blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3607645

EP3607645 - DC OFFSET COMPENSATION IN MODULAR MULTILEVEL CONVERTER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.06.2022
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  09.07.2021
FormerGrant of patent is intended
Status updated on  30.03.2021
FormerRequest for examination was made
Status updated on  10.01.2020
FormerThe international publication has been made
Status updated on  13.10.2018
Formerunknown
Status updated on  18.04.2017
Most recent event   Tooltip10.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 12.06.2024  [2024/24]
Applicant(s)For all designated states
Hitachi Energy Switzerland AG
Bruggerstrasse 72
5400 Baden / CH
[2022/03]
Former [2021/12]For all designated states
ABB Power Grids Switzerland AG
Bruggerstrasse 72
5400 Baden / CH
Former [2020/07]For all designated states
ABB Schweiz AG
Brown Boveri Strasse 6
5400 Baden / CH
Inventor(s)01 / COLAK, Ilknur
Maidenbergstrasse 3A
93059 Regensburg / CH
02 / KE, Xinhua
Sonnhalde 2
5210 Windisch / CH
 [2021/32]
Former [2020/07]01 / COLAK, Ilknur
Maidenbergstrasse 3A
93059 Regensburg / CH
02 / KE, Xinhua
Austrasse
5300 Turgi / CH
Representative(s)AWA Sweden AB
Box 45086
104 30 Stockholm / SE
[N/P]
Former [2021/32]AWA Sweden AB
P.O. Box 45086
104 30 Stockholm / SE
Former [2020/07]Kransell & Wennborg KB
P.O. Box 27834
115 93 Stockholm / SE
Application number, filing date17715713.805.04.2017
[2020/07]
WO2017EP58046
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018184669
Date:11.10.2018
Language:EN
[2018/41]
Type: A1 Application with search report 
No.:EP3607645
Date:12.02.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 11.10.2018 takes the place of the publication of the European patent application.
[2020/07]
Type: B1 Patent specification 
No.:EP3607645
Date:11.08.2021
Language:EN
[2021/32]
Search report(s)International search report - published on:EP11.10.2018
ClassificationIPC:H02M7/483, // H02M7/48
[2021/12]
CPC:
H02M7/483 (EP,US); H02M7/4803 (EP,US); H02M7/4835 (EP,US);
H02M7/49 (US)
Former IPC [2020/07]H02M7/483
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/07]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:DC-VERSATZ-KOMPENSATION IN EINEM MODULAREN MEHRPUNKTUMRICHTER[2021/12]
English:DC OFFSET COMPENSATION IN MODULAR MULTILEVEL CONVERTER[2020/07]
French:COMPENSATION DU DÉCALAGE CC DANS UN CONVERTISSEUR MODULAIRE MULTI-NIVEAUX[2021/12]
Former [2020/07]GLEICHSPANNUNGSVERSATZKOMPENSATION BEI EINEM MODULAREN MEHRPEGELUMSETZER
Former [2020/07]COMPENSATION DE DÉCALAGE DE COURANT CONTINU DANS UN CONVERTISSEUR MULTINIVEAU MODULAIRE
Entry into regional phase01.11.2019National basic fee paid 
01.11.2019Designation fee(s) paid 
01.11.2019Examination fee paid 
Examination procedure05.02.2019Request for preliminary examination filed
International Preliminary Examining Authority: EP
01.11.2019Amendment by applicant (claims and/or description)
01.11.2019Examination requested  [2020/07]
01.11.2019Date on which the examining division has become responsible
31.03.2021Communication of intention to grant the patent
01.07.2021Fee for grant paid
01.07.2021Fee for publishing/printing paid
01.07.2021Receipt of the translation of the claim(s)
Opposition(s)12.05.2022No opposition filed within time limit [2022/29]
Fees paidRenewal fee
01.11.2019Renewal fee patent year 03
27.04.2020Renewal fee patent year 04
29.04.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.04.2017
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
IE05.04.2022
LU05.04.2022
BE30.04.2022
CH30.04.2022
FR30.04.2022
LI30.04.2022
[2024/24]
Former [2024/22]AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
IE05.04.2022
LU05.04.2022
BE30.04.2022
CH30.04.2022
FR30.04.2022
LI30.04.2022
Former [2024/20]AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
IE05.04.2022
LU05.04.2022
BE30.04.2022
CH30.04.2022
FR30.04.2022
LI30.04.2022
Former [2023/20]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
IE05.04.2022
LU05.04.2022
BE30.04.2022
CH30.04.2022
FR30.04.2022
LI30.04.2022
Former [2023/10]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
LU05.04.2022
BE30.04.2022
CH30.04.2022
FR30.04.2022
LI30.04.2022
Former [2023/09]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
LU05.04.2022
CH30.04.2022
FR30.04.2022
LI30.04.2022
Former [2023/08]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
LU05.04.2022
Former [2023/06]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/36]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/29]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/25]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/24]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/21]AT11.08.2021
DK11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/16]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/10]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/09]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
PT13.12.2021
Former [2022/08]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
Former [2022/07]AT11.08.2021
LT11.08.2021
NO11.11.2021
Cited inInternational search[IA]EP3142241  (ABB TECHNOLOGY AG [CH]) [I] 1-5,8-12 * figure 1 * * paragraphs [0002] - [0013] - [0015] - [0017] *[A] 6,7
ExaminationUS2011032739
 WO2018033204
    - GERCEK CEM OZGUR ET AL, "Elimination of Coupling Transformer Core Saturation in Cascaded Multilevel Converter-Based T-STATCOM Systems", IEEE TRANSACTIONS ON POWER ELECTRONICS, INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, USA, vol. 29, no. 12, doi:10.1109/TPEL.2014.2306917, ISSN 0885-8993, (20141201), pages 6796 - 6809, (20140813), XP011556083

DOI:   http://dx.doi.org/10.1109/TPEL.2014.2306917
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.