blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3503599

EP3503599 - EMERGENCY NETWORK SLICE AND METHOD AND ACCESS NETWORK ENTITY FOR PROCESSING AN EMERGENCY COMMUNICATION IN A PACKET SWITCHED COMMUNICATION NETWORK [Right-click to bookmark this link]
Former [2019/26]EMERGENCY NETWORK SLICE AND METHOD FOR PROCESSING AN EMERGENCY COMMUNICATION IN A PACKET SWITCHED COMMUNICATION NETWORK
[2019/45]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  14.11.2019
FormerRequest for examination was made
Status updated on  24.05.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE, MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Deutsche Telekom AG
Friedrich-Ebert-Allee 140
53113 Bonn / DE
[2020/15]
Former [2019/26]For all designated states
Deutsche Telekom AG
Friedrich-Ebert-Allee 140
53113 Bonn / DE
Inventor(s)01 / Lauster, Reinhard
Südtirolerstraße 30
3100 St. Pölten / AT
 [2019/26]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
P.O. Box 86 07 67
81634 München / DE
[2020/15]
Former [2019/26]Patentship Patentanwaltsgesellschaft mbH
Elsenheimerstraße 65
80687 München / DE
Application number, filing date17210112.322.12.2017
[2019/26]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3503599
Date:26.06.2019
Language:EN
[2019/26]
Type: B1 Patent specification 
No.:EP3503599
Date:08.04.2020
Language:EN
[2020/15]
Search report(s)(Supplementary) European search report - dispatched on:EP16.05.2018
ClassificationIPC:H04W4/90, H04W76/50, H04W48/18, H04L29/08, H04L29/06, H04L12/755, // H04L12/46, H04L12/701, H04M1/725, H04M3/51, H04M11/04, H04W36/00, H04W84/04, H04W88/02
[2019/45]
CPC:
H04W4/90 (EP,US); H04L12/4641 (EP); H04L45/021 (EP);
H04L65/1016 (EP); H04L65/1069 (EP); H04W36/0066 (EP,US);
H04W36/13 (EP,US); H04W4/029 (US); H04W40/02 (US);
H04W76/50 (EP,US); H04L67/52 (EP); H04M1/72418 (EP);
H04M11/04 (EP); H04M2242/04 (EP); H04M3/5116 (EP);
H04Q2213/1337 (EP); H04W48/18 (EP); H04W84/042 (EP,US);
H04W88/02 (EP) (-)
Former IPC [2019/26]H04W4/90, H04W76/50, H04W48/18, H04L29/08, H04L29/06, // H04L12/46, H04L12/701, H04M1/725, H04M3/51, H04M11/04, H04W36/00, H04W84/04, H04W88/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/26]
TitleGerman:NOTFALLNETZWERKSEGMENT UND VERFAHREN UND ZUGANGSNETZWERKSEINHEIT ZUM VERARBEITEN EINER NOTFALLKOMMUNIKATION IN EINEM PAKETVERMITTELTEN KOMMUNIKATIONSNETZWERK[2019/45]
English:EMERGENCY NETWORK SLICE AND METHOD AND ACCESS NETWORK ENTITY FOR PROCESSING AN EMERGENCY COMMUNICATION IN A PACKET SWITCHED COMMUNICATION NETWORK[2019/45]
French:TRANCHE DU RÉSEAU D'URGENCE ET PROCÉDÉ DE TRAITEMENT D'UNE COMMUNICATION D'URGENCE DANS UN RÉSEAU DE COMMUNICATION À COMMUTATION PAR PAQUETS, ET ENTITÉ DU RÉSEAU D'ACCÈS CORRESPONDANTE[2019/45]
Former [2019/26]NOTFALLNETZWERKSEGMENT UND VERFAHREN ZUM VERARBEITEN EINER NOTFALLKOMMUNIKATION IN EINEM PAKETVERMITTELTEN KOMMUNIKATIONSNETZWERK
Former [2019/26]EMERGENCY NETWORK SLICE AND METHOD FOR PROCESSING AN EMERGENCY COMMUNICATION IN A PACKET SWITCHED COMMUNICATION NETWORK
Former [2019/26]TRANCHE DU RÉSEAU D'URGENCE ET PROCÉDÉ DE TRAITEMENT D'UNE COMMUNICATION D'URGENCE DANS UN RÉSEAU DE COMMUNICATION À COMMUTATION PAR PAQUETS
Examination procedure16.08.2018Amendment by applicant (claims and/or description)
16.08.2018Examination requested  [2019/26]
16.08.2018Date on which the examining division has become responsible
15.11.2019Communication of intention to grant the patent
02.03.2020Fee for grant paid
02.03.2020Fee for publishing/printing paid
02.03.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
17.12.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL08.04.2020
CY08.04.2020
DK08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
IE22.12.2020
LU22.12.2020
BE31.12.2020
[2022/33]
Former [2022/28]AL08.04.2020
CY08.04.2020
DK08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MT08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
IE22.12.2020
LU22.12.2020
Former [2021/46]AL08.04.2020
DK08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
IE22.12.2020
LU22.12.2020
Former [2021/40]AL08.04.2020
DK08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/24]AL08.04.2020
DK08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/12]AL08.04.2020
DK08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
DK08.04.2020
EE08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/08]AL08.04.2020
DK08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/48]FI08.04.2020
LT08.04.2020
SE08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
NO08.07.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Documents cited:Search[A]US2009316683  (GASS RAYMOND [FR], et al);
 [A]US2009323672  (GUPTA VIVEK [US], et al);
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.