blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3574167

EP3574167 - SEALING A LEAD-THROUGH OF A ANCHOR ROD THROUGH A PANEL FORMWORK ELEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.08.2024
Database last updated on 31.08.2024
FormerThe patent has been granted
Status updated on  15.09.2023
FormerGrant of patent is intended
Status updated on  24.05.2023
FormerExamination is in progress
Status updated on  27.05.2022
FormerRequest for examination was made
Status updated on  01.11.2019
FormerThe international publication has been made
Status updated on  04.08.2018
Formerunknown
Status updated on  25.02.2017
Most recent event   Tooltip22.08.2024No opposition filed within time limitpublished on 25.09.2024 [2024/39]
Applicant(s)For all designated states
MEVA Schalungs-Systeme GmbH
Industriestr. 5
72221 Haiterbach / DE
[2023/42]
Former [2019/49]For all designated states
MEVA Schalungs-Systeme GmbH
Industriestr. 5
72221 Haiterbach / DE
Inventor(s)01 / DINGLER, Gerhard
Uhlandstr. 19
72221 Haiterbach / DE
02 / SCHRAMM, Uwe
Oberdorfstr. 22
72160 Horb-Mühringen / DE
03 / SCHILLE, Rick
Marktstr. 6
72224 Ebhausen / DE
 [2019/49]
Representative(s)Witte, Weller & Partner Patentanwälte mbB
Postfach 10 54 62
70047 Stuttgart / DE
[2023/42]
Former [2019/49]Späth, Dieter
ABACUS
Patentanwälte
Lise-Meitner-Strasse 21
72202 Nagold / DE
Application number, filing date17705300.627.01.2017
[2019/49]
WO2017DE100056
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018137728
Date:02.08.2018
Language:DE
[2018/31]
Type: A1 Application with search report 
No.:EP3574167
Date:04.12.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 02.08.2018 takes the place of the publication of the European patent application.
[2019/49]
Type: B1 Patent specification 
No.:EP3574167
Date:18.10.2023
Language:DE
[2023/42]
Search report(s)International search report - published on:EP02.08.2018
ClassificationIPC:E04G17/06, F16B19/02, E04G17/065, F16B33/00, F16B39/02, F16B43/02
[2023/24]
CPC:
E04G17/0652 (EP,US); E04G17/0644 (EP,US); E04G17/0655 (US);
E04G17/0752 (US); F16B33/004 (EP); F16J15/104 (US);
F16B19/02 (EP); F16B39/026 (EP); F16B43/02 (EP);
F16L5/10 (US) (-)
Former IPC [2019/49]E04G17/06, F16B13/00, E04G17/065, F16J15/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/49]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ABDICHTUNG EINER DURCHFÜHRUNG EINES ANKERSTABS DURCH EIN RAHMENSCHALELEMENT[2019/49]
English:SEALING A LEAD-THROUGH OF A ANCHOR ROD THROUGH A PANEL FORMWORK ELEMENT[2019/49]
French:SYSTÈME D'ÉTANCHÉITÉ D'UN PASSAGE D'UNE TIGE D'ANCRAGE À TRAVERS UN ÉLÉMENT DE COFFRAGE CADRE[2019/49]
Entry into regional phase05.06.2019National basic fee paid 
05.06.2019Designation fee(s) paid 
05.06.2019Examination fee paid 
Examination procedure05.06.2019Amendment by applicant (claims and/or description)
05.06.2019Examination requested  [2019/49]
05.06.2019Date on which the examining division has become responsible
27.05.2022Despatch of a communication from the examining division (Time limit: M04)
19.09.2022Reply to a communication from the examining division
23.12.2022Despatch of a communication from the examining division (Time limit: M04)
25.04.2023Reply to a communication from the examining division
25.05.2023Communication of intention to grant the patent
06.09.2023Fee for grant paid
06.09.2023Fee for publishing/printing paid
06.09.2023Receipt of the translation of the claim(s)
Opposition(s)19.07.2024No opposition filed within time limit [2024/39]
Fees paidRenewal fee
17.09.2019Renewal fee patent year 03
06.11.2019Renewal fee patent year 04
03.11.2020Renewal fee patent year 05
05.11.2021Renewal fee patent year 06
08.11.2022Renewal fee patent year 07
Penalty fee
Additional fee for renewal fee
27.08.201903   M06   Fee paid on   17.09.2019
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ18.10.2023
DK18.10.2023
EE18.10.2023
ES18.10.2023
HR18.10.2023
IT18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RO18.10.2023
RS18.10.2023
SE18.10.2023
SK18.10.2023
SM18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
[2024/36]
Former [2024/35]CZ18.10.2023
DK18.10.2023
EE18.10.2023
ES18.10.2023
HR18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RO18.10.2023
RS18.10.2023
SE18.10.2023
SM18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/34]DK18.10.2023
EE18.10.2023
ES18.10.2023
HR18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RS18.10.2023
SE18.10.2023
SM18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/33]DK18.10.2023
ES18.10.2023
HR18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RS18.10.2023
SE18.10.2023
SM18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/26]ES18.10.2023
HR18.10.2023
LT18.10.2023
LV18.10.2023
NL18.10.2023
PL18.10.2023
RS18.10.2023
SE18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/25]ES18.10.2023
HR18.10.2023
LT18.10.2023
NL18.10.2023
PL18.10.2023
RS18.10.2023
SE18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/24]ES18.10.2023
HR18.10.2023
LT18.10.2023
NL18.10.2023
RS18.10.2023
SE18.10.2023
BG18.01.2024
NO18.01.2024
GR19.01.2024
IS18.02.2024
PT19.02.2024
Former [2024/21]LT18.10.2023
NL18.10.2023
BG18.01.2024
GR19.01.2024
IS18.02.2024
Former [2024/20]NL18.10.2023
GR19.01.2024
IS18.02.2024
Former [2024/17]NL18.10.2023
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.