| EP3477101 - WIND TURBINE WITH A NACELLE INCLUDING A WATER DRAINING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.04.2021 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 01.05.2020 | ||
| Former | Grant of patent is intended Status updated on 07.01.2020 | ||
| Former | Request for examination was made Status updated on 21.06.2019 | ||
| Former | The application has been published Status updated on 29.03.2019 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Siemens Gamesa Renewable Energy A/S Borupvej 16 7330 Brande / DK | [2019/18] | Inventor(s) | 01 /
Airoldi, Giovanni Nordborggade 14 8000 Aarhus / DK | [2019/18] | Representative(s) | Aspacher, Karl-Georg Siemens Gamesa Renewable Energy GmbH & Co. KG Otto-Hahn-Ring 6 81739 München / DE | [2019/18] | Application number, filing date | 17198324.0 | 25.10.2017 | [2019/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3477101 | Date: | 01.05.2019 | Language: | EN | [2019/18] | Type: | B1 Patent specification | No.: | EP3477101 | Date: | 03.06.2020 | Language: | EN | [2020/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.04.2018 | Classification | IPC: | F03D80/60 | [2019/18] | CPC: |
F03D80/60 (EP,US);
F03D80/80 (US);
F03D9/25 (US);
F05B2240/14 (US);
F05B2260/20 (US);
F05B2260/602 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] |
| Former [2019/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WINDTURBINE MIT EINER GONDEL MIT WASSERABLAUFVORRICHTUNG | [2019/18] | English: | WIND TURBINE WITH A NACELLE INCLUDING A WATER DRAINING DEVICE | [2019/18] | French: | ÉOLIENNE À NACELLE COMPRENANT UN DISPOSITIF DE DRAINAGE D'EAU | [2019/18] | Examination procedure | 17.06.2019 | Examination requested [2019/30] | 17.06.2019 | Date on which the examining division has become responsible | 21.06.2019 | Amendment by applicant (claims and/or description) | 08.01.2020 | Communication of intention to grant the patent | 22.04.2020 | Receipt of the translation of the claim(s) | 23.04.2020 | Fee for grant paid | 23.04.2020 | Fee for publishing/printing paid | Opposition(s) | 04.03.2021 | No opposition filed within time limit [2021/19] | Fees paid | Renewal fee | 18.10.2019 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.10.2017 | AL | 03.06.2020 | AT | 03.06.2020 | CY | 03.06.2020 | CZ | 03.06.2020 | DK | 03.06.2020 | EE | 03.06.2020 | ES | 03.06.2020 | FI | 03.06.2020 | HR | 03.06.2020 | IT | 03.06.2020 | LT | 03.06.2020 | LV | 03.06.2020 | MC | 03.06.2020 | MK | 03.06.2020 | MT | 03.06.2020 | PL | 03.06.2020 | RO | 03.06.2020 | RS | 03.06.2020 | SE | 03.06.2020 | SI | 03.06.2020 | SK | 03.06.2020 | SM | 03.06.2020 | TR | 03.06.2020 | BG | 03.09.2020 | NO | 03.09.2020 | GR | 04.09.2020 | IS | 03.10.2020 | PT | 06.10.2020 | IE | 25.10.2020 | LU | 25.10.2020 | BE | 31.10.2020 | CH | 31.10.2020 | LI | 31.10.2020 | [2022/33] |
| Former [2022/27] | HU | 25.10.2017 | |
| AL | 03.06.2020 | ||
| AT | 03.06.2020 | ||
| CY | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| MT | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| TR | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| IE | 25.10.2020 | ||
| LU | 25.10.2020 | ||
| BE | 31.10.2020 | ||
| CH | 31.10.2020 | ||
| LI | 31.10.2020 | ||
| Former [2021/46] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| IE | 25.10.2020 | ||
| LU | 25.10.2020 | ||
| BE | 31.10.2020 | ||
| CH | 31.10.2020 | ||
| LI | 31.10.2020 | ||
| Former [2021/37] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| LU | 25.10.2020 | ||
| BE | 31.10.2020 | ||
| CH | 31.10.2020 | ||
| LI | 31.10.2020 | ||
| Former [2021/36] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| LU | 25.10.2020 | ||
| BE | 31.10.2020 | ||
| Former [2021/31] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| MC | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| LU | 25.10.2020 | ||
| Former [2021/24] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SI | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/21] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| DK | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/10] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| PL | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SK | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| IS | 03.10.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/09] | AL | 03.06.2020 | |
| AT | 03.06.2020 | ||
| CZ | 03.06.2020 | ||
| EE | 03.06.2020 | ||
| ES | 03.06.2020 | ||
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| IT | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RO | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| SM | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| PT | 06.10.2020 | ||
| Former [2021/04] | AL | 03.06.2020 | |
| FI | 03.06.2020 | ||
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2021/01] | FI | 03.06.2020 | |
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| BG | 03.09.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2020/51] | FI | 03.06.2020 | |
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| RS | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2020/50] | FI | 03.06.2020 | |
| HR | 03.06.2020 | ||
| LT | 03.06.2020 | ||
| LV | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| NO | 03.09.2020 | ||
| GR | 04.09.2020 | ||
| Former [2020/48] | FI | 03.06.2020 | |
| LT | 03.06.2020 | ||
| SE | 03.06.2020 | ||
| NO | 03.09.2020 | ||
| Former [2020/47] | LT | 03.06.2020 | |
| NO | 03.09.2020 | Documents cited: | Search | [IY] CN103184982 (SINOVEL WIND GROUP CO LTD et al.) [I] 1,5-9 * paragraph [0029]; figure 1 * * paragraph [0034] - paragraph [0036] * * paragraph [0038] *[Y] 2-4 | [Y] DE102005025944 (SIEMENS AG et al.) [Y] 2-4 * paragraph [0006] - paragraph [0007] * * paragraph [0035] - paragraph [0039]; figures 1-3 * | [A] WO2008092449 (VESTAS WIND SYS AS et al.) [A] 1-9 * page 12, line 12 - line 27 * * page 13, line 7 - line 13 * * page 17, line 6 - line 16; figure 2 * | [A] EP2034181 (GEN ELECTRIC et al.) [A] 1-9 * paragraph [0013] - paragraph [0014] * * figure 5 * |