blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3400636

EP3400636 - CIRCUIT AND METHOD FOR CONTROLLING AND MEASURING A CURRENT IN A CHARGE ELEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.01.2023
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  04.02.2022
FormerGrant of patent is intended
Status updated on  19.09.2021
FormerExamination is in progress
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  31.03.2021
FormerExamination is in progress
Status updated on  09.12.2019
FormerRequest for examination was made
Status updated on  12.10.2018
FormerThe international publication has been made
Status updated on  14.07.2017
Formerunknown
Status updated on  25.04.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Silicon Line GmbH
Landsberger Str. 314 / III Rgb.
80687 München / DE
[2018/46]
Inventor(s)01 / BELLINGRATH, Thomas
Altbuchhorster Str. 36 c
15537 Gruenheide (Mark) / DE
 [2018/46]
Representative(s)Hofmann, Andreas, et al
RGTH
Patentanwälte PartGmbB
Postfach 33 02 11
80062 München / DE
[2018/46]
Application number, filing date17717069.304.01.2017
[2018/46]
WO2017DE100003
Priority number, dateEP2016015011104.01.2016         Original published format: EP 16150111
[2018/46]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017118455
Date:13.07.2017
Language:DE
[2017/28]
Type: A1 Application with search report 
No.:EP3400636
Date:14.11.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 13.07.2017 takes the place of the publication of the European patent application.
[2018/46]
Type: B1 Patent specification 
No.:EP3400636
Date:09.03.2022
Language:DE
[2022/10]
Search report(s)International search report - published on:EP13.07.2017
ClassificationIPC:H01S5/068, H01S5/042, H05B45/32, H05B45/345, G05F1/10
[2021/17]
CPC:
H01S5/06808 (EP,US); G01R19/0092 (US); G05F1/10 (EP,US);
H01S5/026 (US); H01S5/0261 (US); H01S5/0427 (EP,US);
H01S5/068 (US); H01S5/042 (US); H03K2217/0027 (EP);
H05B45/32 (EP,US); H05B45/345 (EP,US) (-)
Former IPC [2018/46]H01S5/068, H01S5/042, H05B33/08, G01R19/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/46]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SCHALTUNGSANORDNUNG UND VERFAHREN ZUM STEUERN UND MESSEN EINES STROMS IN EINEM LASTELEMENT[2018/46]
English:CIRCUIT AND METHOD FOR CONTROLLING AND MEASURING A CURRENT IN A CHARGE ELEMENT[2018/46]
French:CIRCUIT ET PROCÉDÉ DE COMMANDE ET DE MESURE D'UN COURANT DANS UN ÉLÉMENT DE CHARGE[2018/46]
Entry into regional phase06.08.2018National basic fee paid 
06.08.2018Designation fee(s) paid 
06.08.2018Examination fee paid 
Examination procedure06.08.2018Examination requested  [2018/46]
06.08.2018Date on which the examining division has become responsible
26.02.2019Amendment by applicant (claims and/or description)
12.12.2019Despatch of a communication from the examining division (Time limit: M08)
24.08.2020Reply to a communication from the examining division
01.04.2021Communication of intention to grant the patent
11.08.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
20.09.2021Communication of intention to grant the patent
31.01.2022Fee for grant paid
31.01.2022Fee for publishing/printing paid
31.01.2022Receipt of the translation of the claim(s)
Opposition(s)12.12.2022No opposition filed within time limit [2023/07]
Fees paidRenewal fee
31.01.2019Renewal fee patent year 03
31.01.2020Renewal fee patent year 04
01.02.2021Renewal fee patent year 05
31.01.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
[2024/29]
Former [2023/35]AL09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/10]AL09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/07]AL09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/01]AL09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2022/51]CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2022/50]CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/49]CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/48]CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/47]ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/39]FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/36]HR09.03.2022
LT09.03.2022
LV09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/35]HR09.03.2022
LT09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
Former [2022/33]LT09.03.2022
NO09.06.2022
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.