EP3458143 - IMPROVED FLUID LINE CONNECTOR DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.12.2023 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 30.12.2022 | ||
Former | Grant of patent is intended Status updated on 28.07.2022 | ||
Former | Request for examination was made Status updated on 22.02.2019 | ||
Former | The international publication has been made Status updated on 25.11.2017 | ||
Former | unknown Status updated on 31.05.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Medical Device Creations Limited 146 Allerton Road Mossley Hill, Liverpool L18 2DH / GB | [2019/13] | Inventor(s) | 01 /
JEFFREY, Peter 98 South Mossley Hill Road LIVERPOOL Merseyside L19 9BJ / GB | [2019/13] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [2023/05] |
Former [2019/13] | HGF Limited 4th Floor Merchant Exchange 17-19 Whitworth Street West Manchester M1 5WG / GB | Application number, filing date | 17724885.3 | 15.05.2017 | [2019/13] | WO2017GB51357 | Priority number, date | GB20160008603 | 16.05.2016 Original published format: GB 201608603 | GB20170000096 | 05.01.2017 Original published format: GB 201700096 | [2019/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017199012 | Date: | 23.11.2017 | Language: | EN | [2017/47] | Type: | A1 Application with search report | No.: | EP3458143 | Date: | 27.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.11.2017 takes the place of the publication of the European patent application. | [2019/13] | Type: | B1 Patent specification | No.: | EP3458143 | Date: | 01.02.2023 | Language: | EN | [2023/05] | Search report(s) | International search report - published on: | EP | 23.11.2017 | Classification | IPC: | A61M39/10, A61M39/20 | [2019/13] | CPC: |
A61M39/10 (EP,GB,US);
A61M39/1011 (US);
A61M39/20 (EP,GB,US);
F16L35/00 (GB);
F16L55/115 (GB);
A61M2039/1033 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERBESSERTE FLUIDLEITUNGVERBINDERVORRICHTUNG | [2019/13] | English: | IMPROVED FLUID LINE CONNECTOR DEVICE | [2019/13] | French: | DISPOSITIF DU TYPE RACCORD DE CONDUITE DE FLUIDE AMÉLIORÉ | [2019/13] | Entry into regional phase | 21.11.2018 | National basic fee paid | 21.11.2018 | Designation fee(s) paid | 21.11.2018 | Examination fee paid | Examination procedure | 21.11.2018 | Examination requested [2019/13] | 21.11.2018 | Date on which the examining division has become responsible | 12.07.2019 | Amendment by applicant (claims and/or description) | 29.07.2022 | Communication of intention to grant the patent | 25.11.2022 | Fee for grant paid | 25.11.2022 | Fee for publishing/printing paid | 25.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.11.2023 | No opposition filed within time limit [2024/02] | Fees paid | Renewal fee | 12.11.2019 | Renewal fee patent year 03 | 30.11.2020 | Renewal fee patent year 04 | 30.11.2021 | Renewal fee patent year 05 | 28.11.2022 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 31.05.2019 | 03   M06   Fee paid on   12.11.2019 | 31.05.2020 | 04   M06   Fee paid on   30.11.2020 | 31.05.2021 | 05   M06   Fee paid on   30.11.2021 | 31.05.2022 | 06   M06   Fee paid on   28.11.2022 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.02.2023 | CZ | 01.02.2023 | DK | 01.02.2023 | EE | 01.02.2023 | ES | 01.02.2023 | FI | 01.02.2023 | HR | 01.02.2023 | IT | 01.02.2023 | LT | 01.02.2023 | LV | 01.02.2023 | MC | 01.02.2023 | NL | 01.02.2023 | PL | 01.02.2023 | RO | 01.02.2023 | RS | 01.02.2023 | SE | 01.02.2023 | SI | 01.02.2023 | SK | 01.02.2023 | SM | 01.02.2023 | NO | 01.05.2023 | GR | 02.05.2023 | IE | 15.05.2023 | LU | 15.05.2023 | BE | 31.05.2023 | CH | 31.05.2023 | FR | 31.05.2023 | LI | 31.05.2023 | IS | 01.06.2023 | PT | 01.06.2023 | [2024/26] |
Former [2024/24] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SI | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IE | 15.05.2023 | ||
LU | 15.05.2023 | ||
BE | 31.05.2023 | ||
CH | 31.05.2023 | ||
FR | 31.05.2023 | ||
LI | 31.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2024/21] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SI | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IE | 15.05.2023 | ||
LU | 15.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2024/11] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SI | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
LU | 15.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2024/09] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
LU | 15.05.2023 | ||
CH | 31.05.2023 | ||
LI | 31.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2024/08] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
LU | 15.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/50] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/49] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/48] | AT | 01.02.2023 | |
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/46] | AT | 01.02.2023 | |
DK | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/39] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/38] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/37] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/36] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/35] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
NL | 01.02.2023 | ||
RS | 01.02.2023 | ||
NO | 01.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/34] | ES | 01.02.2023 | |
LT | 01.02.2023 | ||
RS | 01.02.2023 | ||
PT | 01.06.2023 | ||
Former [2023/33] | ES | 01.02.2023 | |
LT | 01.02.2023 | Cited in | International search | [A]US6003556 (BRUGGER JAMES M [US], et al) [A] 1-40,54-61* the whole document *; | [A]US6508807 (PETERS JOSEPH L [GB]) [A] 1-40,54-61 * figures 1-4 * * column 2, line 22 - column 3, line 31 *; | [Y]US2005040648 (SMOLENSKI MARK [US], et al) [Y] 3-10,15-19,22-33,35-40,54-61 * figures 5-19 *; | [XY]WO2005079907 (SHERWOOD SERV AG [CH], et al) [X] 1,2,11-14,20,21,34 * figures 1-3 * * page 2, line 24 - page 4, line 19 * [Y] 3-10,15-19,22-33,35-40,54-61; | [Y]EP2051770 (YOUNG PETER JEFFREY [GB]) [Y] 3-10,15-19,22-33,35-40,54-61 * the whole document * |