EP3426082 - ARTICLE OF CLOTHING INCLUDING A SUBSTRATE MATERIAL AND A FLOCKING MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.12.2022 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 31.12.2021 | ||
Former | Grant of patent is intended Status updated on 20.04.2021 | ||
Former | Examination is in progress Status updated on 15.07.2019 | ||
Former | Request for examination was made Status updated on 14.12.2018 | ||
Former | The international publication has been made Status updated on 15.09.2017 | ||
Former | unknown Status updated on 28.03.2017 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states NIKE Innovate C.V. One Bowerman Drive Beaverton, OR 97005-6453 / US | [2020/01] |
Former [2019/03] | For all designated states Hurley Phantom C.V. One Bowerman Drive Beaverton, Oregon 97005 / US | Inventor(s) | 01 /
MOORE, Bruce Y. c/o Hurley International LLC 1945 Placentia Avenue Costa Mesa California 92627 / US | 02 /
TURNER, David c/o Hurley International LLC 1945 Placentia Avenue Costa Mesa California 92627 / US | [2019/03] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2022/05] |
Former [2019/03] | Tombling, Adrian George Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | Application number, filing date | 17711988.0 | 10.03.2017 | [2019/03] | WO2017US21754 | Priority number, date | US201662306319P | 10.03.2016 Original published format: US 201662306319 P | [2019/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017156376 | Date: | 14.09.2017 | Language: | EN | [2017/37] | Type: | A1 Application with search report | No.: | EP3426082 | Date: | 16.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.09.2017 takes the place of the publication of the European patent application. | [2019/03] | Type: | B1 Patent specification | No.: | EP3426082 | Date: | 02.02.2022 | Language: | EN | [2022/05] | Search report(s) | International search report - published on: | EP | 14.09.2017 | Classification | IPC: | A41F9/00, A41D27/10, A41D27/18, // A41D13/00 | [2021/18] | CPC: |
A41D27/10 (EP,CN,US);
A41D13/0015 (EP,CN,US);
A41B1/12 (CN,US);
A41B17/00 (CN,US);
A41D1/06 (CN,US);
A41D1/089 (CN,US);
A41D27/18 (EP,CN,US);
A41D31/02 (CN);
A41F9/00 (EP,CN,US);
|
Former IPC [2019/03] | A41F9/00, A41D27/10, A41D27/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KLEIDUNGSSTÜCK MIT EINEM SUBSTRATMATERIAL UND EINEM FLOCKUNGSMATERIAL | [2019/03] | English: | ARTICLE OF CLOTHING INCLUDING A SUBSTRATE MATERIAL AND A FLOCKING MATERIAL | [2019/03] | French: | ARTICLE D'HABILLEMENT COMPRENANT UN MATÉRIAU DE SUBSTRAT ET UN MATÉRIAU DE FLOCAGE | [2019/03] | Entry into regional phase | 26.09.2018 | National basic fee paid | 26.09.2018 | Designation fee(s) paid | 26.09.2018 | Examination fee paid | Examination procedure | 26.09.2018 | Examination requested [2019/03] | 26.09.2018 | Date on which the examining division has become responsible | 26.04.2019 | Amendment by applicant (claims and/or description) | 18.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 25.11.2019 | Reply to a communication from the examining division | 16.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 26.08.2020 | Reply to a communication from the examining division | 30.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 05.03.2021 | Reply to a communication from the examining division | 08.04.2021 | Observations by third parties | 21.04.2021 | Communication of intention to grant the patent | 24.08.2021 | Receipt of the translation of the claim(s) | 26.08.2021 | Fee for grant paid | 26.08.2021 | Fee for publishing/printing paid | Divisional application(s) | EP21202044.0 / EP3960015 | Opposition(s) | 03.11.2022 | No opposition filed within time limit [2023/02] | Fees paid | Renewal fee | 13.03.2019 | Renewal fee patent year 03 | 12.03.2020 | Renewal fee patent year 04 | 12.03.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.03.2017 | AL | 02.02.2022 | AT | 02.02.2022 | CY | 02.02.2022 | CZ | 02.02.2022 | DK | 02.02.2022 | EE | 02.02.2022 | FI | 02.02.2022 | HR | 02.02.2022 | IT | 02.02.2022 | LT | 02.02.2022 | LV | 02.02.2022 | MC | 02.02.2022 | MK | 02.02.2022 | MT | 02.02.2022 | NL | 02.02.2022 | PL | 02.02.2022 | RO | 02.02.2022 | RS | 02.02.2022 | SE | 02.02.2022 | SI | 02.02.2022 | SK | 02.02.2022 | SM | 02.02.2022 | TR | 02.02.2022 | IE | 10.03.2022 | LU | 10.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | BG | 02.05.2022 | NO | 02.05.2022 | GR | 03.05.2022 | IS | 02.06.2022 | PT | 02.06.2022 | [2024/44] |
