Extract from the Register of European Patents

EP About this file: EP3443224

EP3443224 - GASKET FOR WIND TURBINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.01.2021
Database last updated on 28.03.2026
FormerThe patent has been granted
Status updated on  14.02.2020
FormerGrant of patent is intended
Status updated on  29.09.2019
FormerRequest for examination was made
Status updated on  18.01.2019
FormerThe international publication has been made
Status updated on  20.10.2017
Formerunknown
Status updated on  01.05.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): AL, MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Pur Wind ApS
Søgade 18
6000 Kolding / DK
For all designated states
Rosen Swiss AG
Obere Spichermatt 14
6370 Stans / CH
[2019/25]
Former [2019/08]For all designated states
Pur Wind ApS
Sogade 18
6000 Kolding / DK
Inventor(s)01 / NISSEN PETERSEN, Claus
Søgade 18
6000 Kolding / DK
 [2019/08]
Representative(s)Høiberg P/S
Adelgade 12
1304 Copenhagen K / DK
[2019/08]
Application number, filing date17718512.118.04.2017
[2019/08]
WO2017EP59092
Priority number, dateEP2016016547915.04.2016         Original published format: EP 16165479
EP2016016883910.05.2016         Original published format: EP 16168839
EP2016019830911.11.2016         Original published format: EP 16198309
[2019/08]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017178657
Date:19.10.2017
Language:EN
[2017/42]
Type: A1 Application with search report 
No.:EP3443224
Date:20.02.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 19.10.2017 takes the place of the publication of the European patent application.
[2019/08]
Type: B1 Patent specification 
No.:EP3443224
Date:18.03.2020
Language:EN
[2020/12]
Search report(s)International search report - published on:EP19.10.2017
ClassificationIPC:F03D13/20, F03D1/00, F03D13/25, E02D27/42, F03D13/10
[2019/08]
CPC:
F03D13/10 (EP,KR,RU,US); E02D27/425 (EP,KR,RU); E02B17/0004 (EP,KR);
F03D1/00 (RU); F03D13/20 (EP,KR,RU); F03D13/22 (EP,US);
F03D13/25 (EP,KR,RU,US); E02B2017/0065 (EP); E02B2017/0091 (EP,KR);
F05B2230/60 (EP,KR); F05B2240/912 (EP,KR,US); F05B2240/95 (EP,KR,US);
F05B2280/5001 (US); Y02E10/72 (EP); Y02E10/727 (KR);
Y02E10/728 (KR); Y02P70/50 (KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/08]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:DICHTUNG FÜR EINE WINDTURBINE[2019/37]
English:GASKET FOR WIND TURBINE[2019/08]
French:JOINT D'ÉTANCHÉITÉ POUR TURBINE ÉOLIENNE[2019/37]
Former [2019/08]DICHTUNG FÜR WINDTURBINE
Former [2019/08]JOINT D'ÉTANCHÉITÉ POUR ÉOLIENNE
Entry into regional phase14.11.2018National basic fee paid 
14.11.2018Designation fee(s) paid 
14.11.2018Examination fee paid 
Examination procedure14.02.2018Request for preliminary examination filed
International Preliminary Examining Authority: EP
14.11.2018Examination requested  [2019/08]
14.11.2018Date on which the examining division has become responsible
19.06.2019Amendment by applicant (claims and/or description)
30.09.2019Communication of intention to grant the patent
04.02.2020Fee for grant paid
04.02.2020Fee for publishing/printing paid
04.02.2020Receipt of the translation of the claim(s)
Opposition(s)21.12.2020No opposition filed within time limit [2021/08]
Fees paidRenewal fee
26.04.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL18.03.2020
AT18.03.2020
CY18.03.2020
EE18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MK18.03.2020
MT18.03.2020
SM18.03.2020
LU18.04.2020
CH30.04.2020
LI30.04.2020
IS18.07.2020
[2022/31]
Former [2022/28]AT18.03.2020
CY18.03.2020
EE18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
SM18.03.2020
LU18.04.2020
CH30.04.2020
LI30.04.2020
IS18.07.2020
Former [2021/11]AT18.03.2020
EE18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
SM18.03.2020
LU18.04.2020
CH30.04.2020
LI30.04.2020
IS18.07.2020
Former [2021/08]EE18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
SM18.03.2020
LU18.04.2020
CH30.04.2020
LI30.04.2020
IS18.07.2020
Former [2021/04]EE18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
SM18.03.2020
IS18.07.2020
Former [2020/50]EE18.03.2020
LT18.03.2020
LV18.03.2020
SM18.03.2020
IS18.07.2020
Former [2020/48]LT18.03.2020
LV18.03.2020
SM18.03.2020
IS18.07.2020
Former [2020/47]LT18.03.2020
LV18.03.2020
IS18.07.2020
Former [2020/46]LV18.03.2020
IS18.07.2020
Former [2020/38]LV18.03.2020
Cited inInternational search[XAI] US2006185279  (EUSTERBARKEY CARSTEN et al.) [X] 1,2,8,15,23,25 * paragraph [0054] - paragraph [0056]; figure 1 *[A] 12-14,16-22,24,27 [I] 3-7,9-11,26,28,29
 [XP] EP3064309  (GEOSEA NV et al.) [XP] 1,2,8,15,23 * page 1, paragraph 33; figure 4 *
 [A] GB2475305  (STATOIL ASA et al.) [A] 22 * abstract *
ExaminationEP2910686
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.