EP3424183 - SYSTEM AND METHOD FOR DATAPLANE-SIGNALED PACKET CAPTURE IN IPV6 ENVIRONMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.09.2020 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 11.10.2019 | ||
Former | Grant of patent is intended Status updated on 04.10.2019 | ||
Former | Request for examination was made Status updated on 07.12.2018 | ||
Former | The international publication has been made Status updated on 08.09.2017 | ||
Former | unknown Status updated on 28.03.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Cisco Technology, Inc. 170 W. Tasman Drive San Jose, CA 95134-1706 / US | [2019/02] | Inventor(s) | 01 /
PIGNATARO, Carlos 170 West Tasman Drive San Jose, California 95134-1706 / US | 02 /
FURR, Richard 170 West Tasman Drive San Jose, California 95134-1706 / US | 03 /
NAINAR, Nagendra Kumar 170 West Tasman Drive San Jose, California 95134-1706 / US | 04 /
CLARKE, Joseph Michael 170 West Tasman Drive San Jose, California 95134-1706 / US | [2019/02] | Representative(s) | Kazi, Ilya, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [N/P] |
Former [2019/02] | Kazi, Ilya, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 17711849.4 | 28.02.2017 | [2019/02] | WO2017US19857 | Priority number, date | US201615056483 | 29.02.2016 Original published format: US201615056483 | [2019/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017151565 | Date: | 08.09.2017 | Language: | EN | [2017/36] | Type: | A1 Application with search report | No.: | EP3424183 | Date: | 09.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.09.2017 takes the place of the publication of the European patent application. | [2019/02] | Type: | B1 Patent specification | No.: | EP3424183 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Search report(s) | International search report - published on: | EP | 08.09.2017 | Classification | IPC: | H04L12/741, H04L12/26 | [2019/26] | CPC: |
H04L43/028 (EP,US);
H04L45/74 (US);
H04L43/04 (EP,US);
H04L43/10 (EP,US);
H04L45/566 (EP,US)
|
Former IPC [2019/02] | H04L12/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR DATENEBENEN-SIGNALISIERTEN PAKETERFASSUNG IN EINER IPV6-UMGEBUNG | [2019/02] | English: | SYSTEM AND METHOD FOR DATAPLANE-SIGNALED PACKET CAPTURE IN IPV6 ENVIRONMENT | [2019/02] | French: | SYSTÈME ET PROCÉDÉ PERMETTANT UNE CAPTURE DE PAQUET SIGNALÉ PAR UN PLAN DE DONNÉES DANS UN ENVIRONNEMENT IPV6 | [2019/02] | Entry into regional phase | 09.07.2018 | National basic fee paid | 09.07.2018 | Designation fee(s) paid | 09.07.2018 | Examination fee paid | Examination procedure | 09.07.2018 | Examination requested [2019/02] | 09.07.2018 | Date on which the examining division has become responsible | 20.03.2019 | Amendment by applicant (claims and/or description) | 14.06.2019 | Communication of intention to grant the patent | 02.10.2019 | Fee for grant paid | 02.10.2019 | Fee for publishing/printing paid | 02.10.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP19193192.2 / EP3591901 | Opposition(s) | 14.08.2020 | No opposition filed within time limit [2020/43] | Fees paid | Renewal fee | 27.02.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2017 | AL | 13.11.2019 | AT | 13.11.2019 | CY | 13.11.2019 | CZ | 13.11.2019 | DK | 13.11.2019 | EE | 13.11.2019 | ES | 13.11.2019 | FI | 13.11.2019 | HR | 13.11.2019 | IT | 13.11.2019 | LT | 13.11.2019 | LV | 13.11.2019 | MC | 13.11.2019 | MK | 13.11.2019 | MT | 13.11.2019 | NL | 13.11.2019 | PL | 13.11.2019 | RO | 13.11.2019 | RS | 13.11.2019 | SE | 13.11.2019 | SI | 13.11.2019 | SK | 13.11.2019 | SM | 13.11.2019 | TR | 13.11.2019 | BG | 13.02.2020 | NO | 13.02.2020 | GR | 14.02.2020 | IE | 28.02.2020 | LU | 28.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | IS | 13.03.2020 | PT | 13.03.2020 | [2022/33] |
Former [2022/27] | HU | 28.02.2017 | |
AL | 13.11.2019 | ||
AT | 13.11.2019 | ||
CY | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
IT | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
MT | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
TR | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2021/10] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
IT | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2021/08] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IE | 28.02.2020 | ||
LU | 28.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/51] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
LU | 28.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/50] | AL | 13.11.2019 | |
AT | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
LU | 28.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/48] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
LU | 28.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/37] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/36] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/35] | AL | 13.11.2019 | |
CZ | 13.11.2019 | ||
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RO | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/34] | AL | 13.11.2019 | |
ES | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/32] | AL | 13.11.2019 | |
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/25] | FI | 13.11.2019 | |
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
RS | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/24] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/23] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
PL | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/22] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
SE | 13.11.2019 | ||
BG | 13.02.2020 | ||
NO | 13.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/21] | NO | 13.02.2020 | Cited in | International search | [A]US2014177428 (SINHA ABHISHEK [US], et al) [A] 1-26* paragraph [0032] - paragraph [0034] *; | [A]WO2015165212 (ZHONGXING MICROELECTRONICS TECHNOLOGY CO LTD [CN]) [A] 1-26 * the whole document *; | [E]US2017155592 (CHEN QINSHU [CN]) [E] 1-26 * paragraph [0070] - paragraph [0076] *; | [A] - RAZA CISCO SYSTEMS K ET AL, "IPv6 Router Alert Option for MPLS Operations, Administration, and Maintenance (OAM); rfc7506.txt", IPV6 ROUTER ALERT OPTION FOR MPLS OPERATIONS, ADMINISTRATION, AND MAINTENANCE (OAM); RFC7506.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARD, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20150417), pages 1 - 6, XP015104594 [A] 1-26 * page 3, line 19 - line 35 * |