EP3464296 - ISOTHIAZOLOPYRIDONES, PROCESSES FOR THEIR PREPARATION AND THEIR USE AS HERBICIDES AND/OR PLANT GROWTH REGULATORS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.08.2021 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 11.09.2020 | ||
Former | Grant of patent is intended Status updated on 25.05.2020 | ||
Former | Request for examination was made Status updated on 08.03.2019 | ||
Former | The international publication has been made Status updated on 08.12.2017 | ||
Former | unknown Status updated on 02.06.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Bayer CropScience Aktiengesellschaft Alfred-Nobel-Strasse 50 40789 Monheim am Rhein / DE | [2019/15] | Inventor(s) | 01 /
REY, Jullien 11 Rue du Monenberg 68510 Sierentz / FR | 02 /
TIEBES, Jörg Am Schwalbenschwanz 25 60431 Frankfurt / DE | 03 /
MOSRIN, Marc Bachemer Strasse 341a 50935 Köln / DE | 04 /
DIETRICH, Hansjörg Bonifatiusstraße 1b 65835 Liederbach am Taunus / DE | 05 /
MACHETTIRA, Anu Bheemaiah Niedernhausener Strasse 47 60326 Frankfurt am Main / DE | 06 /
ROSINGER, Christopher Hugh Am Hochfeld 33 65719 Hofheim / DE | 07 /
GATZWEILER, Elmar Am Nauheimer Bach 22 61231 Bad Nauheim / DE | [2019/15] | Representative(s) | BIP Patents c/o Bayer Intellectual Property GmbH Alfred-Nobel-Straße 50 40789 Monheim am Rhein / DE | [N/P] |
Former [2019/15] | BIP Patents c/o Bayer Intellectual Property GmbH Alfred-Nobel-Straße 10 40789 Monheim am Rhein / DE | Application number, filing date | 17725286.3 | 29.05.2017 | [2019/15] | WO2017EP62844 | Priority number, date | EP20160172609 | 02.06.2016 Original published format: EP 16172609 | [2019/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017207462 | Date: | 07.12.2017 | Language: | EN | [2017/49] | Type: | A1 Application with search report | No.: | EP3464296 | Date: | 10.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application. | [2019/15] | Type: | B1 Patent specification | No.: | EP3464296 | Date: | 14.10.2020 | Language: | EN | [2020/42] | Search report(s) | International search report - published on: | EP | 07.12.2017 | Classification | IPC: | C07D513/04, A01N43/90 | [2019/15] | CPC: |
C07D513/04 (EP,US);
A01N43/90 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ISOTHIAZOLOPYRIDONE, VERFAHREN ZU IHRER HERSTELLUNG UND IHRE VERWENDUNG ALS HERBIZIDE UND/ODER PFLANZENWACHSTUMS-REGULATOREN | [2020/23] | English: | ISOTHIAZOLOPYRIDONES, PROCESSES FOR THEIR PREPARATION AND THEIR USE AS HERBICIDES AND/OR PLANT GROWTH REGULATORS | [2019/15] | French: | ISOTHIAZOLOPYRIDONES, LEURS PROCÉDÉS DE PRÉPARATION ET LEUR UTILISATION COMME HERBICIDES ET/OU RÉGULATEURS DE CROISSANCE VÉGÉTALE | [2020/23] |
Former [2019/15] | ISOTHIAZOLOPYRIDONE, VERFAHREN ZU DEREN HERSTELLUNG UND DEREN VERWENDUNG ALS HERBIZIDE UND/ODER PFLANZENWACHSTUMSREGULATOREN | ||
Former [2019/15] | NOUVELLES ISOTHIAZOLOPYRIDONES, LEURS PROCÉDÉS DE PRÉPARATION ET LEUR UTILISATION EN TANT QU'HERBICIDES ET/OU QUE RÉGULATEURS DE CROISSANCE DES PLANTES | Entry into regional phase | 02.01.2019 | National basic fee paid | 02.01.2019 | Designation fee(s) paid | 02.01.2019 | Examination fee paid | Examination procedure | 02.01.2019 | Examination requested [2019/15] | 02.01.2019 | Date on which the examining division has become responsible | 05.07.2019 | Amendment by applicant (claims and/or description) | 26.05.2020 | Communication of intention to grant the patent | 04.09.2020 | Fee for grant paid | 04.09.2020 | Fee for publishing/printing paid | 04.09.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 15.07.2021 | No opposition filed within time limit [2021/38] | Fees paid | Renewal fee | 15.05.2019 | Renewal fee patent year 03 | 14.05.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.05.2017 | AL | 14.10.2020 | AT | 14.10.2020 | CY | 14.10.2020 | CZ | 14.10.2020 | DK | 14.10.2020 | EE | 14.10.2020 | ES | 14.10.2020 | FI | 14.10.2020 | HR | 14.10.2020 | IT | 14.10.2020 | LT | 14.10.2020 | LV | 14.10.2020 | MC | 14.10.2020 | MK | 14.10.2020 | MT | 14.10.2020 | NL | 14.10.2020 | PL | 14.10.2020 | RO | 14.10.2020 | RS | 14.10.2020 | SE | 14.10.2020 | SI | 14.10.2020 | SK | 14.10.2020 | SM | 14.10.2020 | BG | 14.01.2021 | NO | 14.01.2021 | GR | 15.01.2021 | IS | 14.02.2021 | PT | 15.02.2021 | GB | 29.05.2021 | IE | 29.05.2021 | LU | 29.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | FR | 31.05.2021 | LI | 31.05.2021 | [2024/42] |
