EP3340100 - ADDITIVE MANUFACTURING SYSTEM AND METHOD FOR VALIDATING ADDITIVELY MANUFACTURED COMPONENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 26.03.2021 | ||
Former | Grant of patent is intended Status updated on 23.11.2020 | ||
Former | Examination is in progress Status updated on 28.05.2019 | ||
Former | Request for examination was made Status updated on 19.10.2018 | ||
Former | The application has been published Status updated on 25.05.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | [2021/17] |
Former [2018/26] | For all designated states Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | Inventor(s) | 01 /
HEGENBART, Matthias c/o Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | 02 /
GOSCH, Claus c/o Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | 03 /
LINDE, Peter c/o Airbus Operations GmbH Kreetslag 10 21129 Hamburg / DE | [2018/26] | Representative(s) | (deleted) | [2021/17] |
Former [2018/26] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | Application number, filing date | 17207896.6 | 18.12.2017 | [2018/26] | Priority number, date | DE201610226159 | 23.12.2016 Original published format: DE102016226159 | [2018/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3340100 | Date: | 27.06.2018 | Language: | EN | [2018/26] | Type: | B1 Patent specification | No.: | EP3340100 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.05.2018 | Classification | IPC: | G06F21/60 | [2018/26] | CPC: |
G06F21/608 (EP,US);
B22F10/12 (EP,US);
B22F10/25 (EP,US);
B22F10/80 (EP,US);
B29C64/135 (US);
B29C64/386 (US);
B33Y10/00 (US);
B33Y30/00 (US);
B33Y50/00 (US);
H03M13/09 (US);
B22F12/41 (EP,US);
B22F12/49 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/47] |
Former [2018/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM ZUR GENERATIVEN FERTIGUNG UND VERFAHREN ZUR VALIDIERUNG GENERATIV GEFERTIGTER KOMPONENTEN | [2018/26] | English: | ADDITIVE MANUFACTURING SYSTEM AND METHOD FOR VALIDATING ADDITIVELY MANUFACTURED COMPONENTS | [2018/26] | French: | SYSTÈME ET PROCÉDÉ DE FABRICATION ADDITIVE POUR VALIDER DES COMPOSANTS FABRIQUÉS DE MANIÈRE ADDITIVE | [2018/26] | Examination procedure | 12.10.2018 | Amendment by applicant (claims and/or description) | 12.10.2018 | Examination requested [2018/47] | 12.10.2018 | Date on which the examining division has become responsible | 03.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 05.09.2019 | Reply to a communication from the examining division | 21.09.2020 | Cancellation of oral proceeding that was planned for 24.09.2020 | 24.09.2020 | Date of oral proceedings (cancelled) | 24.11.2020 | Communication of intention to grant the patent | 23.03.2021 | Fee for grant paid | 23.03.2021 | Fee for publishing/printing paid | 23.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 23.12.2019 | Renewal fee patent year 03 | 24.12.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.12.2017 | AL | 28.04.2021 | AT | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | DK | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | FI | 28.04.2021 | HR | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | MT | 28.04.2021 | NL | 28.04.2021 | PL | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SE | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | TR | 28.04.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | IS | 28.08.2021 | PT | 30.08.2021 | IE | 18.12.2021 | LU | 18.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/41] |
Former [2024/29] | HU | 18.12.2017 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
TR | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 18.12.2021 | ||
LU | 18.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2024/22] | HU | 18.12.2017 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 18.12.2021 | ||
LU | 18.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | HU | 18.12.2017 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 18.12.2021 | ||
LU | 18.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 18.12.2017 | |
AL | 28.04.2021 | ||
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 18.12.2021 | ||
LU | 18.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 18.12.2021 | ||
LU | 18.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 18.12.2021 | ||
LU | 18.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
IE | 18.12.2021 | ||
LU | 18.12.2021 | ||
Former [2022/46] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 18.12.2021 | ||
Former [2022/36] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/33] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/29] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/26] | AL | 28.04.2021 | |
AT | 28.04.2021 | ||
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/23] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/10] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/08] | AT | 28.04.2021 | |
CZ | 28.04.2021 | ||
DK | 28.04.2021 | ||
ES | 28.04.2021 | ||
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/07] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/52] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
PL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/51] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
RS | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/50] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
Former [2021/49] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
NL | 28.04.2021 | ||
SE | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
Former [2021/47] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | ||
NL | 28.04.2021 | ||
BG | 28.07.2021 | ||
Former [2021/46] | AT | 28.04.2021 | |
FI | 28.04.2021 | ||
LT | 28.04.2021 | Documents cited: | Search | [X]US2009165126 (JUNG EDWARD K Y [US], et al) [X] 1-16 * paragraph [0022] - paragraph [0075] *; | [A]EP2757736 (FABULONIA OÜ [EE]) [A] 1-16 * paragraph [0034] - paragraph [0053] *; | [T] - Carmelo Demaria, "Softwares for 3D printing", (20131126), URL: http://www.centropiaggio.unipi.it/sites/default/files/course/material/2013-11-26%20Software%20per%203D%20printing.pdf, (20180507), XP055473202 [T] 1-16 * page 41 - page 62 * | [A] - Müller Jens, "Exploiting Network Printers a survey of security flaws in Laser Printers and Multi-function devices", Research-Technology Management, (20160930), URL: https://www.nds.rub.de/media/ei/arbeiten/2017/01/30/exploiting-printers.pdf, (20180507), XP055473224 [A] 1-16 * paragraph [0006] - paragraph [0007] * | [A] - November 2016, "3D PRINTING AND THE FUTURE OF SUPPLY CHAINS A DHL perspective on the state of 3D printing and implications for logistics", (20161130), URL: http://www.dhl.com/content/dam/downloads/g0/about_us/logistics_insights/dhl_trendreport_3dprinting.pdf, (20180507), XP055473197 [A] 1-16 * paragraph [0003] * |