EP3433089 - APPARATUS AND METHOD FOR REPAIRING COMPOSITE LAMINATES [Right-click to bookmark this link] | |||
Former [2019/05] | APPARATUS AND METHODS FOR REPAIRING COMPOSITE LAMINATES | ||
[2021/27] | Status | No opposition filed within time limit Status updated on 28.10.2022 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 19.11.2021 | ||
Former | Grant of patent is intended Status updated on 01.07.2021 | ||
Former | Examination is in progress Status updated on 31.07.2019 | ||
Former | Request for examination was made Status updated on 30.12.2018 | ||
Former | The international publication has been made Status updated on 29.09.2017 | ||
Former | unknown Status updated on 11.04.2017 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Short Brothers Plc Airport Road Belfast BT3 9DZ / GB | For:MT
Learjet Inc. One Learjet Way P.O. Box 7707 Wichita, Kansas 67277-7707 / US | [2019/05] | Inventor(s) | 01 /
HANNA, Samuel Colin 9 Riverside Avenue Bangor Down BT20 4RX / GB | 02 /
CAMPBELL, William Christopher 46A Mount Vernon Park Belfast Antrim BT15 4BG / GB | 03 /
STOESSIGER, Mathew 319 East Liberty Street Savannah, Georgia 31401 / US | 04 /
CROSSTHWAITE, Michael 6/7 Sinclair Street Elsternwick, Victoria 3185 / AU | [2019/05] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [2021/51] |
Former [2019/05] | HGF Limited Delta House 50 West Nile Street Glasgow G1 2NP / GB | Application number, filing date | 17715007.5 | 22.03.2017 | [2019/05] | WO2017US23512 | Priority number, date | US201662313271P | 25.03.2016 Original published format: US 201662313271 P | [2019/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017165475 | Date: | 28.09.2017 | Language: | EN | [2017/39] | Type: | A1 Application with search report | No.: | EP3433089 | Date: | 30.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.09.2017 takes the place of the publication of the European patent application. | [2019/05] | Type: | B1 Patent specification | No.: | EP3433089 | Date: | 22.12.2021 | Language: | EN | [2021/51] | Search report(s) | International search report - published on: | EP | 28.09.2017 | Classification | IPC: | B29C73/02, B29C70/44 | [2019/05] | CPC: |
B29C70/443 (EP,US);
B29C70/549 (EP);
B29C70/745 (US);
B29C73/02 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR REPARATUR VON VERBUNDLAMINATEN | [2019/05] | English: | APPARATUS AND METHOD FOR REPAIRING COMPOSITE LAMINATES | [2021/27] | French: | APPAREIL ET PROCÉDÉ POUR LA RÉPARATION DE STRATIFIÉS COMPOSITES | [2021/27] |
Former [2019/05] | APPARATUS AND METHODS FOR REPAIRING COMPOSITE LAMINATES | ||
Former [2019/05] | APPAREIL ET PROCÉDÉS POUR LA RÉPARATION DE STRATIFIÉS COMPOSITES | Entry into regional phase | 19.10.2018 | National basic fee paid | 19.10.2018 | Designation fee(s) paid | 19.10.2018 | Examination fee paid | Examination procedure | 19.10.2018 | Amendment by applicant (claims and/or description) | 19.10.2018 | Examination requested [2019/05] | 19.10.2018 | Date on which the examining division has become responsible | 05.08.2019 | Invitation to indicate the basis for amendments (Time limit: M01) | 14.08.2019 | Reply to an invitation to indicate the basis for amendments | 21.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 19.02.2020 | Reply to a communication from the examining division | 14.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2020 | Reply to a communication from the examining division | 10.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.03.2021 | Reply to a communication from the examining division | 02.07.2021 | Communication of intention to grant the patent | 11.11.2021 | Fee for grant paid | 11.11.2021 | Fee for publishing/printing paid | 11.11.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 23.09.2022 | No opposition filed within time limit [2022/48] | Fees paid | Renewal fee | 26.03.2019 | Renewal fee patent year 03 | 24.03.2020 | Renewal fee patent year 04 | 05.03.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.03.2017 | AL | 22.12.2021 | AT | 22.12.2021 | CY | 22.12.2021 | CZ | 22.12.2021 | DK | 22.12.2021 | EE | 22.12.2021 | ES | 22.12.2021 | FI | 22.12.2021 | HR | 22.12.2021 | IT | 22.12.2021 | LT | 22.12.2021 | LV | 22.12.2021 | MC | 22.12.2021 | MK | 22.12.2021 | MT | 22.12.2021 | NL | 22.12.2021 | PL | 22.12.2021 | RO | 22.12.2021 | RS | 22.12.2021 | SE | 22.12.2021 | SI | 22.12.2021 | SK | 22.12.2021 | SM | 22.12.2021 | BG | 22.03.2022 | IE | 22.03.2022 | LU | 22.03.2022 | NO | 22.03.2022 | GR | 23.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | IS | 22.04.2022 | PT | 22.04.2022 | [2024/44] |
