EP3463974 - BACK REST PANEL AND METHOD FOR PRODUCING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 04.09.2020 | ||
Former | Grant of patent is intended Status updated on 05.05.2020 | ||
Former | Request for examination was made Status updated on 08.03.2019 | ||
Former | The international publication has been made Status updated on 08.12.2017 | ||
Former | unknown Status updated on 30.05.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Ford-Werke GmbH Abteilung NH-364 Henry-Ford-Strasse 1 50735 Köln / DE | [2019/15] | Inventor(s) | 01 /
FORSTHUBER, Gerald Karl-Steiger-Str. 52 4020 Linz / AT | 02 /
JANZEN, Michael Lindelaufstr. 48 51061 Köln / DE | [2019/15] | Representative(s) | Haseltine Lake Kempner LLP Cheapside House 138 Cheapside London EC2V 6BJ / GB | [N/P] |
Former [2020/41] | Haseltine Lake Kempner LLP 138 Cheapside London EC2V 6BJ / GB | ||
Former [2019/15] | Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn London WC1V 7JH / GB | Application number, filing date | 17724314.4 | 13.04.2017 | [2019/15] | WO2017DE100304 | Priority number, date | DE201610109924 | 30.05.2016 Original published format: DE102016109924 | [2019/15] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017206974 | Date: | 07.12.2017 | Language: | DE | [2017/49] | Type: | A1 Application with search report | No.: | EP3463974 | Date: | 10.04.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application. | [2019/15] | Type: | B1 Patent specification | No.: | EP3463974 | Date: | 07.10.2020 | Language: | DE | [2020/41] | Search report(s) | International search report - published on: | EP | 07.12.2017 | Classification | IPC: | B60N2/70, B60N2/58, B60N2/64 | [2019/15] | CPC: |
B60N2/7017 (EP);
B60N2/5875 (EP);
B60N2/643 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SITZLEHNENVERKLEIDUNG UND VERFAHREN ZU DEREN HERSTELLUNG | [2019/15] | English: | BACK REST PANEL AND METHOD FOR PRODUCING SAME | [2019/15] | French: | HABILLAGE DE DOSSIER DE SIÈGE ET SON PROCÉDÉ DE FABRICATION | [2019/15] | Entry into regional phase | 22.11.2018 | National basic fee paid | 22.11.2018 | Designation fee(s) paid | 22.11.2018 | Examination fee paid | Examination procedure | 22.11.2018 | Examination requested [2019/15] | 22.11.2018 | Date on which the examining division has become responsible | 06.05.2019 | Amendment by applicant (claims and/or description) | 06.05.2020 | Communication of intention to grant the patent | 14.08.2020 | Receipt of the translation of the claim(s) | 31.08.2020 | Fee for grant paid | 31.08.2020 | Fee for publishing/printing paid | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Fees paid | Renewal fee | 30.04.2019 | Renewal fee patent year 03 | 29.04.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.04.2017 | AL | 07.10.2020 | CY | 07.10.2020 | CZ | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | ES | 07.10.2020 | FI | 07.10.2020 | HR | 07.10.2020 | IT | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | MK | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | RS | 07.10.2020 | SE | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | SM | 07.10.2020 | TR | 07.10.2020 | BG | 07.01.2021 | NO | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | IE | 13.04.2021 | LU | 13.04.2021 | BE | 30.04.2021 | CH | 30.04.2021 | LI | 30.04.2021 | [2024/29] |
Former [2024/22] | HU | 13.04.2017 | |
AL | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
MK | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2023/33] | HU | 13.04.2017 | |
AL | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2023/30] | AL | 07.10.2020 | |
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/34] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/23] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/21] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/10] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
LU | 13.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
Former [2022/04] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
LU | 13.04.2021 | ||
Former [2021/50] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/48] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
IT | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/45] | AL | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/37] | CZ | 07.10.2020 | |
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/36] | CZ | 07.10.2020 | |
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/35] | CZ | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/33] | ES | 07.10.2020 | |
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/32] | ES | 07.10.2020 | |
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/30] | ES | 07.10.2020 | |
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/28] | ES | 07.10.2020 | |
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/25] | ES | 07.10.2020 | |
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/23] | FI | 07.10.2020 | |
LV | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/22] | FI | 07.10.2020 | |
RS | 07.10.2020 | ||
NO | 07.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/21] | FI | 07.10.2020 | |
PT | 08.02.2021 | ||
Former [2021/20] | FI | 07.10.2020 | Cited in | Examination | US2014291880 |