETTING DEVICE POSITIONING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.05.2021 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 19.06.2020 | ||
Former | Grant of patent is intended Status updated on 31.03.2020 | ||
Former | Request for examination was made Status updated on 08.11.2019 | ||
Former | The application has been published Status updated on 29.03.2019 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For:AL
AT
BE
BG
CH
CY
CZ
DK
EE
ES
FI
FR
GB
GR
HR
HU
IE
IS
IT
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
F. Hoffmann-La Roche AG Grenzacherstrasse 124 4070 Basel / CH | For:DE
Roche Diagnostics GmbH Sandhofer Straße 116 68305 Mannheim / DE | [2019/18] | Inventor(s) | 01 /
BELZ, Renato Forrenstrasse 2 6343 Rotkreuz / CH | 02 /
BUCHER, Armin Forrenstrasse 2 6343 Rotkreuz / CH | 03 /
JOHO, Reto Forrenstrasse 2 6343 Rotkreuz / CH | 04 /
KOEPPEN, Thomas Sandhofer Strasse 116 68305 Mannheim / DE | 05 /
MIZELLI, Maximilian Bad-Haller Strasse 32 4550 Kremsmünster / AT | 06 /
RIEPL, Markus Rudolf Bad-Haller Strasse 32 4550 Kremsmünster / AT | 07 /
WAGNER, Tamara Bad-Haller Strasse 32 4550 Kremsmünster / AT | [2020/30] |
Former [2019/18] | 01 /
BELZ, Renato Forrenstrasse 2 6343 Rotkreuz / CH | ||
02 /
BUCHER, Armin Forrenstrasse 2 6343 Rotkreuz / CH | |||
03 /
JOHO, Reto Forrenstrasse 2 6343 Rotkreuz / CH | |||
04 /
KOEPPEN, Thomas Sandhofer Strasse 116 68305 Mannheim / DE | |||
05 /
MIZELLI, Maximillian Bad-Haller Strasse 32 4550 Kremsmünster / AT | |||
06 /
RIEPL, Markus Rudolf Bad-Haller Strasse 32 4550 Kremsmünster / AT | |||
07 /
WAGNER, Tamara Bad-Haller Strasse 32 4550 Kremsmünster / AT | Representative(s) | Curcio, Mario Roche Diagnostics International AG Patents Forrenstrasse 2 6343 Rotkreuz / CH | [2019/18] | Application number, filing date | 17197939.6 | 24.10.2017 | [2019/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3477307 | Date: | 01.05.2019 | Language: | EN | [2019/18] | Type: | B1 Patent specification | No.: | EP3477307 | Date: | 22.07.2020 | Language: | EN | [2020/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.05.2018 | Classification | IPC: | G01N35/04, B01L3/00 | [2019/18] | CPC: |
B01L3/50825 (EP,US);
G01N35/04 (EP,CN,US);
G01N35/1011 (CN,US);
G01N35/1079 (EP);
B01L2300/042 (EP,US);
B01L2300/043 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/50] |
Former [2019/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PIPETTIERVORRICHTUNG UND PIPETTIERVORRICHTUNGPOSITIONIERUNGSSYSTEM | [2019/18] | English: | PIPETTING DEVICE AND PIPETTING DEVICE POSITIONING SYSTEM | [2019/18] | French: | DISPOSITIF DE PIPETTAGE ET SYSTÈME DE POSITIONNEMENT DE DISPOSITIF DE PIPETTAGE | [2019/18] | Examination procedure | 04.11.2019 | Examination requested [2019/50] | 04.11.2019 | Date on which the examining division has become responsible | 01.04.2020 | Communication of intention to grant the patent | 09.06.2020 | Fee for grant paid | 09.06.2020 | Fee for publishing/printing paid | 09.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 23.04.2021 | No opposition filed within time limit [2021/26] | Fees paid | Renewal fee | 11.10.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.10.2017 | AL | 22.07.2020 | AT | 22.07.2020 | CY | 22.07.2020 | CZ | 22.07.2020 | DK | 22.07.2020 | EE | 22.07.2020 | ES | 22.07.2020 | FI | 22.07.2020 | HR | 22.07.2020 | IT | 22.07.2020 | LT | 22.07.2020 | LV | 22.07.2020 | MC | 22.07.2020 | MK | 22.07.2020 | MT | 22.07.2020 | NL | 22.07.2020 | PL | 22.07.2020 | RO | 22.07.2020 | RS | 22.07.2020 | SE | 22.07.2020 | SI | 22.07.2020 | SK | 22.07.2020 | SM | 22.07.2020 | TR | 22.07.2020 | BG | 22.10.2020 | NO | 22.10.2020 | GR | 23.10.2020 | IE | 24.10.2020 | LU | 24.10.2020 | BE | 31.10.2020 | IS | 22.11.2020 | PT | 23.11.2020 | [2022/33] |
Former [2022/27] | HU | 24.10.2017 | |
AL | 22.07.2020 | ||
AT | 22.07.2020 | ||
CY | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
MT | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
TR | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IE | 24.10.2020 | ||
LU | 24.10.2020 | ||
BE | 31.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/46] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IE | 24.10.2020 | ||
LU | 24.10.2020 | ||
BE | 31.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/36] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
LU | 24.10.2020 | ||
BE | 31.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/31] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
LU | 24.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/28] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/25] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/22] | AT | 22.07.2020 | |
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/20] | AT | 22.07.2020 | |
DK | 22.07.2020 | ||
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
IT | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/17] | AT | 22.07.2020 | |
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/10] | AT | 22.07.2020 | |
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
PL | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/09] | AT | 22.07.2020 | |
ES | 22.07.2020 | ||
FI | 22.07.2020 | ||
LT | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
PT | 23.11.2020 | ||
Former [2021/08] | ES | 22.07.2020 | |
FI | 22.07.2020 | ||
LT | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
PT | 23.11.2020 | ||
Former [2021/07] | FI | 22.07.2020 | |
LT | 22.07.2020 | ||
NO | 22.10.2020 | Documents cited: | Search | [A]JPS59638 (TOKYO SHIBAURA ELECTRIC CO, et al) [A] 1-15 * paragraph [0001]; figures 4(A)-4(C) *; | [A]US5297599 (BUCHELI RUDOLF [CH]) [A] 1-15 * column 4, line 18 - page 5, line 9; figures 1-8 *; | [A]US2004067169 (KRAUSE REINHARD [DE]) [A] 1-15 * paragraphs [0016] , [0021] , [0022]; figures 1,2 *; | [A]EP2423688 (HOFFMANN LA ROCHE [CH], et al) [A] 1-15* paragraph [0081] - paragraph [0086]; figures 1,6a-6c *; | [A]US2013121882 (KIMURA RYUSUKE [JP], et al) [A] 1-15 * paragraphs [0021] , [0027] , [0028] , [0031]; figures 1-4 * |