| EP3337196 - SYSTEMS AND METHODS FOR IMPROVED GEOLOCATION IN A LOW POWER WIDE AREA NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.09.2022 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 24.09.2021 | ||
| Former | Grant of patent is intended Status updated on 17.05.2021 | ||
| Former | Examination is in progress Status updated on 09.04.2021 | ||
| Former | Grant of patent is intended Status updated on 16.12.2020 | ||
| Former | Examination is in progress Status updated on 07.06.2019 | ||
| Former | Request for examination was made Status updated on 30.12.2018 | ||
| Former | The application has been published Status updated on 18.05.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Comcast Cable Communications, LLC 1701 John F. Kennedy Boulevard Philadelphia, PA 19103 / US | [2018/25] | Inventor(s) | 01 /
VerSteeg, William Carroll 6402 Lakeview Drive Buford, Georgia 30518 / US | [2018/25] | Representative(s) | V.O. P.O. Box 87930 Carnegieplein 5 2508 DH Den Haag / NL | [2018/25] | Application number, filing date | 17207451.0 | 14.12.2017 | [2018/25] | Priority number, date | US201662435422P | 16.12.2016 Original published format: US 201662435422 P | [2018/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3337196 | Date: | 20.06.2018 | Language: | EN | [2018/25] | Type: | B1 Patent specification | No.: | EP3337196 | Date: | 27.10.2021 | Language: | EN | [2021/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.04.2018 | Classification | IPC: | H04W4/02, G01S5/02, H04W52/02, G01S1/04, // G01S5/06, G01S5/14, H04W64/00 | [2021/01] | CPC: |
H04W52/0209 (EP,US);
G01S1/0423 (EP,US);
G01S1/0428 (EP);
G01S5/01 (EP);
G01S5/019 (EP,US);
G01S5/0244 (EP,US);
H04W4/02 (EP,US);
G01S2201/01 (EP);
G01S5/06 (EP,US);
G01S5/14 (EP,US);
H04W64/00 (EP,US);
H04W84/04 (US);
Y02D30/70 (EP,US)
(-)
|
| Former IPC [2018/25] | H04W4/02, H04W64/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/05] |
| Former [2018/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEME UND VERFAHREN ZUR VERBESSERTEN GEOLOKALISIERUNG IN EINEM LEISTUNGSARMEN WEITBEREICHSNETZWERK | [2018/25] | English: | SYSTEMS AND METHODS FOR IMPROVED GEOLOCATION IN A LOW POWER WIDE AREA NETWORK | [2018/25] | French: | SYSTÈMES ET PROCÉDÉS POUR AMÉLIORER LA GÉOLOCALISATION DANS UN RÉSEAU ÉTENDU DE FAIBLE PUISSANCE | [2018/25] | Examination procedure | 19.12.2018 | Amendment by applicant (claims and/or description) | 19.12.2018 | Examination requested [2019/05] | 19.12.2018 | Date on which the examining division has become responsible | 12.06.2019 | Despatch of a communication from the examining division (Time limit: M06) | 20.12.2019 | Reply to a communication from the examining division | 23.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 21.08.2020 | Reply to a communication from the examining division | 18.09.2020 | Despatch of a communication from the examining division (Time limit: M02) | 17.11.2020 | Reply to a communication from the examining division | 17.12.2020 | Communication of intention to grant the patent | 08.04.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 18.05.2021 | Communication of intention to grant the patent | 21.09.2021 | Fee for grant paid | 21.09.2021 | Fee for publishing/printing paid | 21.09.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 28.07.2022 | No opposition filed within time limit [2022/40] | Fees paid | Renewal fee | 27.12.2019 | Renewal fee patent year 03 | 28.12.2020 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.12.2017 | AL | 27.10.2021 | AT | 27.10.2021 | CY | 27.10.2021 | CZ | 27.10.2021 | DK | 27.10.2021 | EE | 27.10.2021 | ES | 27.10.2021 | FI | 27.10.2021 | HR | 27.10.2021 | IT | 27.10.2021 | LT | 27.10.2021 | LV | 27.10.2021 | MC | 27.10.2021 | MK | 27.10.2021 | MT | 27.10.2021 | NL | 27.10.2021 | PL | 27.10.2021 | RO | 27.10.2021 | RS | 27.10.2021 | SE | 27.10.2021 | SI | 27.10.2021 | SK | 27.10.2021 | SM | 27.10.2021 | TR | 27.10.2021 | IE | 14.12.2021 | LU | 14.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | BG | 27.01.2022 | NO | 27.01.2022 | GR | 28.01.2022 | IS | 27.02.2022 | PT | 28.02.2022 | [2026/04] |
| Former [2024/41] | HU | 14.12.2017 | |
| AL | 27.10.2021 | ||
| AT | 27.10.2021 | ||
| CY | 27.10.2021 | ||
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| IT | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| MK | 27.10.2021 | ||
| MT | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2024/22] | HU | 14.12.2017 | |
| AL | 27.10.2021 | ||
| AT | 27.10.2021 | ||
| CY | 27.10.2021 | ||
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| IT | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| MK | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2023/30] | HU | 14.12.2017 | |
| AL | 27.10.2021 | ||
| AT | 27.10.2021 | ||
| CY | 27.10.2021 | ||
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| IT | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2023/27] | HU | 14.12.2017 | |
| AL | 27.10.2021 | ||
| AT | 27.10.2021 | ||
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| IT | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2023/03] | AL | 27.10.2021 | |
| AT | 27.10.2021 | ||
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2023/01] | AL | 27.10.2021 | |
| AT | 27.10.2021 | ||
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BE | 31.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/49] | AL | 27.10.2021 | |
| AT | 27.10.2021 | ||
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/48] | AT | 27.10.2021 | |
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| IE | 14.12.2021 | ||
| LU | 14.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/46] | AT | 27.10.2021 | |
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| LU | 14.12.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/35] | AT | 27.10.2021 | |
| CZ | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/34] | AT | 27.10.2021 | |
| EE | 27.10.2021 | ||
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/33] | AT | 27.10.2021 | |
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/25] | AT | 27.10.2021 | |
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/24] | AT | 27.10.2021 | |
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/23] | AT | 27.10.2021 | |
| ES | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| PL | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/22] | AT | 27.10.2021 | |
| FI | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| Former [2022/21] | AT | 27.10.2021 | |
| RS | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| Former [2022/19] | BG | 27.01.2022 | Documents cited: | Search | [XAI] US2007111746 (ANDERSON ROBERT J et al.) [X] 1,2,4-6,9,10,14,15 * paragraphs [0023] , [0024] , [0028] , [0031] , [0034] , [0043] , [0045] , [0051] - [0053] - [0059] , [0060] , [0064] , [0120]; figure 2 *[A] 13 [I] 3 | [XI] WO2016019522 (FUJITSU LTD et al.) [X] 1,7,8,11,12,14,15 * the whole document *[I] 13 | [XI] US2017150475 (LI HONGCHAO et al.) * paragraphs [0038] - [0044] - [0048] , [0050] , [0052] - [0058] - [0065] , [0066] , [0086] - [0092]; figures 4,5 *[I] 13 | [A] US2012026041 (MURDOCK RONALD G et al.) [A] 1-15 * paragraphs [0006] , [0007] , [0019] , [0040] - [0045] - [0052] - [0055] - [0056]; figure 2 * | [A] US2016095092 (KHORYAEV ALEXEY et al.) [A] 1-15 * paragraphs [0013] , [0014] , [0161] , [0007] , [0031] , [0033] - [0039] - [0048] - [0050]; figure 3 * |