EP3414082 - METHOD FOR PRODUCING A STRUCTURAL ELEMENT CONSISTING OF A FIBRE-COMPOSITE HOLLOW PROFILE AND LOAD-INTRODUCING ELEMENT, AND STRUCTURAL ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.05.2022 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 11.06.2021 | ||
Former | Grant of patent is intended Status updated on 07.04.2021 | ||
Former | Request for examination was made Status updated on 16.11.2018 | ||
Former | The international publication has been made Status updated on 18.08.2017 | ||
Former | unknown Status updated on 01.02.2017 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Leichtbau-Zentrum Sachsen GmbH Marschnerstrasse 39 01307 Dresden / DE | [2018/51] | Inventor(s) | 01 /
LENZ, Florian Weintraubenstraße 4 01099 Dresden / DE | 02 /
WITSCHEL, Bernhard Glasewaldtstraße 40 01277 Dresden / DE | 03 /
LEPPER, Martin Kipsdorfer Straße 149 01279 Dresden / DE | [2018/51] | Representative(s) | Kailuweit & Uhlemann Patentanwälte Partnerschaft mbB Bamberger Straße 49 01187 Dresden / DE | [2018/51] | Application number, filing date | 17701125.1 | 23.01.2017 | [2018/51] | WO2017EP51326 | Priority number, date | DE201610202012 | 10.02.2016 Original published format: DE102016202012 | [2018/51] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017137242 | Date: | 17.08.2017 | Language: | DE | [2017/33] | Type: | A1 Application with search report | No.: | EP3414082 | Date: | 19.12.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.08.2017 takes the place of the publication of the European patent application. | [2018/51] | Type: | B1 Patent specification | No.: | EP3414082 | Date: | 14.07.2021 | Language: | DE | [2021/28] | Search report(s) | International search report - published on: | EP | 17.08.2017 | Classification | IPC: | B29C70/86, B29C70/52 | [2018/51] | CPC: |
B29C70/52 (EP,US);
B29C70/545 (US);
B29C70/86 (EP,US);
B29C53/56 (US);
B29C53/824 (US);
B29K2101/10 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES STRUKTURELEMENTS AUS FASERVERBUND-HOHLPROFIL UND LASTEINLEITUNGSELEMENT, SOWIE STRUKTURELEMENT | [2018/51] | English: | METHOD FOR PRODUCING A STRUCTURAL ELEMENT CONSISTING OF A FIBRE-COMPOSITE HOLLOW PROFILE AND LOAD-INTRODUCING ELEMENT, AND STRUCTURAL ELEMENT | [2018/51] | French: | PROCÉDÉ DE FABRICATION D'UN ÉLÉMENT STRUCTURAL À PARTIR D'UN PROFILÉ CREUX EN COMPOSITE DE FIBRES ET D'UN ÉLÉMENT DE TRANSFERT DE CHARGE AINSI QU'ÉLÉMENT STRUCTURAL | [2018/51] | Entry into regional phase | 05.09.2018 | National basic fee paid | 05.09.2018 | Designation fee(s) paid | 05.09.2018 | Examination fee paid | Examination procedure | 05.09.2018 | Examination requested [2018/51] | 05.09.2018 | Date on which the examining division has become responsible | 08.03.2019 | Amendment by applicant (claims and/or description) | 08.04.2021 | Communication of intention to grant the patent | 04.06.2021 | Fee for grant paid | 04.06.2021 | Fee for publishing/printing paid | 04.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 19.04.2022 | No opposition filed within time limit [2022/25] | Fees paid | Renewal fee | 25.01.2019 | Renewal fee patent year 03 | 27.01.2020 | Renewal fee patent year 04 | 25.11.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.01.2017 | AL | 14.07.2021 | CY | 14.07.2021 | CZ | 14.07.2021 | DK | 14.07.2021 | EE | 14.07.2021 | ES | 14.07.2021 | FI | 14.07.2021 | HR | 14.07.2021 | IT | 14.07.2021 | LT | 14.07.2021 | LV | 14.07.2021 | MC | 14.07.2021 | MK | 14.07.2021 | MT | 14.07.2021 | NL | 14.07.2021 | PL | 14.07.2021 | RO | 14.07.2021 | RS | 14.07.2021 | SE | 14.07.2021 | SI | 14.07.2021 | SK | 14.07.2021 | SM | 14.07.2021 | TR | 14.07.2021 | BG | 14.10.2021 | NO | 14.10.2021 | GR | 15.10.2021 | IS | 14.11.2021 | PT | 15.11.2021 | AT | 23.01.2022 | GB | 23.01.2022 | IE | 23.01.2022 | LU | 23.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | LI | 31.01.2022 | [2024/44] |