Former [2024/29] | HU | 10.03.2017 | |
AL | 02.02.2022 | ||
AT | 02.02.2022 | ||
CY | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
IT | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
MK | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SI | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
TR | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2024/22] | HU | 10.03.2017 | |
AL | 02.02.2022 | ||
AT | 02.02.2022 | ||
CY | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
IT | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
MK | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SI | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2024/20] | HU | 10.03.2017 | |
AL | 02.02.2022 | ||
AT | 02.02.2022 | ||
CY | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
IT | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SI | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2024/18] | HU | 10.03.2017 | |
AL | 02.02.2022 | ||
AT | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
IT | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SI | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2023/35] | AL | 02.02.2022 | |
AT | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
IT | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SI | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2023/10] | AL | 02.02.2022 | |
AT | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SI | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2023/09] | AL | 02.02.2022 | |
AT | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2023/08] | AL | 02.02.2022 | |
AT | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
IE | 10.03.2022 | ||
LU | 10.03.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2023/01] | AL | 02.02.2022 | |
AT | 02.02.2022 | ||
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
MC | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2022/49] | AT | 02.02.2022 | |
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SK | 02.02.2022 | ||
SM | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2022/48] | AT | 02.02.2022 | |
CZ | 02.02.2022 | ||
DK | 02.02.2022 | ||
EE | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SM | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2022/47] | AT | 02.02.2022 | |
DK | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RO | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
SM | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2022/46] | AT | 02.02.2022 | |
DK | 02.02.2022 | ||
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2022/42] | AT | 02.02.2022 | |
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
IS | 02.06.2022 | ||
PT | 02.06.2022 | ||
Former [2022/39] | AT | 02.02.2022 | |
FI | 02.02.2022 | ||
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
PT | 02.06.2022 | ||
Former [2022/36] | AT | 02.02.2022 | |
HR | 02.02.2022 | ||
LT | 02.02.2022 | ||
LV | 02.02.2022 | ||
NL | 02.02.2022 | ||
PL | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
GR | 03.05.2022 | ||
PT | 02.06.2022 | ||
Former [2022/35] | HR | 02.02.2022 | |
LT | 02.02.2022 | ||
NL | 02.02.2022 | ||
RS | 02.02.2022 | ||
SE | 02.02.2022 | ||
BG | 02.05.2022 | ||
NO | 02.05.2022 | ||
PT | 02.06.2022 | ||
Former [2022/34] | LT | 02.02.2022 | |
NL | 02.02.2022 | ||
NO | 02.05.2022 | ||
PT | 02.06.2022 | ||
Former [2022/33] | LT | 02.02.2022 | |
NO | 02.05.2022 | Cited in | International search | [X]JP2001270019 (SHINGII KK); | [XI]US2006080755 (BARON MICHAEL R [US], et al); | [X]WO2012004603 (STRETCHLINE INTELLECTUAL PROPERTIES LTD, et al); | [X]US2014208484 (HUFF SEBASTIAN [US], et al) |