EP3443180 - SAFETY RAILING FOR FORMWORK FOR FLOOR SLABS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.08.2022 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 10.09.2021 | ||
Former | Grant of patent is intended Status updated on 02.05.2021 | ||
Former | Examination is in progress Status updated on 01.11.2019 | ||
Former | Request for examination was made Status updated on 18.01.2019 | ||
Former | The international publication has been made Status updated on 20.10.2017 | ||
Former | unknown Status updated on 21.04.2017 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states Faresin Formwork S.p.A. Via Della Meccanica, 1 36042 Breganze (VI) / IT | [2019/08] | Inventor(s) | 01 /
FARESIN, Guido Via Ca' Molin 11 36061 Bassano Del Grappa / IT | [2019/08] | Representative(s) | Modiano, Micaela Nadia Modiano & Partners Via Meravigli, 16 20123 Milano / IT | [2019/08] | Application number, filing date | 17716543.8 | 11.04.2017 | [2019/08] | WO2017EP58622 | Priority number, date | IT2016UA02457 | 11.04.2016 Original published format: IT UA20162457 | [2019/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017178460 | Date: | 19.10.2017 | Language: | EN | [2017/42] | Type: | A1 Application with search report | No.: | EP3443180 | Date: | 20.02.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.10.2017 takes the place of the publication of the European patent application. | [2019/08] | Type: | B1 Patent specification | No.: | EP3443180 | Date: | 13.10.2021 | Language: | EN | [2021/41] | Search report(s) | International search report - published on: | EP | 19.10.2017 | Classification | IPC: | E04G11/38, E04G17/00, E04G21/32, E04G11/50, E04G5/14 | [2019/08] | CPC: |
E04G17/002 (EP);
E04G11/50 (EP);
E04G21/3223 (EP);
E04G2005/148 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SICHERHEITSGELÄNDER FÜR SCHALUNGEN FÜR BODENPLATTEN | [2019/08] | English: | SAFETY RAILING FOR FORMWORK FOR FLOOR SLABS | [2019/08] | French: | GARDE-CORPS DE SÉCURITÉ POUR COFFRAGE POUR DALLES DE PLANCHER | [2019/08] | Entry into regional phase | 08.11.2018 | National basic fee paid | 08.11.2018 | Designation fee(s) paid | 08.11.2018 | Examination fee paid | Examination procedure | 08.11.2018 | Examination requested [2019/08] | 08.11.2018 | Date on which the examining division has become responsible | 13.06.2019 | Amendment by applicant (claims and/or description) | 09.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 18.05.2020 | Reply to a communication from the examining division | 03.09.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.01.2021 | Reply to a communication from the examining division | 03.05.2021 | Communication of intention to grant the patent | 07.09.2021 | Fee for grant paid | 07.09.2021 | Fee for publishing/printing paid | 07.09.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 14.07.2022 | No opposition filed within time limit [2022/38] | Fees paid | Renewal fee | 08.11.2018 | Renewal fee patent year 03 | 20.03.2020 | Renewal fee patent year 04 | 24.03.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 13.10.2021 | CZ | 13.10.2021 | EE | 13.10.2021 | LT | 13.10.2021 | LV | 13.10.2021 | MC | 13.10.2021 | MK | 13.10.2021 | RO | 13.10.2021 | SM | 13.10.2021 | GR | 14.01.2022 | PT | 14.02.2022 | AT | 11.04.2022 | BG | 11.04.2022 | FI | 11.04.2022 | GB | 11.04.2022 | HR | 11.04.2022 | IE | 11.04.2022 | IT | 11.04.2022 | LU | 11.04.2022 | PL | 11.04.2022 | RS | 11.04.2022 | SK | 11.04.2022 | ES | 12.04.2022 | HU | 12.04.2022 | SE | 12.04.2022 | SI | 12.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | DK | 30.04.2022 | LI | 30.04.2022 | NO | 30.04.2022 | NL | 01.05.2022 | [2024/34] |
Former [2024/25] | CY | 13.10.2021 | |
CZ | 13.10.2021 | ||
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
AT | 11.04.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
IT | 11.04.2022 | ||
LU | 11.04.2022 | ||
PL | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
ES | 12.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
DK | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2024/22] | CY | 13.10.2021 | |
CZ | 13.10.2021 | ||
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
AT | 11.04.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
IT | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
ES | 12.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
DK | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2024/20] | CY | 13.10.2021 | |
CZ | 13.10.2021 | ||
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
AT | 11.04.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
IT | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
ES | 12.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
DK | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/35] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
AT | 11.04.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
IT | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
ES | 12.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
DK | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/33] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
IT | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
ES | 12.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
DK | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/25] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
IT | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
DK | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/21] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
DK | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/20] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
IE | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/10] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
HR | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
HU | 12.04.2022 | ||
SE | 12.04.2022 | ||
SI | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/09] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
RO | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SK | 11.04.2022 | ||
SE | 12.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/08] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
FI | 11.04.2022 | ||
GB | 11.04.2022 | ||
LU | 11.04.2022 | ||
RS | 11.04.2022 | ||
SE | 12.04.2022 | ||
NO | 30.04.2022 | ||
NL | 01.05.2022 | ||
Former [2023/06] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/35] | CZ | 13.10.2021 | |
EE | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/34] | EE | 13.10.2021 | |
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/33] | LT | 13.10.2021 | |
LV | 13.10.2021 | ||
SM | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/24] | LT | 13.10.2021 | |
LV | 13.10.2021 | ||
GR | 14.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/22] | LT | 13.10.2021 | Cited in | International search | [XAI]DE9410303U (KLOEBER JOHANNES [DE]) [X] 1-5,9,10 * figures 1-4 * [A] 6 [I] 7,8; | [A]DE29713095U (WEGLAGE GEORG [DE]) [A] 1-10* the whole document *; | [IA]US2003042072 (MURRAY JEFFERY L [US]) [I] 1-3,7-10 * figures 1-4 * [A] 4-6; | [XAI]AT6165U (RINGER KG [AT]) [X] 1,2,9,10 * figures 1-3 * [A] 3-6 [I] 7,8; | [A]EP1683930 (INGENIERIA ENCOFRADOS SERVI SL [ES]) [A] 1-10 * the whole document *; | [XAI]EP1944430 (ULMA C Y E S COOP [ES]) [X] 1-3,6,9 * figures 7.1,7.2,3,15,16 * [A] 4,5,10 [I] 7,8; | [A]EP1980681 (SISTEMAS TECN ENCOFRADOS SA [ES]) [A] 1-10 * the whole document * | Examination | FR2441696 |