blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3319232

EP3319232 - POWER SOURCE APPARATUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.04.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  14.05.2021
FormerGrant of patent is intended
Status updated on  24.02.2021
FormerExamination is in progress
Status updated on  08.11.2019
FormerRequest for examination was made
Status updated on  17.08.2018
FormerThe application has been published
Status updated on  06.04.2018
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Funai Electric Co., Ltd.
7-7-1, Nakagaito
Daito
Osaka 574-0013 / JP
[2018/19]
Inventor(s)01 / WAKABAYASHI, Naoyuki
c/o Funai Electric Co., Ltd.
7-7-1 Nakagaito
Daito
Osaka, Osaka 574-0013 / JP
02 / NISHIKAWA, Takafumi
c/o Funai Electric Co., Ltd.
7-7-1 Nakagaito
Daito
Osaka, Osaka 574-0013 / JP
03 / OHIRA, Koji
c/o Funai Electric Co., Ltd.
7-7-1 Nakagaito
Daito
Osaka, Osaka 574-0013 / JP
 [2018/19]
Representative(s)Osha BWB
2, rue de la Paix
75002 Paris / FR
[N/P]
Former [2018/19]Osha Liang
2, rue de la Paix
75002 Paris / FR
Application number, filing date17199814.903.11.2017
[2018/19]
Priority number, dateJP2016021654804.11.2016         Original published format: JP 2016216548
[2018/19]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3319232
Date:09.05.2018
Language:EN
[2018/19]
Type: B1 Patent specification 
No.:EP3319232
Date:16.06.2021
Language:EN
[2021/24]
Search report(s)(Supplementary) European search report - dispatched on:EP21.03.2018
ClassificationIPC:H03F1/00, H03F3/00, H02M5/00, H02M7/00, H02M1/00, H03F3/217
[2021/10]
CPC:
H03F3/2176 (EP,US); H02M3/24 (US); H02M3/156 (US);
Y02B70/10 (US)
Former IPC [2018/19]H03F3/217
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/38]
Former [2018/19]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:STROMQUELLENVORRICHTUNG[2018/19]
English:POWER SOURCE APPARATUS[2018/19]
French:APPAREIL DE SOURCE D'ALIMENTATION[2018/19]
Examination procedure03.11.2017Date on which the examining division has become responsible
08.08.2018Amendment by applicant (claims and/or description)
08.08.2018Examination requested  [2018/38]
12.11.2019Despatch of a communication from the examining division (Time limit: M02)
02.01.2020Reply to a communication from the examining division
25.02.2021Communication of intention to grant the patent
05.05.2021Fee for grant paid
05.05.2021Fee for publishing/printing paid
05.05.2021Receipt of the translation of the claim(s)
Opposition(s)17.03.2022No opposition filed within time limit [2022/21]
Fees paidRenewal fee
27.11.2019Renewal fee patent year 03
27.11.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.11.2017
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
MT16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
GB03.11.2021
IE03.11.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
[2024/41]
Former [2024/22]HU03.11.2017
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
GB03.11.2021
IE03.11.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2023/30]HU03.11.2017
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
GB03.11.2021
IE03.11.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2023/29]HU03.11.2017
AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
GB03.11.2021
IE03.11.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2023/01]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
GB03.11.2021
IE03.11.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
FR30.11.2021
LI30.11.2021
Former [2022/48]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
GB03.11.2021
IE03.11.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/47]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
GB03.11.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/37]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
LU03.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/36]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
LU03.11.2021
BE30.11.2021
Former [2022/34]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
LU03.11.2021
BE30.11.2021
Former [2022/33]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
BE30.11.2021
Former [2022/29]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/26]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/21]AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/10]AT16.06.2021
CZ16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/09]AT16.06.2021
CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
PT18.10.2021
Former [2022/08]AT16.06.2021
CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2022/07]AT16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/51]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
RS16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/49]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/47]FI16.06.2021
LT16.06.2021
BG16.09.2021
Former [2021/46]FI16.06.2021
LT16.06.2021
Documents cited:Search[XI]JP2008252214  (ADVANCE DESIGN CORP) [X] 1-4 * paragraphs [0005] , [0017] , [0047] - [0054] - [0061] * [I] 5-15;
 [XI]US2009201004  (HONDA TADASHI [JP]) [X] 1-4 * paragraph [0080] - paragraph [0086]; figures 1,3; claim 1 * [I] 5-15;
 [XI]US7995318  (FELLER MURRAY F [US]) [X] 1-4 * figure all *[I] 7-15
ExaminationWO0103288
 US2012319782
 US2013188408
 JP2013198309
 KR101671818B
 US2020244236
by applicantJPH06243985
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.