Former [2024/22] | HU | 29.05.2017 | |
AL | 14.10.2020 | ||
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
MK | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
GB | 29.05.2021 | ||
IE | 29.05.2021 | ||
LU | 29.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/33] | HU | 29.05.2017 | |
AL | 14.10.2020 | ||
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
GB | 29.05.2021 | ||
IE | 29.05.2021 | ||
LU | 29.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
GB | 29.05.2021 | ||
IE | 29.05.2021 | ||
LU | 29.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
GB | 29.05.2021 | ||
IE | 29.05.2021 | ||
LU | 29.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
GB | 29.05.2021 | ||
IE | 29.05.2021 | ||
LU | 29.05.2021 | ||
CH | 31.05.2021 | ||
FR | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/22] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
PT | 15.02.2021 | ||
GB | 29.05.2021 | ||
IE | 29.05.2021 | ||
LU | 29.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
PT | 15.02.2021 | ||
IE | 29.05.2021 | ||
LU | 29.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
PT | 15.02.2021 | ||
LU | 29.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
LU | 29.05.2021 | ||
Former [2022/07] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/50] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/48] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
IT | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/45] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/37] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/36] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
EE | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/35] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/33] | AT | 14.10.2020 | |
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/32] | AT | 14.10.2020 | |
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/30] | AT | 14.10.2020 | |
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/28] | AT | 14.10.2020 | |
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/25] | AT | 14.10.2020 | |
ES | 14.10.2020 | ||
FI | 14.10.2020 | ||
LV | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/23] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
LV | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
PT | 15.02.2021 | ||
Former [2021/22] | FI | 14.10.2020 | |
RS | 14.10.2020 | ||
NO | 14.01.2021 | ||
PT | 15.02.2021 | ||
Former [2021/21] | FI | 14.10.2020 | |
PT | 15.02.2021 | ||
Former [2021/20] | FI | 14.10.2020 | Cited in | International search | [AD]US3707364 (BECKE FRIEDRICH, et al) [AD] 1-13 * the whole document *; | [AD]US2008227636 (KAISER FLORIAN [DE], et al) [AD] 1-13 * paragraph [0084]; claim 1 *; | [AD]EP2123159 (BAYER CROPSCIENCE AG [DE]) [AD] 1-13* paragraph [0084]; claim 1 * | by applicant | US3707364 | US4631211 | WO9702262 | EP0761654 | WO9849899 | WO9914202 | WO2007014290 | US2008227636 | EP2123159 | US2011201687 | WO2016102420 | WO2016102435 | - TETRAHEDRON, (2001), vol. 51, pages 9697 - 9710 | - S. H. DEWITT, Annual Reports in Combinatorial Chemistry and Molecular Diversity: Automated Synthesis, VERLAG ESCOM, (1997), vol. 1, pages 69 - 77 | - HOUGHTEN ET AL., PROC. NATL. ACAD. SCI, (1985), vol. 82, pages 5131 - 5135 | - WINNACKER-KIICHLER, Chemische Technologie, C. HANSER VERLAG, (1986), vol. 7 | - MCCUTCHEON'S, Detergents and Emulsifiers Annual, MC PUBL. CORP., RIDGEWOOD N.J. | - WINNACKER-KIICHLER, Chemische Technologie, C. HANSER VERLAG MUNICH, (1986), vol. 7 | - "Agglomeration", J.E. BROWNING, Chemical and Engineering, (1967), page 147 | - Perry's Chemical Engineer's Handbook, MCGRAW-HILL, NEW YORK, (1973), pages 8 - 57 | - G.C. KLINGMAN, Weed Control as a Science, JOHN WILEY AND SONS, INC., NEW YORK, (1961), pages 81 - 96 | - J.D. FREYER; S.A. EVANS, Weed Control Handbook, BLACKWELL SCIENTIFIC PUBLICATIONS, OXFORD, (1968), pages 101 - 103 | EP20140199545 | EP20140199548 |