Former [2024/29] | HU | 23.01.2017 | |
AL | 14.07.2021 | ||
CY | 14.07.2021 | ||
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
MK | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
TR | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 23.01.2022 | ||
GB | 23.01.2022 | ||
IE | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/22] | HU | 23.01.2017 | |
AL | 14.07.2021 | ||
CY | 14.07.2021 | ||
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
MK | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 23.01.2022 | ||
GB | 23.01.2022 | ||
IE | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/20] | HU | 23.01.2017 | |
AL | 14.07.2021 | ||
CY | 14.07.2021 | ||
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 23.01.2022 | ||
GB | 23.01.2022 | ||
IE | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/18] | HU | 23.01.2017 | |
AL | 14.07.2021 | ||
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 23.01.2022 | ||
GB | 23.01.2022 | ||
IE | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/22] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
AT | 23.01.2022 | ||
GB | 23.01.2022 | ||
IE | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/09] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
GB | 23.01.2022 | ||
IE | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/03] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
GB | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/01] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
GB | 23.01.2022 | ||
LU | 23.01.2022 | ||
BE | 31.01.2022 | ||
Former [2022/47] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
GB | 23.01.2022 | ||
LU | 23.01.2022 | ||
Former [2022/46] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
LU | 23.01.2022 | ||
Former [2022/39] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
MC | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/36] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
IT | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/29] | AL | 14.07.2021 | |
CZ | 14.07.2021 | ||
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SI | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/25] | CZ | 14.07.2021 | |
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SK | 14.07.2021 | ||
SM | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/24] | CZ | 14.07.2021 | |
DK | 14.07.2021 | ||
EE | 14.07.2021 | ||
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RO | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
SK | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/21] | DK | 14.07.2021 | |
ES | 14.07.2021 | ||
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/11] | ES | 14.07.2021 | |
FI | 14.07.2021 | ||
HR | 14.07.2021 | ||
LT | 14.07.2021 | ||
LV | 14.07.2021 | ||
NL | 14.07.2021 | ||
PL | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
GR | 15.10.2021 | ||
IS | 14.11.2021 | ||
PT | 15.11.2021 | ||
Former [2022/09] | ES | 14.07.2021 | |
FI | 14.07.2021 | ||
LT | 14.07.2021 | ||
NL | 14.07.2021 | ||
RS | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
PT | 15.11.2021 | ||
Former [2022/08] | ES | 14.07.2021 | |
FI | 14.07.2021 | ||
LT | 14.07.2021 | ||
NL | 14.07.2021 | ||
SE | 14.07.2021 | ||
BG | 14.10.2021 | ||
NO | 14.10.2021 | ||
Former [2022/07] | LT | 14.07.2021 | |
NL | 14.07.2021 | ||
NO | 14.10.2021 | Cited in | International search | [XA]US2015013819 (STEWART SAMUEL RAY [US]) [X] 19-21 * paragraph [0041]; claim 28 * [A] 1-18 | by applicant | DE102006039565 | DE102004021144 | DE10249591 | WO2005105417 | DE102014004158 |