EP3438993 - A DYNAMIC POWER CABLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.08.2022 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 03.09.2021 | ||
Former | Grant of patent is intended Status updated on 24.01.2021 | ||
Former | Examination is in progress Status updated on 09.03.2020 | ||
Former | Request for examination was made Status updated on 09.08.2019 | ||
Former | The application has been published Status updated on 04.01.2019 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Nexans 4, Allée de l'Arche 92400 Courbevoie / FR | [2019/06] | Inventor(s) | 01 /
JOHANSON, Audun Hagegata 46 0653 OSLO / NO | [2019/06] | Representative(s) | Ipsilon Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | [2021/40] |
Former [2019/06] | Lenne, Laurence Ipsilon Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | Application number, filing date | 17306030.2 | 02.08.2017 | [2019/06] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3438993 | Date: | 06.02.2019 | Language: | EN | [2019/06] | Type: | B1 Patent specification | No.: | EP3438993 | Date: | 06.10.2021 | Language: | EN | [2021/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.01.2018 | Classification | IPC: | H01B7/282, H01B7/14, H01B13/26, C22C9/06, H01B1/02, H01B7/04 | [2021/03] | CPC: |
H01B7/2825 (EP,US);
H01B11/1817 (KR);
C22C9/06 (EP,US);
H01B1/026 (EP,KR,US);
H01B11/1834 (KR);
H01B13/0036 (US);
H01B13/22 (US);
H01B13/264 (EP,US);
H01B7/14 (US);
|
Former IPC [2019/06] | H01B7/282, H01B13/26, H01B7/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/37] |
Former [2019/06] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DYNAMISCHES STROMKABEL | [2019/06] | English: | A DYNAMIC POWER CABLE | [2019/06] | French: | CÂBLE DE PUISSANCE DYNAMIQUE | [2021/08] |
Former [2019/06] | CÂ?BLE DE PUISSANCE DYNAMIQUE | Examination procedure | 18.07.2019 | Amendment by applicant (claims and/or description) | 06.08.2019 | Examination requested [2019/37] | 06.08.2019 | Date on which the examining division has become responsible | 22.10.2019 | Observations by third parties | 12.03.2020 | Despatch of a communication from the examining division (Time limit: M06) | 22.09.2020 | Reply to a communication from the examining division | 11.01.2021 | Observations by third parties | 25.01.2021 | Communication of intention to grant the patent | 25.05.2021 | Fee for grant paid | 25.05.2021 | Fee for publishing/printing paid | 25.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 07.07.2022 | No opposition filed within time limit [2022/37] | Fees paid | Renewal fee | 26.08.2019 | Renewal fee patent year 03 | 20.08.2020 | Renewal fee patent year 04 | 24.08.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.08.2017 | AL | 06.10.2021 | AT | 06.10.2021 | CY | 06.10.2021 | CZ | 06.10.2021 | EE | 06.10.2021 | ES | 06.10.2021 | FI | 06.10.2021 | HR | 06.10.2021 | LT | 06.10.2021 | LV | 06.10.2021 | MC | 06.10.2021 | MK | 06.10.2021 | NL | 06.10.2021 | PL | 06.10.2021 | RO | 06.10.2021 | RS | 06.10.2021 | SE | 06.10.2021 | SI | 06.10.2021 | SK | 06.10.2021 | SM | 06.10.2021 | BG | 06.01.2022 | GR | 07.01.2022 | IS | 06.02.2022 | PT | 07.02.2022 | [2024/22] |
Former [2024/20] | HU | 02.08.2017 | |
AL | 06.10.2021 | ||
AT | 06.10.2021 | ||
CY | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2024/18] | HU | 02.08.2017 | |
AL | 06.10.2021 | ||
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2023/16] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2023/01] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/49] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/35] | AT | 06.10.2021 | |
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/34] | AT | 06.10.2021 | |
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/33] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/24] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/23] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
PT | 07.02.2022 | ||
Former [2022/22] | AT | 06.10.2021 | |
FI | 06.10.2021 | ||
LT | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/21] | AT | 06.10.2021 | |
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/19] | BG | 06.01.2022 | Documents cited: | Search | [Y]US2011048765 (EGGERTSEN FREDRIK [SE], et al) [Y] 1-15 * paragraph [0061] - paragraph [0062] * * paragraph [0060] * * claim 1 *; | [YD]EP2706539 (BPP CABLES LTD [GB]) [YD] 1-15 * Embodiment 79;; example 2 * * claim 2 * * paragraph [0048] *; | [A]WO2014206474 (PRYSMIAN SPA [IT]) [A] 1-15 * claim 1 *; | [A]US2017207003 (SAUGRAIN JEAN-MAXIME [FR], et al) [A] 1-15* claim 1 * | Examination | - Chakravarthy ET AL, "Study of welding parameters on mechanical and corrosion properties of cupro nickel alloys Cu Ni", (20130218), URL: http://hdl.handle.net/10603/14124, (20200227), XP055672075 | - P. Ferro ET AL, "Laser welding of copper-nickel alloys: a numerical and experimental analysis", SCIENCE AND TECHNOLOGY OF WELDING AND JOINING, GB, (20050601), vol. 10, no. 3, doi:10.1179/174329305X40615, ISSN 1362-1718, pages 299 - 310, XP055672077 DOI: http://dx.doi.org/10.1179/174329305X40615 | by applicant | EP2706539 |