EP3460760 - GENERATING A 2D DRAWING REPRESENTING A MECHANICAL PART [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 16.04.2021 | ||
Former | Grant of patent is intended Status updated on 14.12.2020 | ||
Former | Request for examination was made Status updated on 04.10.2019 | ||
Former | The application has been published Status updated on 22.02.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Dassault Systèmes 10, rue Marcel Dassault 78140 Vélizy-Villacoublay / FR | [2019/13] | Inventor(s) | 01 /
Rorato, Rémy Dassault Systèmes 10 Rue Marcel Dassault 78140 Velizy Villacoublay / FR | [2021/20] |
Former [2019/13] | 01 /
Rorato, Rémy Dassault Systèmes 10 Rue Marcel Dassault 78140 VELIZY VILLACOUBLAY / FR | Representative(s) | Bandpay & Greuter 11 rue Christophe Colomb 75008 Paris / FR | [N/P] |
Former [2019/13] | Bandpay & Greuter 30, rue Notre-Dame des Victoires 75002 Paris / FR | Application number, filing date | 17306268.8 | 26.09.2017 | [2019/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3460760 | Date: | 27.03.2019 | Language: | EN | [2019/13] | Type: | B1 Patent specification | No.: | EP3460760 | Date: | 19.05.2021 | Language: | EN | [2021/20] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.01.2018 | Classification | IPC: | G06T15/20, G06T17/10, G06T17/30 | [2019/13] | CPC: |
G06T15/20 (EP,US);
G06F30/17 (CN);
G06T15/10 (US);
G06T17/10 (EP,US);
G06T17/30 (EP,US);
G06T3/06 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/45] |
Former [2019/13] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ERZEUGUNG EINER 2D-ZEICHNUNG, DIE EIN MECHANISCHES TEIL DARSTELLT | [2019/13] | English: | GENERATING A 2D DRAWING REPRESENTING A MECHANICAL PART | [2019/13] | French: | GÉNÉRATION D'UN DESSIN 2D REPRÉSENTANT UNE PIÈCE MÉCANIQUE | [2019/13] | Examination procedure | 27.09.2019 | Amendment by applicant (claims and/or description) | 27.09.2019 | Examination requested [2019/45] | 27.09.2019 | Date on which the examining division has become responsible | 15.12.2020 | Communication of intention to grant the patent | 13.04.2021 | Fee for grant paid | 13.04.2021 | Fee for publishing/printing paid | 13.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] | Fees paid | Renewal fee | 30.09.2019 | Renewal fee patent year 03 | 30.09.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.09.2017 | AL | 19.05.2021 | AT | 19.05.2021 | CY | 19.05.2021 | CZ | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | ES | 19.05.2021 | FI | 19.05.2021 | HR | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | MT | 19.05.2021 | NL | 19.05.2021 | PL | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SI | 19.05.2021 | SK | 19.05.2021 | SM | 19.05.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | IS | 19.09.2021 | PT | 20.09.2021 | IE | 26.09.2021 | LU | 26.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/42] |
Former [2024/22] | HU | 26.09.2017 | |
AL | 19.05.2021 | ||
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
MK | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/33] | HU | 26.09.2017 | |
AL | 19.05.2021 | ||
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
IE | 26.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
LU | 26.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/29] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/25] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/23] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/10] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/08] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/07] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/04] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
NL | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/52] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/51] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/50] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
Former [2021/49] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
Former [2021/47] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
LT | 19.05.2021 | ||
BG | 19.08.2021 | ||
Former [2021/46] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
LT | 19.05.2021 | Documents cited: | Search | [A]EP2750107 (DASSAULT SYSTÈMES [FR]) [A] 1-15* abstract *; | [XAI] - Catia Tricks, "Surface Area of a Projection", (20170717), pages 1 - 8, URL: https://catiatricks.com/surface-area-of-a-projection/, (20180105), XP002777042 [X] 1,2,13-15 * page 4 * [A] 4-11 [I] 3,12 |