EP3442899 - CONTROL PANEL WITH ANTI-CRUSHING PROTECTION OF THE OPERATOR, FOR A GONDOLA LIFT WORK PLATFORM [Right-click to bookmark this link] | |||
Former [2019/08] | AERIAL-LIFT WORKING-PLATFORM CONTROL DESK WITH PROTECTION AGAINST CRUSHING OF THE OPERATOR | ||
[2020/02] | Status | No opposition filed within time limit Status updated on 29.10.2021 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 20.11.2020 | ||
Former | Grant of patent is intended Status updated on 12.07.2020 | ||
Former | Request for examination was made Status updated on 09.06.2020 | ||
Former | Grant of patent is intended Status updated on 11.12.2019 | ||
Former | Request for examination was made Status updated on 18.01.2019 | ||
Former | The international publication has been made Status updated on 20.10.2017 | ||
Former | unknown Status updated on 13.05.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Haulotte Group Rue Emile Zola 42420 Lorette / FR | [2020/51] |
Former [2019/08] | For all designated states Haulotte Group La Péronnière 42152 L'Horme / FR | Inventor(s) | 01 /
MAISONNETTE, Daniel 380 Rue des Acacias 42800 GENILAC / FR | 02 /
BONNEFOY, Nicolas 12bis Chemin de Voron 42400 SAINT-CHAMOND / FR | [2019/08] | Representative(s) | Reinhardt, Yves THARINDER 6ième étage 48 Rue Saint-Honoré 75001 Paris / FR | [2019/08] | Application number, filing date | 17721198.4 | 06.04.2017 | [2019/08] | WO2017FR50834 | Priority number, date | FR20160053384 | 15.04.2016 Original published format: FR 1653384 | [2019/08] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2017178737 | Date: | 19.10.2017 | Language: | FR | [2017/42] | Type: | A1 Application with search report | No.: | EP3442899 | Date: | 20.02.2019 | Language: | FR | The application published by WIPO in one of the EPO official languages on 19.10.2017 takes the place of the publication of the European patent application. | [2019/08] | Type: | B1 Patent specification | No.: | EP3442899 | Date: | 23.12.2020 | Language: | FR | [2020/52] | Search report(s) | International search report - published on: | EP | 19.10.2017 | Classification | IPC: | B66F11/04, B66F17/00 | [2019/08] | CPC: |
B66F17/006 (EP,US);
B66F11/04 (EP,US);
B66F11/042 (US);
B66F11/044 (EP,US);
B66F11/046 (US);
G01S17/93 (US);
G01V8/20 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BEDIENPULT MIT ANTI-ZERQUETSCH-SCHUTZ DES BETREIBERS, FÜR EINE HUBGONDEL-ARBEITSHEBEBÜHNE | [2020/02] | English: | CONTROL PANEL WITH ANTI-CRUSHING PROTECTION OF THE OPERATOR, FOR A GONDOLA LIFT WORK PLATFORM | [2020/02] | French: | PUPITRE DE COMMANDE AVEC PROTECTION ANTI-ECRASEMENT DE L'OPERATEUR POUR PLATE-FORME DE TRAVAIL DE NACELLE ELEVATRICE | [2019/08] |
Former [2019/08] | HUBARBEITSBÜHNENBEDIENPULT MIT QUETSCHSCHUTZ FÜR DEN BEDIENER | ||
Former [2019/08] | AERIAL-LIFT WORKING-PLATFORM CONTROL DESK WITH PROTECTION AGAINST CRUSHING OF THE OPERATOR | Entry into regional phase | 15.11.2018 | National basic fee paid | 15.11.2018 | Designation fee(s) paid | 15.11.2018 | Examination fee paid | Examination procedure | 15.11.2018 | Examination requested [2019/08] | 15.11.2018 | Date on which the examining division has become responsible | 05.06.2019 | Amendment by applicant (claims and/or description) | 12.12.2019 | Communication of intention to grant the patent | 31.03.2020 | Fee for grant paid | 31.03.2020 | Fee for publishing/printing paid | 29.05.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 13.07.2020 | Communication of intention to grant the patent | 10.11.2020 | Receipt of the translation of the claim(s) | 11.11.2020 | Fee for grant paid | 11.11.2020 | Fee for publishing/printing paid | Opposition(s) | 24.09.2021 | No opposition filed within time limit [2021/48] | Fees paid | Renewal fee | 30.04.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.04.2017 | AL | 23.12.2020 | AT | 23.12.2020 | CY | 23.12.2020 | CZ | 23.12.2020 | DK | 23.12.2020 | EE | 23.12.2020 | ES | 23.12.2020 | FI | 23.12.2020 | HR | 23.12.2020 | LT | 23.12.2020 | LV | 23.12.2020 | MC | 23.12.2020 | MK | 23.12.2020 | NL | 23.12.2020 | PL | 23.12.2020 | RO | 23.12.2020 | RS | 23.12.2020 | SE | 23.12.2020 | SI | 23.12.2020 | SK | 23.12.2020 | SM | 23.12.2020 | BG | 23.03.2021 | NO | 23.03.2021 | GR | 24.03.2021 | IE | 06.04.2021 | LU | 06.04.2021 | IS | 23.04.2021 | PT | 23.04.2021 | BE | 30.04.2021 | CH | 30.04.2021 | LI | 30.04.2021 | [2024/22] |
