EP3423722 - METHOD FOR PRODUCING AN EXPANSION ANCHOR BY REDUCING THE DIAMETER OF A SLEEVE BLANK [Right-click to bookmark this link] | |||
Former [2019/02] | METHOD FOR PRODUCING AN EXPANSION ANCHOR BY MEANS OF DIAMETER REDUCTION OF A SLEEVE BLANK, AND EXPANSION ANCHOR | ||
[2019/28] | Status | No opposition filed within time limit Status updated on 24.07.2020 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 16.08.2019 | ||
Former | Grant of patent is intended Status updated on 11.07.2019 | ||
Former | Request for examination was made Status updated on 07.12.2018 | ||
Former | The international publication has been made Status updated on 08.09.2017 | ||
Former | unknown Status updated on 03.03.2017 | Most recent event Tooltip | 08.09.2023 | Lapse of the patent in a contracting state New state(s): SI | published on 11.10.2023 [2023/41] | Applicant(s) | For all designated states Hilti Aktiengesellschaft Feldkircherstrasse 100 9494 Schaan / LI | [2019/02] | Inventor(s) | 01 /
DOMANI, Guenter Kirchstr. 28E 88138 Weissensberg / DE | 02 /
SHIMAHARA, Hideki Birkenaustr. 8 9470 Buchs / CH | 03 /
HAEUSSLER, Karl Mittellunden 311 7222 Lunden / CH | [2019/02] | Representative(s) | Hilti Aktiengesellschaft Corporate Intellectual Property Feldkircherstrasse 100 Postfach 333 9494 Schaan / LI | [2019/02] | Application number, filing date | 17706454.0 | 21.02.2017 | [2019/02] | WO2017EP53847 | Priority number, date | EP20160157975 | 01.03.2016 Original published format: EP 16157975 | [2019/02] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017148731 | Date: | 08.09.2017 | Language: | DE | [2017/36] | Type: | A1 Application with search report | No.: | EP3423722 | Date: | 09.01.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 08.09.2017 takes the place of the publication of the European patent application. | [2019/02] | Type: | B1 Patent specification | No.: | EP3423722 | Date: | 18.09.2019 | Language: | DE | [2019/38] | Search report(s) | International search report - published on: | EP | 08.09.2017 | Classification | IPC: | F16B13/06 | [2019/02] | CPC: |
F16B13/065 (EP,US);
B21D53/00 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUM HERSTELLEN EINES SPREIZANKERS MITTELS DURCHMESSER-REDUZIERENS EINES HÜLSENROHLINGS | [2019/28] | English: | METHOD FOR PRODUCING AN EXPANSION ANCHOR BY REDUCING THE DIAMETER OF A SLEEVE BLANK | [2019/28] | French: | PROCEDE DE FABRICATION D'UNE CHEVILLE EXTENSIBLE PAR REDUCTION DU DIAMETRE D'UNE EBAUCHE DE MANCHON | [2019/28] |
Former [2019/02] | VERFAHREN ZUM HERSTELLEN EINES SPREIZANKERS MITTELS DURCHMESSER-REDUZIERENS EINES HÜLSENROHLINGS SOWIE SPREIZANKER | ||
Former [2019/02] | METHOD FOR PRODUCING AN EXPANSION ANCHOR BY MEANS OF DIAMETER REDUCTION OF A SLEEVE BLANK, AND EXPANSION ANCHOR | ||
Former [2019/02] | PROCÉDÉ DE FABRICATION D'UNE ANCRE EXTENSIBLE PAR RÉDUCTION DE DIAMÈTRE D'UNE ÉBAUCHE DE MANCHON ET ANCRE EXTENSIBLE | Entry into regional phase | 01.10.2018 | National basic fee paid | 01.10.2018 | Designation fee(s) paid | 01.10.2018 | Examination fee paid | Examination procedure | 01.10.2018 | Examination requested [2019/02] | 01.10.2018 | Date on which the examining division has become responsible | 18.10.2018 | Amendment by applicant (claims and/or description) | 12.07.2019 | Communication of intention to grant the patent | 05.08.2019 | Fee for grant paid | 05.08.2019 | Fee for publishing/printing paid | 05.08.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 19.06.2020 | No opposition filed within time limit [2020/35] | Fees paid | Renewal fee | 21.02.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.02.2017 | AL | 18.09.2019 | CY | 18.09.2019 | CZ | 18.09.2019 | DK | 18.09.2019 | EE | 18.09.2019 | FI | 18.09.2019 | HR | 18.09.2019 | LT | 18.09.2019 | LV | 18.09.2019 | MC | 18.09.2019 | MK | 18.09.2019 | MT | 18.09.2019 | NL | 18.09.2019 | PL | 18.09.2019 | RO | 18.09.2019 | RS | 18.09.2019 | SE | 18.09.2019 | SI | 18.09.2019 | SK | 18.09.2019 | SM | 18.09.2019 | TR | 18.09.2019 | BG | 18.12.2019 | NO | 18.12.2019 | GR | 19.12.2019 | IS | 19.01.2020 | PT | 20.01.2020 | IE | 21.02.2020 | LU | 21.02.2020 | [2023/41] |
Former [2022/33] | HU | 21.02.2017 | |
AL | 18.09.2019 | ||
CY | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
MK | 18.09.2019 | ||
MT | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
TR | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
IE | 21.02.2020 | ||
LU | 21.02.2020 | ||
Former [2022/27] | HU | 21.02.2017 | |
AL | 18.09.2019 | ||
CY | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
MT | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
TR | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
IE | 21.02.2020 | ||
LU | 21.02.2020 | ||
Former [2021/08] | AL | 18.09.2019 | |
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
IE | 21.02.2020 | ||
LU | 21.02.2020 | ||
Former [2020/50] | AL | 18.09.2019 | |
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
LU | 21.02.2020 | ||
Former [2020/48] | AL | 18.09.2019 | |
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
LU | 21.02.2020 | ||
Former [2020/36] | AL | 18.09.2019 | |
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
Former [2020/27] | AL | 18.09.2019 | |
CZ | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 18.09.2019 | |
CZ | 18.09.2019 | ||
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 18.09.2019 | |
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
Former [2020/22] | AL | 18.09.2019 | |
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
Former [2020/20] | AL | 18.09.2019 | |
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
Former [2020/15] | AL | 18.09.2019 | |
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
Former [2020/12] | FI | 18.09.2019 | |
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
Former [2020/10] | FI | 18.09.2019 | |
LT | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
Former [2020/09] | FI | 18.09.2019 | |
LT | 18.09.2019 | ||
NO | 18.12.2019 | ||
Former [2020/08] | LT | 18.09.2019 | |
NO | 18.12.2019 | Cited in | International search | [XY]DE3120809 (HILTI AG [LI]) [X] 1-12,14-17 * figure - * [Y] 13,18; | [YD]EP2848825 (HILTI AG [LI]) [YD] 13,18* figure - * | by applicant | JPS51142704U | US4334813 | EP0627567 | EP1561523 | EP2848825 |