| EP3445484 - BARREL REACTOR WITH ELECTRODES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.08.2024 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 25.08.2023 | ||
| Former | Grant of patent is intended Status updated on 19.04.2023 | ||
| Former | Examination is in progress Status updated on 18.09.2020 | ||
| Former | Request for examination was made Status updated on 25.01.2019 | ||
| Former | The international publication has been made Status updated on 28.10.2017 | ||
| Former | unknown Status updated on 05.05.2017 | Most recent event Tooltip | 05.09.2025 | Lapse of the patent in a contracting state New state(s): HU | published on 08.10.2025 [2025/41] | Applicant(s) | For all designated states University College Dublin, National University of Ireland Belfield Dublin 4 / IE | [2019/09] | Inventor(s) | 01 /
DOBBYN, Peter c/o University College Dublin National University of Ireland Dublin Belfield 4 / IE | 02 /
DOWLING, Denis c/o University College Dublin National University of Ireland Dublin Belfield 4 / IE | [2019/09] | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [2019/09] | Application number, filing date | 17719546.8 | 20.04.2017 | [2019/09] | WO2017EP59397 | Priority number, date | GB20160006922 | 21.04.2016 Original published format: GB 201606922 | [2019/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017182570 | Date: | 26.10.2017 | Language: | EN | [2017/43] | Type: | A1 Application with search report | No.: | EP3445484 | Date: | 27.02.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.10.2017 takes the place of the publication of the European patent application. | [2019/09] | Type: | B1 Patent specification | No.: | EP3445484 | Date: | 27.09.2023 | Language: | EN | [2023/39] | Search report(s) | International search report - published on: | EP | 26.10.2017 | Classification | IPC: | B01J19/28, B01J8/10, B01J19/08, B01J19/20 | [2019/09] | CPC: |
B01J19/28 (EP,US);
B01J19/088 (EP,US);
B01J19/20 (EP,US);
B01J8/10 (EP,US);
H05H1/2406 (EP);
B01J2219/0809 (EP,US);
B01J2219/0818 (EP,US);
B01J2219/083 (EP,US);
B01J2219/0852 (EP,US);
B01J2219/0856 (EP,US);
B01J2219/0858 (EP,US);
B01J2219/0869 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/09]
| Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ZYLINDERREAKTOR MIT ELEKTRODEN | [2019/09] | English: | BARREL REACTOR WITH ELECTRODES | [2019/09] | French: | RÉACTEUR CYLINDRIQUE COMPORTANT DES ÉLECTRODES | [2019/09] | Entry into regional phase | 14.11.2018 | National basic fee paid | 14.11.2018 | Designation fee(s) paid | 14.11.2018 | Examination fee paid | Examination procedure | 14.11.2018 | Amendment by applicant (claims and/or description) | 14.11.2018 | Examination requested [2019/09] | 14.11.2018 | Date on which the examining division has become responsible | 18.09.2020 | Despatch of a communication from the examining division (Time limit: M06) | 26.03.2021 | Reply to a communication from the examining division | 20.04.2023 | Communication of intention to grant the patent | 15.08.2023 | Fee for grant paid | 15.08.2023 | Fee for publishing/printing paid | 15.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 28.06.2024 | No opposition filed within time limit [2024/36] | Fees paid | Renewal fee | 25.04.2019 | Renewal fee patent year 03 | 28.04.2020 | Renewal fee patent year 04 | 26.04.2021 | Renewal fee patent year 05 | 30.03.2022 | Renewal fee patent year 06 | 21.03.2023 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 20.04.2017 | HU | 20.04.2017 | CZ | 27.09.2023 | ES | 27.09.2023 | HR | 27.09.2023 | MC | 27.09.2023 | PL | 27.09.2023 | RO | 27.09.2023 | RS | 27.09.2023 | SK | 27.09.2023 | SM | 27.09.2023 | NO | 27.12.2023 | GR | 28.12.2023 | IS | 27.01.2024 | GB | 20.04.2024 | IE | 20.04.2024 | CH | 30.04.2024 | [2025/41] |
| Former [2025/37] | CY | 20.04.2017 | |
| CZ | 27.09.2023 | ||
| ES | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| GB | 20.04.2024 | ||
| IE | 20.04.2024 | ||
| CH | 30.04.2024 | ||
| Former [2025/22] | CZ | 27.09.2023 | |
| ES | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| GB | 20.04.2024 | ||
| IE | 20.04.2024 | ||
| CH | 30.04.2024 | ||
| Former [2025/11] | CZ | 27.09.2023 | |
| ES | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| GB | 20.04.2024 | ||
| CH | 30.04.2024 | ||
| Former [2025/09] | CZ | 27.09.2023 | |
| ES | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| GB | 20.04.2024 | ||
| Former [2024/52] | CZ | 27.09.2023 | |
| ES | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| MC | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| Former [2024/25] | CZ | 27.09.2023 | |
| ES | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| PL | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| Former [2024/23] | CZ | 27.09.2023 | |
| ES | 27.09.2023 | ||
| HR | 27.09.2023 | ||
| RO | 27.09.2023 | ||
| RS | 27.09.2023 | ||
| SK | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| Former [2024/20] | HR | 27.09.2023 | |
| RS | 27.09.2023 | ||
| SM | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| IS | 27.01.2024 | ||
| Former [2024/11] | HR | 27.09.2023 | |
| RS | 27.09.2023 | ||
| NO | 27.12.2023 | ||
| GR | 28.12.2023 | ||
| Former [2024/08] | NO | 27.12.2023 | |
| GR | 28.12.2023 | Cited in | International search | [Y] WO2010142953 (HAYDALE LTD et al.) [Y] 1-30 * the whole document * | [Y] JP2011249014 (MITSUI CHEMICALS INC et al.) [Y] 1-30 * the whole document * | [Y] US4808286 (ANGELO II J F et al.) [Y] 1-30 * abstract * | [XI] D. P. DOWLING: "Comparison between the performance of fluidized bed and barrel rectors for the plasma activation of polymer particles", JOURNAL OF MINERAL METAL AND MATERIAL ENGINEERING, vol. 1, 23 December 2015 (2015-12-23), pages 57 - 64, XP002771250 [X] 1,9-12,18,29 * the whole document *[I] 2-8,13-17,19-28,30 | [XP] ABOURAYANA HISHAM M ET AL: "Investigation of a scalable barrel atmospheric plasma reactor for the treatment of polymer particles", SURFACE AND COATINGS TECHNOLOGY, ELSEVIER BV, AMSTERDAM, NL, vol. 308, 4 August 2016 (2016-08-04), pages 435 - 441, XP029827652, ISSN: 0257-8972, DOI: 10.1016/J.SURFCOAT.2016.06.094 [XP] 1-30 * the whole document * DOI: http://dx.doi.org/10.1016/j.surfcoat.2016.06.094 |