blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3458758

EP3458758 - FIRE PROTECTION ELEMENT AND METHOD FOR PRODUCING A FIRE PROTECTION ELEMENT [Right-click to bookmark this link]
Former [2019/13]FIRE PROTECTION ELEMENT, AND METHOD FOR MANUFACTURING A FIRE PROTECTION ELEMENT
[2023/24]
StatusNo opposition filed within time limit
Status updated on  07.06.2024
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  30.06.2023
FormerGrant of patent is intended
Status updated on  29.05.2023
FormerExamination is in progress
Status updated on  05.11.2021
FormerRequest for examination was made
Status updated on  22.02.2019
FormerThe international publication has been made
Status updated on  25.11.2017
Formerunknown
Status updated on  19.05.2017
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): SI
published on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Hilti Aktiengesellschaft
Feldkircherstrasse 100
9494 Schaan / LI
[2019/13]
Inventor(s)01 / FÖRG, Christian
Gernbergweg 5
86862 Dillishausen / DE
 [2019/13]
Representative(s)Hilti Aktiengesellschaft Corporate Intellectual Property
Feldkircherstrasse 100
Postfach 333
9494 Schaan / LI
[2019/13]
Application number, filing date17722479.715.05.2017
[2019/13]
WO2017EP61568
Priority number, dateEP2016017005318.05.2016         Original published format: EP 16170053
[2019/13]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017198591
Date:23.11.2017
Language:DE
[2017/47]
Type: A1 Application with search report 
No.:EP3458758
Date:27.03.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 23.11.2017 takes the place of the publication of the European patent application.
[2019/13]
Type: B1 Patent specification 
No.:EP3458758
Date:02.08.2023
Language:DE
[2023/31]
Search report(s)International search report - published on:EP23.11.2017
ClassificationIPC:F16L5/04, A62C2/06, E04G15/06, F16L5/10, H02G3/04, H02G3/22
[2019/13]
CPC:
A62C2/065 (EP,US); E04G15/061 (EP,US); F16L5/04 (EP,US);
F16L5/10 (EP,US); H02G3/0412 (EP,US); B29C44/367 (US);
H02G3/22 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/13]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:BRANDSCHUTZELEMENT SOWIE VERFAHREN ZUR HERSTELLUNG EINES BRANDSCHUTZELEMENTS[2019/13]
English:FIRE PROTECTION ELEMENT AND METHOD FOR PRODUCING A FIRE PROTECTION ELEMENT[2023/24]
French:ÉLEMENT IGNIFUGE ET PROCEDE DE FABRICATION D'UN ELEMENT IGNIFUGE[2023/24]
Former [2019/13]FIRE PROTECTION ELEMENT, AND METHOD FOR MANUFACTURING A FIRE PROTECTION ELEMENT
Former [2019/13]ÉLÉMENT IGNIFUGE AINSI QUE PROCÉDÉ DE FABRICATION D'UN ÉLÉMENT IGNIFUGE
Entry into regional phase18.12.2018National basic fee paid 
18.12.2018Designation fee(s) paid 
18.12.2018Examination fee paid 
Examination procedure18.12.2018Examination requested  [2019/13]
18.12.2018Date on which the examining division has become responsible
08.05.2019Amendment by applicant (claims and/or description)
04.11.2021Despatch of a communication from the examining division (Time limit: M06)
02.05.2022Reply to a communication from the examining division
30.05.2023Communication of intention to grant the patent
26.06.2023Fee for grant paid
26.06.2023Fee for publishing/printing paid
26.06.2023Receipt of the translation of the claim(s)
Opposition(s)03.05.2024No opposition filed within time limit [2024/28]
Fees paidRenewal fee
23.05.2019Renewal fee patent year 03
22.05.2020Renewal fee patent year 04
18.05.2021Renewal fee patent year 05
25.03.2022Renewal fee patent year 06
23.03.2023Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ02.08.2023
DK02.08.2023
EE02.08.2023
ES02.08.2023
HR02.08.2023
IT02.08.2023
LT02.08.2023
LV02.08.2023
NL02.08.2023
PL02.08.2023
RO02.08.2023
RS02.08.2023
SE02.08.2023
SI02.08.2023
SK02.08.2023
SM02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
PT04.12.2023
[2024/36]
Former [2024/26]CZ02.08.2023
DK02.08.2023
EE02.08.2023
ES02.08.2023
HR02.08.2023
IT02.08.2023
LT02.08.2023
LV02.08.2023
NL02.08.2023
PL02.08.2023
RO02.08.2023
RS02.08.2023
SE02.08.2023
SK02.08.2023
SM02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
PT04.12.2023
Former [2024/23]CZ02.08.2023
DK02.08.2023
EE02.08.2023
ES02.08.2023
HR02.08.2023
LT02.08.2023
LV02.08.2023
NL02.08.2023
PL02.08.2023
RO02.08.2023
RS02.08.2023
SE02.08.2023
SK02.08.2023
SM02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
PT04.12.2023
Former [2024/22]CZ02.08.2023
DK02.08.2023
HR02.08.2023
LT02.08.2023
LV02.08.2023
NL02.08.2023
PL02.08.2023
RO02.08.2023
RS02.08.2023
SE02.08.2023
SM02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
PT04.12.2023
Former [2024/20]HR02.08.2023
LT02.08.2023
LV02.08.2023
NL02.08.2023
PL02.08.2023
RS02.08.2023
SE02.08.2023
SM02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
PT04.12.2023
Former [2024/10]HR02.08.2023
LT02.08.2023
LV02.08.2023
NL02.08.2023
PL02.08.2023
RS02.08.2023
SE02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
PT04.12.2023
Former [2024/09]LT02.08.2023
NL02.08.2023
SE02.08.2023
NO02.11.2023
GR03.11.2023
IS02.12.2023
Former [2024/08]LT02.08.2023
NL02.08.2023
NO02.11.2023
GR03.11.2023
Cited inInternational search[A]DE29712909U  (SCHOETTLER LUNOS LUEFTUNG [DE]) [A] 1-15 * claim 1 * * figure - *;
 [YA]DE19806012  (HILTI AG [LI]) [Y] 8,9 * column 4, line 40 - column 5, line 41 * * figure - * [A] 1-7,10-15;
 [A]EP1293714  (HILTI AG [LI]) [A] 1-15 * paragraph [0020] * * figure 1 *;
 [A]US2003192269  (RADKE DUWAYNE C [US], et al) [A] 1-15 * paragraph [0044] * * figures 6, 7 *;
 [A]EP2570157  (HILTI AG [LI]) [A] 13-15* column 10, line 26 - line 34 *;
 [X]EP2682657  (HILTI AG [LI]) [X] 1-3,7,10,11 * paragraph [0024] - paragraph [0026] * * figures 1,2a,2b *;
 [XYI]EP2689808  (HILTI AG [LI]) [X] 1,2,4,7,10-12 * paragraph [0026] - paragraph [0031] * * paragraph [0040] * * figures 1,3,4 * [Y] 8,9 [I] 5,6,13-15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.