EP3423295 - WHEEL UNIT, SYSTEM FOR TRANSMITTING DATA FROM A WHEEL UNIT, AND METHOD FOR TRANSMITTING DATA FROM A WHEEL UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 22.05.2020 | ||
Former | Grant of patent is intended Status updated on 19.01.2020 | ||
Former | Request for examination was made Status updated on 07.12.2018 | ||
Former | The international publication has been made Status updated on 08.09.2017 | ||
Former | unknown Status updated on 14.02.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Continental Automotive GmbH Vahrenwalder Straße 9 30165 Hannover / DE | [2020/35] |
Former [2019/02] | For all designated states Continental Automotive GmbH Vahrenwalder Strasse 9 30165 Hannover / DE | Inventor(s) | 01 /
LÖFFLER, Michael Käthe Dorschweg 31 93055 Regensburg / DE | 02 /
GODET, Sylvain 191 Chemin du Pipé 31330 Saint-Cezert / FR | 03 /
DUFOUR, Stephane 22 Rue de la Barthe 31780 Castelginest / FR | [2019/02] | Application number, filing date | 17703128.3 | 02.02.2017 | [2019/02] | WO2017EP52300 | Priority number, date | GB20160003738 | 04.03.2016 Original published format: GB 201603738 | [2019/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017148649 | Date: | 08.09.2017 | Language: | EN | [2017/36] | Type: | A1 Application with search report | No.: | EP3423295 | Date: | 09.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.09.2017 takes the place of the publication of the European patent application. | [2019/02] | Type: | B1 Patent specification | No.: | EP3423295 | Date: | 24.06.2020 | Language: | EN | [2020/26] | Search report(s) | International search report - published on: | EP | 08.09.2017 | Classification | IPC: | B60C23/04 | [2019/02] | CPC: |
B60C23/0447 (EP);
B60C23/0464 (GB,US);
B60C23/0454 (GB,US);
B60C23/04 (GB);
B60C23/0455 (EP,GB);
B60C2200/04 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | RADSTEUEREINHEIT, SYSTEM ZUR ÜBERTRAGUNG VON DATEN VOM RAD, DESSEN VERFAHREN ZUR ÜBERTRAGUNG VON DATEN VOM RAD | [2020/08] | English: | WHEEL UNIT, SYSTEM FOR TRANSMITTING DATA FROM A WHEEL UNIT, AND METHOD FOR TRANSMITTING DATA FROM A WHEEL UNIT | [2019/02] | French: | UNITÉ DE COMMANDE D' UNE ROUE, SYSTÈME POUR TRANSMETTRE DES INFORMATIONS LIÉES À LA ROUE ET PROCÉDÉ POUR TRANSMETTRE CES MÊMES INFORMATIONS | [2019/43] |
Former [2019/02] | RADEINHEIT, SYSTEM ZUR ÜBERTRAGUNG VON DATEN VON EINER RADEINHEIT UND VERFAHREN ZUR DATENÜBERTRAGUNG VON EINER RADEINHEIT | ||
Former [2019/02] | UNITÉ DE ROUE, SYSTÈME DE TRANSMISSION DE DONNÉES À PARTIR D'UNE UNITÉ DE ROUE, ET PROCÉDÉ DE TRANSMISSION DE DONNÉES À PARTIR D'UNE UNITÉ DE ROUE | Entry into regional phase | 04.10.2018 | National basic fee paid | 04.10.2018 | Designation fee(s) paid | 04.10.2018 | Examination fee paid | Examination procedure | 04.10.2018 | Examination requested [2019/02] | 04.10.2018 | Date on which the examining division has become responsible | 03.04.2019 | Amendment by applicant (claims and/or description) | 20.01.2020 | Communication of intention to grant the patent | 18.05.2020 | Fee for grant paid | 18.05.2020 | Fee for publishing/printing paid | 18.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] | Fees paid | Renewal fee | 28.02.2019 | Renewal fee patent year 03 | 02.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.02.2017 | AL | 24.06.2020 | AT | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | DK | 24.06.2020 | EE | 24.06.2020 | ES | 24.06.2020 | FI | 24.06.2020 | HR | 24.06.2020 | IT | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | MT | 24.06.2020 | NL | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SE | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | BG | 24.09.2020 | NO | 24.09.2020 | GR | 25.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | GB | 02.02.2021 | IE | 02.02.2021 | LU | 02.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | LI | 28.02.2021 | [2024/42] |
Former [2024/22] | HU | 02.02.2017 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
MK | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 02.02.2021 | ||
IE | 02.02.2021 | ||
LU | 02.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/33] | HU | 02.02.2017 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 02.02.2021 | ||
IE | 02.02.2021 | ||
LU | 02.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2023/30] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 02.02.2021 | ||
IE | 02.02.2021 | ||
LU | 02.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/33] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 02.02.2021 | ||
IE | 02.02.2021 | ||
LU | 02.02.2021 | ||
BE | 28.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/09] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 02.02.2021 | ||
IE | 02.02.2021 | ||
LU | 02.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2022/07] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
IE | 02.02.2021 | ||
LU | 02.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/47] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
LU | 02.02.2021 | ||
CH | 28.02.2021 | ||
LI | 28.02.2021 | ||
Former [2021/41] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/36] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/21] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/10] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/09] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
PT | 26.10.2020 | ||
Former [2021/04] | AL | 24.06.2020 | |
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2021/01] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/51] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/50] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/48] | FI | 24.06.2020 | |
LT | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
Former [2020/47] | LT | 24.06.2020 | |
NO | 24.09.2020 | Cited in | International search | [A]EP1524133 (TAIHEIYO KOGYO KK [JP]) [A] 1-10 * abstract * * paragraph [0035]; figures 1-3 *; | [A]WO2010007475 (FREESCALE SEMICONDUCTOR INC [US], et al) [A] 1-10 * abstract *; | [A]WO2015015692 (DENSO CORP [JP]) [A] 1-10* abstract * |