EP3465441 - DESIGN UND TESTEN VON VIRTUELLEN NUTZERSCHNITTSTELLEN [Right-click to bookmark this link] | |||
Former [2019/15] | DESIGN AND TESTING OF VIRTUAL USER INTERFACES | ||
[2019/43] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 21.02.2020 | ||
Former | Grant of patent is intended Status updated on 14.11.2019 | ||
Former | Request for examination was made Status updated on 04.11.2019 | ||
Former | Grant of patent is intended Status updated on 14.10.2019 | ||
Former | Request for examination was made Status updated on 08.03.2019 | ||
Former | The international publication has been made Status updated on 08.12.2017 | ||
Former | unknown Status updated on 16.05.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Haug, Thomas Kreuzstrasse 70 75217 Birkenfeld / DE | [2019/15] | Inventor(s) | 01 /
see applicant ... | [2019/15] | Representative(s) | Wacker, Jost Oliver Jost Wacker Patent-und Markenrechtskanzlei Schwarzwaldstraße 7 A 75173 Pforzheim / DE | [2019/15] | Application number, filing date | 17721569.6 | 25.04.2017 | [2019/15] | WO2017EP59737 | Priority number, date | DE201610110321 | 03.06.2016 Original published format: DE102016110321 | [2019/15] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017207171 | Date: | 07.12.2017 | Language: | DE | [2017/49] | Type: | A1 Application with search report | No.: | EP3465441 | Date: | 10.04.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application. | [2019/15] | Type: | B1 Patent specification | No.: | EP3465441 | Date: | 25.03.2020 | Language: | DE | [2020/13] | Search report(s) | International search report - published on: | EP | 07.12.2017 | Classification | IPC: | G06F11/34, G06F11/36, G06F3/048, // G06F17/50 | [2019/43] | CPC: |
G06F3/048 (EP,US);
G06F3/04847 (US);
G06F3/04817 (US);
G06F3/0488 (US);
G06F2111/20 (EP,US);
G06F30/00 (EP,US);
H04W4/80 (US)
(-)
|
Former IPC [2019/15] | G06F11/34, G06F11/36, G06F3/048 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | DESIGN AND TESTING OF VIRTUAL USER INTERFACES | [2019/43] | English: | DESIGN UND TESTEN VON VIRTUELLEN NUTZERSCHNITTSTELLEN | [2019/43] | French: | DESIGN ET TEST DES INTERFACES UTILISATEUR VIRTUEL | [2019/43] |
Former [2019/15] | DESIGN UND TESTEN VON VIRTUELLEN NUTZERSCHNITTSTELLEN | ||
Former [2019/15] | DESIGN AND TESTING OF VIRTUAL USER INTERFACES | ||
Former [2019/15] | CONCEPTION ET TEST D'INTERFACES UTILISATEUR VIRTUELLES | Entry into regional phase | 04.12.2018 | National basic fee paid | 04.12.2018 | Designation fee(s) paid | 04.12.2018 | Examination fee paid | Examination procedure | 04.12.2018 | Examination requested [2019/15] | 04.12.2018 | Date on which the examining division has become responsible | 16.07.2019 | Amendment by applicant (claims and/or description) | 15.10.2019 | Communication of intention to grant the patent | 30.10.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 15.11.2019 | Communication of intention to grant the patent | 14.02.2020 | Fee for grant paid | 14.02.2020 | Fee for publishing/printing paid | 14.02.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 30.04.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.04.2017 | AL | 25.03.2020 | CY | 25.03.2020 | CZ | 25.03.2020 | DK | 25.03.2020 | EE | 25.03.2020 | ES | 25.03.2020 | FI | 25.03.2020 | HR | 25.03.2020 | IT | 25.03.2020 | LT | 25.03.2020 | LV | 25.03.2020 | MC | 25.03.2020 | MK | 25.03.2020 | MT | 25.03.2020 | NL | 25.03.2020 | PL | 25.03.2020 | RO | 25.03.2020 | RS | 25.03.2020 | SE | 25.03.2020 | SI | 25.03.2020 | SK | 25.03.2020 | SM | 25.03.2020 | TR | 25.03.2020 | IE | 25.04.2020 | LU | 25.04.2020 | BE | 30.04.2020 | BG | 25.06.2020 | NO | 25.06.2020 | GR | 26.06.2020 | IS | 25.07.2020 | PT | 18.08.2020 | [2022/31] |
Former [2022/30] | HU | 25.04.2017 | |
AL | 25.03.2020 | ||
CY | 25.03.2020 | ||
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
MT | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
TR | 25.03.2020 | ||
IE | 25.04.2020 | ||
LU | 25.04.2020 | ||
BE | 30.04.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2022/27] | HU | 25.04.2017 | |
CY | 25.03.2020 | ||
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
MT | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
TR | 25.03.2020 | ||
IE | 25.04.2020 | ||
LU | 25.04.2020 | ||
BE | 30.04.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/24] | CZ | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
IE | 25.04.2020 | ||
LU | 25.04.2020 | ||
BE | 30.04.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/20] | CZ | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
IE | 25.04.2020 | ||
LU | 25.04.2020 | ||
BE | 30.04.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/10] | CZ | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
LU | 25.04.2020 | ||
BE | 30.04.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/09] | CZ | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
LU | 25.04.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/08] | CZ | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
LU | 25.04.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/04] | CZ | 25.03.2020 | |
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/50] | CZ | 25.03.2020 | |
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/49] | CZ | 25.03.2020 | |
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/48] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/47] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/46] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/45] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/39] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/38] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/37] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
NO | 25.06.2020 | ||
Former [2020/35] | FI | 25.03.2020 | |
NO | 25.06.2020 | Cited in | International search | [A]US5291587 (KODOSKY JEFFREY L [US], et al) [A] 1-10 * abstract * * column 3, line 40 - line 56 * * column 7, line 36 - column 9, line 43 * * column 22, line 48 - column 23, line 23 ** figures 1-5,7 *; | [I]US2008255818 (JEFFERSON STANLEY T [US], et al) [I] 1-10 * abstract * * figures 1-4 * * paragraph [0004] * * paragraph [0011] * * paragraph [0014] * * paragraph [0017] - paragraph [0023] * * paragraph [0029] - paragraph [0030] * * paragraph [0037] - paragraph [0038] * * paragraph [0040] * * paragraph [0042] * * paragraph [0046] - paragraph [0048] *; | [I] - Apple ET AL, "A Quick Tour of Xcode", (20030828), URL: https://www.ibr.cs.tu-bs.de/courses/ws0708/pcn/Doku/XcodeQuickTour.pdf, (20170703), XP055387405 [I] 1-10 * page 16 * * page 29 - page 38 * | by applicant | - DOMG-SIK; YANG, UNGYEON; SON, WOOK-HO, "Design evaluation System with visualization and interaction of mobile devices based on virtual reality prototypes", ETRI JOURNAL, (2008), vol. 30, no. 6, pages 757 - 764 | - "On hardware-in-the-loop simulation.", BACIC, MARKO, Proceedings of the 44th IEEE Conference on Decision and Control., IEEE, (2005), pages 3194 - 3198 |