blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3462144

EP3462144 - LIQUID GAS LEVEL MEASURING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.06.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  17.07.2020
FormerGrant of patent is intended
Status updated on  18.06.2020
FormerRequest for examination was made
Status updated on  04.10.2019
FormerThe application has been published
Status updated on  01.03.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Aiut Sp. z o.o.
Ul. Wyczolkowskiego 113
44-109 Gliwice / PL
[2019/14]
Inventor(s)01 / Gabrys, Marek
ul. Wyczolkowskiego 113
44-109 Gliwice / PL
 [2019/14]
Representative(s)AOMB Polska Sp. z.o.o.
ul. Rondo Ignacego Daszynskiego 1
00-843 Warsaw / PL
[N/P]
Former [2019/14]AOMB Polska Sp. z.o.o.
Ul. Emilii Plater 53
21st Floor
00-113 Warsaw / PL
Application number, filing date17461616.929.09.2017
[2019/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3462144
Date:03.04.2019
Language:EN
[2019/14]
Type: B1 Patent specification 
No.:EP3462144
Date:19.08.2020
Language:EN
[2020/34]
Search report(s)(Supplementary) European search report - dispatched on:EP05.04.2018
ClassificationIPC:G01F23/38
[2019/14]
CPC:
G01F23/38 (EP,CN,US); G01F23/806 (BR); F17C13/028 (US);
F17C2221/035 (US); F17C2250/0413 (US); F17C2250/0426 (US);
H04W88/02 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/45]
Former [2019/14]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:FLÜSSIGGASFÜLLSTANDSMESSSYSTEM[2019/14]
English:LIQUID GAS LEVEL MEASURING SYSTEM[2019/14]
French:SYSTÈME DE MESURE DE NIVEAU DE GAZ LIQUIDE[2019/14]
Examination procedure02.10.2019Amendment by applicant (claims and/or description)
02.10.2019Examination requested  [2019/45]
02.10.2019Date on which the examining division has become responsible
19.06.2020Communication of intention to grant the patent
01.07.2020Fee for grant paid
01.07.2020Fee for publishing/printing paid
08.07.2020Receipt of the translation of the claim(s)
Opposition(s)20.05.2021No opposition filed within time limit [2021/30]
Fees paidRenewal fee
30.09.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.09.2017
AL19.08.2020
AT19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
MK19.08.2020
MT19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
LU29.09.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
[2022/33]
Former [2022/28]HU29.09.2017
AL19.08.2020
AT19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
MT19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
LU29.09.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/36]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
LU29.09.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/28]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SK19.08.2020
SM19.08.2020
LU29.09.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/27]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
RO19.08.2020
RS19.08.2020
SM19.08.2020
LU29.09.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/25]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RO19.08.2020
RS19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/23]AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RO19.08.2020
RS19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/22]CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RO19.08.2020
RS19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/21]DK19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RS19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/10]FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
RS19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/09]FI19.08.2020
LT19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
PT21.12.2020
Former [2021/08]FI19.08.2020
LT19.08.2020
BG19.11.2020
NO19.11.2020
PT21.12.2020
Former [2021/07]FI19.08.2020
LT19.08.2020
NO19.11.2020
Documents cited:Search[A]EP0292060  (PIROVANO ANGELO) [A] 5-7 * column 3, line 29 - column 4, line 7; figures 2A-2C *;
 [A]EP1041370  (AREAGAS S R L [IT]) [A] 1 * abstract *;
 [YA]JP2002071429  (YAZAKI CORP) [Y] 2 * abstract * * paragraphs [0019] - [0021]; figure 1 * [A] 5-7;
 [AD]US6679116  (ROSS JR HERBERT G [US]) [AD] 1-10 * column 2, lines 2-25 * * column 3, line 39 - column 4, line 51 ** column 5, line 38 - column 7, line 45; figures 2, 4, 6a-6c, 7 *;
 [XDYI]US2006243345  (LEASE BENJAMIN N [US]) [XD] 1,3,4,8 * paragraphs [0023] - [0028]; figures 1, 2 * [Y] 2 [I] 5-7,9,10;
 [A]WO2017029562  (GABAY VILLAFAÑA PEDRO [MX], et al) [A] 1 * abstract *;
    [ ] - Anonymous, "Rochester Remote Ready Dial & Hall Effect Module", (20150310), URL: http://www.rochestergauges.com/pdfs/R3D.pdf, (20180320), XP055461134 [ ] * the whole document *
 [A]  - Anonymous, "IMR LPG Tank Monitoring- ALEVEL 275 Smart Tank Level Sensor - Aiut", (20170221), URL: http://smartgasmetering.eu/doc/Alevel275_EN_20170221.pdf, (20180320), XP055461121 [A] 1,5-7 * the whole document *
by applicantUS6564632
 US6679116
 US2004079152
 US2004129075
 US2006243345
 US2009160674
 US2009243863
 US8294457
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.