Former [2023/33] | HU | 06.04.2017 | |
AL | 23.12.2020 | ||
AT | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IE | 06.04.2021 | ||
LU | 06.04.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2023/30] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IE | 06.04.2021 | ||
LU | 06.04.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/34] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IE | 06.04.2021 | ||
LU | 06.04.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/23] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IE | 06.04.2021 | ||
LU | 06.04.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/21] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IE | 06.04.2021 | ||
LU | 06.04.2021 | ||
PT | 23.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/11] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
LU | 06.04.2021 | ||
PT | 23.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/10] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
LU | 06.04.2021 | ||
PT | 23.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/08] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
LU | 06.04.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/04] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
LU | 06.04.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/50] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/49] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/45] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/42] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/39] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/37] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/36] | CZ | 23.12.2020 | |
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/35] | CZ | 23.12.2020 | |
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/33] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/32] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/30] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
NL | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/28] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/23] | FI | 23.12.2020 | |
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SE | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/22] | FI | 23.12.2020 | |
RS | 23.12.2020 | ||
NO | 23.03.2021 | ||
Former [2021/20] | FI | 23.12.2020 | Cited in | International search | [XDYI]JPH05124800 (JAPANIC CORP) [XD] 2,4-8 * abstract * * figures 2, 3, 4, 5 * * paragraph [0014] - paragraph [0024] * [Y] 9,12 [I] 3,13-18; | [A]FR2836468 (PINGUELY HAULOTTE [FR]) [A] 2 * figure - * * claims 1, 6 *; | [A]US2005187712 (CALLAGHAN MICHAEL L [US], et al) [A] 2,5,6,12-17 * abstract * * figures 1, 2A, 2B, 3A, 3B, 4, 5, 7, 8, 10 * * paragraph [0034] - paragraph [0046] *; | [AD]KR20090062780 (WOO JONG KIL [KR]) [AD] 2* abstract *; | [A]CN102120556 (UNIV DALIAN TECH) [A] 2 * figure - *; | [A]CN202030492U (HUNAN SINOBOOM HEAVY INDUSTRY CO LTD) [A] 2 * figures 4, 5 *; | [A]JP2013010589 (TADANO LTD) [A] 1 * abstract * * selon le résumé et la traduction en anglais de la description: "...the structure sensor 35 includes an ultrasonic sensor 35a..."; "...the structure sensor 35 is provided at the vincinity of the operation part 33..."; "...the reflection member 35c reflects the ultrasonic wave ... toward the outer peripheral side of the handrail 23b ... toward the upper direction of the basket 23.".;; figures 2, 4, 5, 7 *; | [AD]GB2495158 (RICHARDS PAUL [GB]) [AD] 2 * figures 2, 3, 4 *; | [YDA]US2016075543 (LOMBARDO DAVID W [US], et al) [YD] 9,12 * figure - * * paragraph [0020] * * paragraph [0023] - paragraph [0024] * * paragraph [0031] - paragraph [0032] * * d'après la description: "...the sensing elements 22 can be based on optical, radar or accoustic sensing...". * [A] 2,3,5,7; | [A]EP3002248 (BLUESKY SOLUTIONS LTD [GB]) [A] 1,2,5,6,12-18 * figures 2A, 2B * * claim 1 * | by applicant | US2815250 | JPS5012100B | US4979588 | JPH0453800U | JPH0465299U | JPH0477600U | JPH05124800 | JPH0592298U | JPH107398 | KR20090062780 | KR20090063626 | EP2096078 | EP2190775 | WO2011015815 | GB2481709 | KR200465878Y | GB2495158 | FR3007401 | US2016075543 |