Former [2024/22] | HU | 22.03.2017 | |
AL | 22.12.2021 | ||
AT | 22.12.2021 | ||
CY | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
IT | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
MK | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SI | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2024/20] | HU | 22.03.2017 | |
AL | 22.12.2021 | ||
AT | 22.12.2021 | ||
CY | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
IT | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SI | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2024/18] | HU | 22.03.2017 | |
AL | 22.12.2021 | ||
AT | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
IT | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SI | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2023/27] | AL | 22.12.2021 | |
AT | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
IT | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SI | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2023/10] | AL | 22.12.2021 | |
AT | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SI | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2023/09] | AL | 22.12.2021 | |
AT | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2023/08] | AL | 22.12.2021 | |
AT | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
IE | 22.03.2022 | ||
LU | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2022/49] | AL | 22.12.2021 | |
AT | 22.12.2021 | ||
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2022/47] | AT | 22.12.2021 | |
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
MC | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2022/46] | AT | 22.12.2021 | |
CZ | 22.12.2021 | ||
DK | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2022/42] | AT | 22.12.2021 | |
CZ | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
IS | 22.04.2022 | ||
PT | 22.04.2022 | ||
Former [2022/36] | AT | 22.12.2021 | |
CZ | 22.12.2021 | ||
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
NL | 22.12.2021 | ||
PL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
PT | 22.04.2022 | ||
Former [2022/35] | CZ | 22.12.2021 | |
EE | 22.12.2021 | ||
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
NL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SK | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
PT | 22.04.2022 | ||
Former [2022/34] | EE | 22.12.2021 | |
ES | 22.12.2021 | ||
FI | 22.12.2021 | ||
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
NL | 22.12.2021 | ||
RO | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
PT | 22.04.2022 | ||
Former [2022/33] | FI | 22.12.2021 | |
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
NL | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
SM | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
Former [2022/30] | FI | 22.12.2021 | |
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
NL | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
Former [2022/25] | FI | 22.12.2021 | |
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
BG | 22.03.2022 | ||
NO | 22.03.2022 | ||
GR | 23.03.2022 | ||
Former [2022/24] | FI | 22.12.2021 | |
HR | 22.12.2021 | ||
LT | 22.12.2021 | ||
LV | 22.12.2021 | ||
RS | 22.12.2021 | ||
SE | 22.12.2021 | ||
BG | 22.03.2022 | ||
GR | 23.03.2022 | ||
Former [2022/22] | FI | 22.12.2021 | |
LT | 22.12.2021 | ||
RS | 22.12.2021 | ||
BG | 22.03.2022 | ||
Former [2022/21] | RS | 22.12.2021 | |
BG | 22.03.2022 | ||
Former [2022/19] | BG | 22.03.2022 | Cited in | International search | [X]US2004140587 (HADLEY PHILIP C [GB]); | [XAI]US6818159 (HINZ BERNHARD [DE]); | [XAI]EP2404743 (LM GLASFIBER AS [DK]); | [X]US2013099426 (HEIM CLEMENS [DE], et al); | [X]EP2871047 (SIEMENS AG [DE]) | Examination | US2014216634 |