blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3420606

EP3420606 - THIN, HIGH DENSITY NONWOVEN SEPARATORS FOR ENERGY STORAGE DEVICES AND METHOD OF MANUFACTURING THEREOF [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.10.2020
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  01.11.2019
FormerGrant of patent is intended
Status updated on  26.06.2019
FormerRequest for examination was made
Status updated on  30.11.2018
FormerThe international publication has been made
Status updated on  01.09.2017
Formerunknown
Status updated on  08.02.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Glatfelter Gernsbach GmbH
Hoerdener Str. 5
76593 Gernsbach / DE
For all designated states
Dreamweaver International, Inc.
18 Brozzini Court, Suite B
Greenville, SC 29615 / US
[2019/49]
Former [2019/01]For all designated states
Glatfelter Gernsbach GmbH
Hoerdener Str. 5
76593 Gernsbach / DE
For all designated states
Dreamweaver International, Inc.
2 Parkway Commons Way
Greer, SC 29650 / US
Inventor(s)01 / MATTIA, Testa
BP 2
29390 Scaer / FR
02 / SCHNELLE, Giovanni
Rhonstrasse 13
63667 Nidda / DE
03 / MORIN, Brian G.
Rhonstrasse 13
63667 Nidda / US
 [2019/01]
Representative(s)Tomkinson, Alexandra
Bailey Walsh & Co LLP
1 York Place
Leeds, LS1 2DR / GB
[2019/01]
Application number, filing date17702186.209.01.2017
[2019/01]
WO2017US12719
Priority number, dateUS20161505412025.02.2016         Original published format: US201615054120
US20161505412325.02.2016         Original published format: US201615054123
[2019/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017146825
Date:31.08.2017
Language:EN
[2017/35]
Type: A1 Application with search report 
No.:EP3420606
Date:02.01.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 31.08.2017 takes the place of the publication of the European patent application.
[2019/01]
Type: B1 Patent specification 
No.:EP3420606
Date:04.12.2019
Language:EN
[2019/49]
Search report(s)International search report - published on:EP31.08.2017
ClassificationIPC:H01M2/14, H01M2/16
[2019/01]
CPC:
H01M50/44 (EP,KR); H01M50/42 (EP,KR,US); H01M50/403 (EP,US);
H01M50/406 (EP,KR,US); H01M50/491 (EP,KR,US); H01M50/494 (EP,KR,US);
Y02E60/10 (EP,KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/01]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:DÜNNE, HOCHDICHTE SEPARATOREN AUS VLIESSTOFF FÜR ENERGIESPEICHERVORRICHTUNGEN UND VERFAHREN ZUR HERSTELLUNG DAVON[2019/01]
English:THIN, HIGH DENSITY NONWOVEN SEPARATORS FOR ENERGY STORAGE DEVICES AND METHOD OF MANUFACTURING THEREOF[2019/01]
French:SÉPARATEURS NON TISSÉS MINCES HAUTE DENSITÉ POUR DES DISPOSITIFS DE STOCKAGE D'ÉNERGIE ET LEUR PROCÉDÉ DE FABRICATION[2019/01]
Entry into regional phase19.09.2018National basic fee paid 
19.09.2018Designation fee(s) paid 
19.09.2018Examination fee paid 
Examination procedure22.12.2017Request for preliminary examination filed
International Preliminary Examining Authority: US
19.09.2018Examination requested  [2019/01]
19.09.2018Date on which the examining division has become responsible
03.04.2019Amendment by applicant (claims and/or description)
27.06.2019Communication of intention to grant the patent
03.10.2019Fee for grant paid
03.10.2019Fee for publishing/printing paid
03.10.2019Receipt of the translation of the claim(s)
Opposition(s)07.09.2020No opposition filed within time limit [2020/46]
Fees paidRenewal fee
12.11.2018Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.01.2017
AL04.12.2019
AT04.12.2019
CY04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
IT04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
MK04.12.2019
MT04.12.2019
NL04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
TR04.12.2019
IE09.01.2020
LU09.01.2020
BE31.01.2020
CH31.01.2020
LI31.01.2020
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
[2022/33]
Former [2022/27]HU09.01.2017
AL04.12.2019
AT04.12.2019
CY04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
IT04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
MT04.12.2019
NL04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
TR04.12.2019
IE09.01.2020
LU09.01.2020
BE31.01.2020
CH31.01.2020
LI31.01.2020
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2021/10]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
IT04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
NL04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
IE09.01.2020
LU09.01.2020
BE31.01.2020
CH31.01.2020
LI31.01.2020
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2021/08]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
NL04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
IE09.01.2020
LU09.01.2020
BE31.01.2020
CH31.01.2020
LI31.01.2020
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/51]AL04.12.2019
AT04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
NL04.12.2019
PL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SI04.12.2019
SK04.12.2019
SM04.12.2019
LU09.01.2020
BE31.01.2020
CH31.01.2020
LI31.01.2020
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/47]AL04.12.2019
CZ04.12.2019
DK04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
NL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
LU09.01.2020
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/46]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
NL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
LU09.01.2020
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/45]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
MC04.12.2019
NL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/40]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
NL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
IS04.04.2020
PT29.04.2020
Former [2020/37]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
NL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
SK04.12.2019
SM04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
PT29.04.2020
Former [2020/36]AL04.12.2019
CZ04.12.2019
EE04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
NL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
PT29.04.2020
Former [2020/35]AL04.12.2019
CZ04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
NL04.12.2019
RO04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/34]AL04.12.2019
ES04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
NL04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/32]AL04.12.2019
FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
NL04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/26]FI04.12.2019
HR04.12.2019
LT04.12.2019
LV04.12.2019
RS04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/23]FI04.12.2019
LT04.12.2019
LV04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
GR05.03.2020
Former [2020/22]FI04.12.2019
LT04.12.2019
SE04.12.2019
BG04.03.2020
NO04.03.2020
Former [2020/21]NO04.03.2020
Cited inInternational search[A]US2012295165  (MORIN BRIAN G [US], et al) [A] 1-13* paragraphs [0042] , [0 43] *;
 [A]US2014162110  (CHEN WAN-SHU [TW], et al) [A] 1-13 * paragraphs [0055] - [0056]; table 1 *;
 [XI]DE112012004667T  (TOPTEC HNS CO [KR]) [X] 1-7 * paragraphs [0031] - [0045] - [0 63] * [I] 8-13
by applicantUS6110588
 US6432347
 US6432532
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.