blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3456070

EP3456070 - INCREASE OF SPECTRAL CAPACITY OF EMBMS-CELL WHEN DEPLOYED AS A SUPPLEMENTARY DOWNLINK CARRIER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.01.2022
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  12.02.2021
FormerGrant of patent is intended
Status updated on  28.09.2020
FormerExamination is in progress
Status updated on  18.10.2019
FormerRequest for examination was made
Status updated on  15.02.2019
FormerThe international publication has been made
Status updated on  17.11.2017
Formerunknown
Status updated on  02.06.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Apple Inc.
One Apple Park Way
Cupertino, CA 95014 / US
[2020/52]
Former [2019/12]For all designated states
Intel IP Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
Inventor(s)01 / PANCHAL, Ajay
13986 Caminito Caroline
San Diego, California 92130 / US
02 / CHOI, Hyung-Nam
Amrumer Knick 11
22117 Hamburg HH / DE
03 / BREINING, Birgit
Maxhofstraße 57
81475 Munich BY / DE
 [2019/12]
Representative(s)Lang, Johannes, et al
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2021/11]
Former [2019/12]HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Application number, filing date17725452.111.05.2017
[2019/12]
WO2017US32290
Priority number, dateUS201662335504P12.05.2016         Original published format: US 201662335504 P
[2019/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017197200
Date:16.11.2017
Language:EN
[2017/46]
Type: A1 Application with search report 
No.:EP3456070
Date:20.03.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 16.11.2017 takes the place of the publication of the European patent application.
[2019/12]
Type: B1 Patent specification 
No.:EP3456070
Date:17.03.2021
Language:EN
[2021/11]
Search report(s)International search report - published on:EP16.11.2017
ClassificationIPC:H04W4/20, H04W4/06, H04W72/00
[2020/42]
CPC:
H04W4/203 (EP,US); H04L41/042 (US); H04W4/06 (EP,US);
H04W72/0446 (US); H04W72/30 (EP,US)
Former IPC [2019/12]H04W4/06, H04W72/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/12]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ERHÖHUNG DER SPEKTRALEN KAPAZITÄT VON EMBMS-ZELLEN BEIM EINSATZ ALS ZUSÄTZLICHER DOWNLINK-TRÄGER[2019/12]
English:INCREASE OF SPECTRAL CAPACITY OF EMBMS-CELL WHEN DEPLOYED AS A SUPPLEMENTARY DOWNLINK CARRIER[2019/12]
French:AUGMENTATION DE LA CAPACITÉ SPECTRALE D'UNE CELLULE EMBMS LORSQU'ELLE EST DÉPLOYÉE EN TANT QUE PORTEUSE DE LIAISON DESCENDANTE SUPPLÉMENTAIRE[2019/12]
Entry into regional phase10.10.2018National basic fee paid 
10.10.2018Designation fee(s) paid 
10.10.2018Examination fee paid 
Examination procedure10.10.2018Examination requested  [2019/12]
10.10.2018Date on which the examining division has become responsible
01.07.2019Amendment by applicant (claims and/or description)
17.10.2019Despatch of a communication from the examining division (Time limit: M06)
04.05.2020Reply to a communication from the examining division
22.06.2020Despatch of a communication from the examining division (Time limit: M02)
02.09.2020Reply to a communication from the examining division
28.09.2020Communication of intention to grant the patent
05.02.2021Fee for grant paid
05.02.2021Fee for publishing/printing paid
05.02.2021Receipt of the translation of the claim(s)
Opposition(s)20.12.2021No opposition filed within time limit [2022/08]
Fees paidRenewal fee
15.05.2019Renewal fee patent year 03
31.03.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.05.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
MT17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE11.05.2021
LU11.05.2021
FR17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
[2024/42]
Former [2024/22]HU11.05.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE11.05.2021
LU11.05.2021
FR17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/33]HU11.05.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE11.05.2021
LU11.05.2021
FR17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/30]AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE11.05.2021
LU11.05.2021
FR17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/34]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE11.05.2021
LU11.05.2021
FR17.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/23]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE11.05.2021
LU11.05.2021
FR17.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/21]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE11.05.2021
LU11.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/11]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
LU11.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/10]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU11.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/08]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU11.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/07]AL17.03.2021
AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/52]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/51]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/50]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2021/48]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/46]AT17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/43]FI17.03.2021
HR17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/38]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/37]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/36]FI17.03.2021
HR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/35]FI17.03.2021
HR17.03.2021
NO17.06.2021
Former [2021/33]FI17.03.2021
NO17.06.2021
Cited inInternational search[XI]US2013128765  (YANG YOONOH [KR], et al) [X] 19,25 * paragraph [0002] - paragraph [0005] * * paragraph [0062] - paragraph [0071] * * paragraph [0120] - paragraph [0125]; figure 12 * [I] 20-24;
 [XAY]  - ZTE, "Consideration on increasing number of MBSFN subframes", vol. RAN WG1, no. Nanjing, China; 20160523 - 20160527, (20160511), 3GPP DRAFT; R1-164306 - CONSIDER INCREASING NUM OF MBSFN SUBFRAMES, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRA, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_85/Docs/, (20160511), XP051096936 [X] 1,2,7,8,13,14 * the whole document * [A] 25 [Y] 4,6,10,12,16,18
 [XAY]  - ERICSSON, "Standalone eMBMS carrier", vol. RAN WG1, no. Busan, Korea; 20160411 - 20160415, (20160402), 3GPP DRAFT; R1-163290 STANDALONE MBSFN CARRIER, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84b/Docs/, (20160402), XP051080604 [X] 1-3,5,7-9,11,13-15,17 * the whole document * [A] 25 [Y] 4,6,10,12,16,18
 [Y]  - ETSI MCC, "Draft Report of 3GPP TSG RAN WG2 meeting #70bis - R2-104221", 3GPP TSG-RAN WORKING GROUP 2 MEETING #71 - R2-104221, (20100823), pages 1 - 138, XP055147858 [Y] 4,10,16 * page 87, line 30 - page 88, line 13 *
 [Y]  - ERICSSON, "Work plan for eMBMS enhancements in LTE", vol. RAN WG3, no. Bangalore, India; 20160411 - 20160415, (20160402), 3GPP DRAFT; R3-160857, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG3_Iu/TSGR3_91bis/Docs/, (20160402), XP051083076 [Y] 6,12,18 * the whole document *
 [A]  - 3gpp, "3GPP TS 36.300 V13.3.0 Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 13)", (20160401), pages 137 - 158, URL: http://www.3gpp.org/ftp/Specs/archive/36_series/36.300/36300-d30.zip, (20170808), XP055396976 [A] 1-25 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.