EP3424173 - TECHNIQUE FOR MULTI-CARRIER TRANSMISSION IN A TRANSMIT OPPORTUNITY INTERVAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.02.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 12.03.2021 | ||
Former | Grant of patent is intended Status updated on 15.02.2021 | ||
Former | Examination is in progress Status updated on 30.10.2020 | ||
Former | Request for examination was made Status updated on 07.12.2018 | ||
Former | The international publication has been made Status updated on 08.09.2017 | ||
Former | unknown Status updated on 18.04.2017 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (PUBL) 164 83 Stockholm / SE | [2019/02] | Inventor(s) | 01 /
ANSARI, Junaid Robensstrasse 24 52070 Aachen / DE | 02 /
KARAKI, Reem Wildbacher Mühle 51 52074 Aachen / DE | [2019/02] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [N/P] |
Former [2021/15] | Zacco Sweden AB P.O. Box 5581 114 85 Stockholm / SE | ||
Former [2019/02] | v. Bezold & Partner Patentanwälte - PartG mbB Akademiestraße 7 80799 München / DE | Application number, filing date | 17715632.0 | 28.02.2017 | [2019/02] | WO2017EP54638 | Priority number, date | US201662301087P | 29.02.2016 Original published format: US 201662301087 P | [2019/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017148944 | Date: | 08.09.2017 | Language: | EN | [2017/36] | Type: | A1 Application with search report | No.: | EP3424173 | Date: | 09.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.09.2017 takes the place of the publication of the European patent application. | [2019/02] | Type: | B1 Patent specification | No.: | EP3424173 | Date: | 14.04.2021 | Language: | EN | [2021/15] | Search report(s) | International search report - published on: | EP | 08.09.2017 | Classification | IPC: | H04L5/00, H04L27/00, H04W16/14, H04W74/08 | [2019/02] | CPC: |
H04L5/001 (EP,US);
H04W74/0816 (US);
H04L27/0006 (EP,US);
H04L5/0053 (EP,US);
H04W16/14 (EP,US);
H04W72/0453 (US);
H04W74/0808 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR MEHRTRÄGERÜBERTRAGUNG IN EINEM SENDEGELEGENHEITSINTERVALL | [2019/02] | English: | TECHNIQUE FOR MULTI-CARRIER TRANSMISSION IN A TRANSMIT OPPORTUNITY INTERVAL | [2019/02] | French: | TECHNIQUE DE TRANSMISSION À PORTEUSES MULTIPLES DANS UN INTERVALLE D'OPPORTUNITÉ DE TRANSMISSION | [2019/02] | Entry into regional phase | 27.09.2018 | National basic fee paid | 27.09.2018 | Designation fee(s) paid | 27.09.2018 | Examination fee paid | Examination procedure | 27.09.2018 | Examination requested [2019/02] | 27.09.2018 | Date on which the examining division has become responsible | 13.02.2019 | Amendment by applicant (claims and/or description) | 02.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.01.2021 | Reply to a communication from the examining division | 16.02.2021 | Communication of intention to grant the patent | 05.03.2021 | Fee for grant paid | 05.03.2021 | Fee for publishing/printing paid | 05.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 17.01.2022 | No opposition filed within time limit [2022/12] | Fees paid | Renewal fee | 27.02.2019 | Renewal fee patent year 03 | 27.02.2020 | Renewal fee patent year 04 | 25.02.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2017 | AL | 14.04.2021 | AT | 14.04.2021 | CY | 14.04.2021 | CZ | 14.04.2021 | DK | 14.04.2021 | EE | 14.04.2021 | ES | 14.04.2021 | FI | 14.04.2021 | HR | 14.04.2021 | IT | 14.04.2021 | LT | 14.04.2021 | LV | 14.04.2021 | MC | 14.04.2021 | MK | 14.04.2021 | MT | 14.04.2021 | PL | 14.04.2021 | RO | 14.04.2021 | RS | 14.04.2021 | SE | 14.04.2021 | SI | 14.04.2021 | SK | 14.04.2021 | SM | 14.04.2021 | TR | 14.04.2021 | BG | 14.07.2021 | NO | 14.07.2021 | GR | 15.07.2021 | IS | 14.08.2021 | PT | 16.08.2021 | [2024/44] |
Former [2024/29] | HU | 28.02.2017 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
MK | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
TR | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2024/22] | HU | 28.02.2017 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
MK | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2024/20] | HU | 28.02.2017 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2024/18] | HU | 28.02.2017 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/44] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/36] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/29] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/26] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/23] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/10] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/08] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/07] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/52] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/51] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/50] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
Former [2021/49] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
Former [2021/47] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | ||
BG | 14.07.2021 | ||
Former [2021/46] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | Cited in | International search | [X]US2015289208 (LIU JIALING [US], et al) [X] 1-4,6,8,9,16,23-28 * paragraphs [0088] , [ 104] - [0106] * * figures 10, 11, 13 *; | [A]US2015373582 (VALLIAPPAN NACHIAPPAN [US], et al) [A] 1-28 * paragraphs [0035] - [0036] *; | [A]US2015373741 (YERRAMALLI SRINIVAS [US], et al) [A] 1-28* paragraphs [0007] - [0012] *; | [XI] - LENOVO, "Multi-carrier LBT operation for LAA", vol. RAN WG1, no. Malmö, Sweden; 20151005 - 20151009, (20151004), 3GPP DRAFT; R1-155816, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20151004), XP051002619 [X] 1-4,6-9,15,16,20,23-28 * sections 1-4 * [I] 5,10-14,17-19,21,22 | Examination | US2014341018 |