EP3464434 - FLAME RETARDANT SEMI-RIGID POLYURETHANE FOAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2021 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 06.11.2020 | ||
Former | Grant of patent is intended Status updated on 22.06.2020 | ||
Former | Request for examination was made Status updated on 08.03.2019 | ||
Former | The international publication has been made Status updated on 08.12.2017 | ||
Former | unknown Status updated on 21.06.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Dow Global Technologies LLC 2040 Dow Center Midland, MI 48674 / US | [2020/16] |
Former [2019/15] | For all designated states Dow Global Technologies, LLC 2040 Dow Center Midland, MI 48674 / US | Inventor(s) | 01 /
GUIDETTI, Giuliano Via Carpi 29 42015 Correggio / IT | 02 /
FREGNI, Sabrina Via Carpi 29 42015 Correggio / IT | [2019/15] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2020/50] |
Former [2019/15] | Boult Wade Tennant LLP Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 17729262.0 | 23.05.2017 | [2019/15] | WO2017US34016 | Priority number, date | IT2016UB03911 | 30.05.2016 Original published format: IT UB20163911 | [2019/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017210022 | Date: | 07.12.2017 | Language: | EN | [2017/49] | Type: | A1 Application with search report | No.: | EP3464434 | Date: | 10.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application. | [2019/15] | Type: | B1 Patent specification | No.: | EP3464434 | Date: | 09.12.2020 | Language: | EN | [2020/50] | Search report(s) | International search report - published on: | EP | 07.12.2017 | Classification | IPC: | C08J9/00, C08G18/28, C08G18/32 | [2019/15] | CPC: |
C08J9/0038 (EP);
C08G18/4816 (EP);
C08G18/4829 (EP);
C08G18/4841 (EP);
C08G18/7664 (EP);
C08J9/0066 (EP);
C08K5/521 (EP);
C08G2110/0016 (EP);
C08G2110/005 (EP);
C08G2350/00 (EP);
C08J2205/05 (EP);
C08J2205/08 (EP);
C08J2375/04 (EP)
(-)
| C-Set: |
C08K5/521, C08L75/08 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FLAMMHEMMENDER HALBHARTER POLYURETHANSCHAUM | [2019/15] | English: | FLAME RETARDANT SEMI-RIGID POLYURETHANE FOAM | [2019/15] | French: | MOUSSE DE POLYURÉTHANE SEMI-RIGIDE IGNIFUGEANTE | [2019/15] | Entry into regional phase | 20.12.2018 | National basic fee paid | 20.12.2018 | Designation fee(s) paid | 20.12.2018 | Examination fee paid | Examination procedure | 21.12.2018 | Examination requested [2019/15] | 21.12.2018 | Date on which the examining division has become responsible | 26.07.2019 | Amendment by applicant (claims and/or description) | 23.06.2020 | Communication of intention to grant the patent | 28.10.2020 | Fee for grant paid | 28.10.2020 | Fee for publishing/printing paid | 28.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 10.09.2021 | No opposition filed within time limit [2021/46] | Fees paid | Renewal fee | 15.05.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.05.2017 | AL | 09.12.2020 | AT | 09.12.2020 | CY | 09.12.2020 | CZ | 09.12.2020 | DK | 09.12.2020 | EE | 09.12.2020 | ES | 09.12.2020 | FI | 09.12.2020 | HR | 09.12.2020 | IT | 09.12.2020 | LT | 09.12.2020 | LV | 09.12.2020 | MC | 09.12.2020 | MK | 09.12.2020 | MT | 09.12.2020 | NL | 09.12.2020 | PL | 09.12.2020 | RO | 09.12.2020 | RS | 09.12.2020 | SE | 09.12.2020 | SI | 09.12.2020 | SK | 09.12.2020 | SM | 09.12.2020 | TR | 09.12.2020 | BG | 09.03.2021 | NO | 09.03.2021 | GR | 10.03.2021 | IS | 09.04.2021 | PT | 09.04.2021 | IE | 23.05.2021 | LU | 23.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/42] |
Former [2024/29] | HU | 23.05.2017 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
MK | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
TR | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 23.05.2021 | ||
LU | 23.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2024/22] | HU | 23.05.2017 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
MK | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 23.05.2021 | ||
LU | 23.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/33] | HU | 23.05.2017 | |
AL | 09.12.2020 | ||
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 23.05.2021 | ||
LU | 23.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 23.05.2021 | ||
LU | 23.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 23.05.2021 | ||
LU | 23.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
IE | 23.05.2021 | ||
LU | 23.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
IE | 23.05.2021 | ||
LU | 23.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
LU | 23.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/08] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
ES | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
LU | 23.05.2021 | ||
Former [2022/07] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/49] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/48] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
IT | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/45] | AL | 09.12.2020 | |
AT | 09.12.2020 | ||
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/42] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/39] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
PL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/37] | AT | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/36] | CZ | 09.12.2020 | |
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/35] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/33] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/32] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/30] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/28] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/23] | FI | 09.12.2020 | |
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/22] | FI | 09.12.2020 | |
RS | 09.12.2020 | ||
NO | 09.03.2021 | ||
Former [2021/20] | FI | 09.12.2020 | Cited in | International search | [A]WO0035999 (DOW CHEMICAL CO [US], et al) [A] 1-12* claim - *; | [Y]US2011184079 (MILLIREN CHARLES M [US], et al) [Y] 10,11 * claims 14,15 *; | [XY]WO2011127028 (ALBEMARLE CORP [US], et al) [X] 1-9,12 * page 2, lines 24-26 * * page 9, lines 8-12 * * page 10, lines 26-31 * * page 11, lines 8-17 * * page 15; tables 3,4 * * claim - * [Y] 10,11; | [A]US2011319572 (CASATI FRANCOIS M [CH], et al) [A] 1-12 * paragraphs [0015] , [0021] , [0051] , [0062] * * claim - * | by applicant | US2846408 | US3215652 | US4394491 | US6552098 | US2003130365 | US6765034 |