blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3312136

EP3312136 - DEVICE WITH A SPRING AND AN ELEMENT SUSPENDED FROM IT AND METHOD FOR MANUFACTURING THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 13.11.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  20.11.2019
FormerRequest for examination was made
Status updated on  02.11.2018
FormerThe application has been published
Status updated on  23.03.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
Hansastraße 27c
80686 München / DE
[2018/17]
Inventor(s)01 / GU-STOPPEL, Shanshan
Lindenstr. 94
25524 Itzehoe / DE
02 / QUENZER, Hans-Joachim
Schubertstraße 10
25524 Itzehoe / DE
03 / HOFMANN, Ulrich
Edendorferstraße 117k
25524 Itzehoe / DE
 [2018/17]
Representative(s)Schenk, Markus, et al
Schoppe, Zimmermann, Stöckeler
Zinkler, Schenk & Partner mbB
Patentanwälte
Radlkoferstrasse 2
81373 München / DE
[2018/17]
Application number, filing date17205899.216.05.2014
[2018/17]
Priority number, dateDE20131020923817.05.2013         Original published format: DE102013209238
[2018/17]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3312136
Date:25.04.2018
Language:DE
[2018/17]
Type: B1 Patent specification 
No.:EP3312136
Date:13.05.2020
Language:DE
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP08.02.2018
ClassificationIPC:B81C1/00
[2018/17]
CPC:
B81C1/00626 (EP,CN,US); B81B3/0027 (US); B81B3/0029 (US);
B81C1/00357 (US); H01L29/84 (US); B81B2201/042 (EP,CN,US);
B81B2203/0109 (EP,CN,US); B81B2203/0163 (EP,CN,US); B81C2201/014 (EP,CN,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/49]
Former [2018/17]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VORRICHTUNG MIT EINER FEDER UND EINEM DARAN AUFGEHÄNGTEN ELEMENT UND VERFAHREN ZUM HERSTELLEN DESSELBEN[2018/17]
English:DEVICE WITH A SPRING AND AN ELEMENT SUSPENDED FROM IT AND METHOD FOR MANUFACTURING THE SAME[2018/17]
French:DISPOSITIF DOTÉ D'UN RESSORT ET D'UN ÉLÉMENT SUSPENDU AUDIT RESSORT ET SON PROCÉDÉ DE FABRICATION[2018/17]
Examination procedure25.10.2018Amendment by applicant (claims and/or description)
25.10.2018Examination requested  [2018/49]
25.10.2018Date on which the examining division has become responsible
21.11.2019Communication of intention to grant the patent
30.03.2020Fee for grant paid
30.03.2020Fee for publishing/printing paid
30.03.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP14168566.9  / EP2803635
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Fees paidRenewal fee
07.12.2017Renewal fee patent year 03
07.12.2017Renewal fee patent year 04
03.05.2018Renewal fee patent year 05
10.05.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.05.2014
AL13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
AT16.05.2020
IE16.05.2020
LU16.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
[2022/33]
Former [2022/27]HU16.05.2014
AL13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
AT16.05.2020
IE16.05.2020
LU16.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/37]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
AT16.05.2020
IE16.05.2020
LU16.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/24]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE16.05.2020
LU16.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/20]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
IE16.05.2020
LU16.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/15]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
LU16.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/13]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
CH31.05.2020
LI31.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Documents cited:Search[AD]US2006180883  (KOUMA NORINAO [JP], et al) [AD] 1-15 * figures 25A-28C * * paragraph [0143] - paragraph [0158] *;
 [A]EP2100848  (FRAUNHOFER GES FORSCHUNG [DE], et al) [A] 1-15 * figures 13, 15 * * paragraph [0083] *;
 [A]US2011136283  (GRITTERS JOHN [US], et al) [A] 1-15 * figures 2, 2A, 2B, 3A, 3B ** paragraph [0026] - paragraph [0055] *
by applicantUS2006180883
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.