EP3456075 - METHOD OF MANAGING A SECURE ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.04.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 01.05.2020 | ||
Former | Grant of patent is intended Status updated on 21.01.2020 | ||
Former | Request for examination was made Status updated on 15.02.2019 | ||
Former | The international publication has been made Status updated on 20.01.2018 | ||
Former | unknown Status updated on 23.06.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Thales Dis France SA 6, rue de la Verrerie 92190 Meudon / FR | [2019/36] |
Former [2019/12] | For all designated states Gemalto SA 6, rue de la Verrerie 92190 Meudon / FR | Inventor(s) | 01 /
COURTIADE, Fabien c/o GEMALTO SA Intellectual Property Department - 525 Avenue du Pic de Bertagne - CS12023 13881 GEMENOS Cedex / FR | 02 /
ZAITI, Reda c/o GEMALTO SA Intellectual Property Department - 525 Avenue du Pic de Bertagne - CS12023 13881 GEMENOS Cedex / FR | [2019/12] | Representative(s) | Grevin, Emmanuel Thales Dis France SAS Intellectual Property Department 525, avenue du Pic de Bertagne CS12023 13881 Gémenos Cedex / FR | [N/P] |
Former [2020/23] | Grevin, Emmanuel Thales Dis France SA Intellectual Property Department 525, avenue du Pic de Bertagne CS12023 13881 Gémenos Cedex / FR | ||
Former [2019/12] | Grevin, Emmanuel Gemalto SA 525 avenue du Pic de Bertagne CS 12023 13881 Gemenos Cedex / FR | Application number, filing date | 17729872.6 | 14.06.2017 | [2019/12] | WO2017EP64498 | Priority number, date | EP20160305906 | 13.07.2016 Original published format: EP 16305906 | [2019/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018010904 | Date: | 18.01.2018 | Language: | EN | [2018/03] | Type: | A1 Application with search report | No.: | EP3456075 | Date: | 20.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.01.2018 takes the place of the publication of the European patent application. | [2019/12] | Type: | B1 Patent specification | No.: | EP3456075 | Date: | 03.06.2020 | Language: | EN | [2020/23] | Search report(s) | International search report - published on: | EP | 18.01.2018 | Classification | IPC: | H04W12/10, H04W12/06, H04W4/80, H04W4/00, H04B1/3816 | [2020/02] | CPC: |
H04W4/80 (EP,KR,US);
H04W12/47 (EP,KR,US);
G06F21/74 (KR,US);
G06F21/44 (KR,US);
G06F21/77 (KR,US);
H04W12/00 (US);
|
Former IPC [2019/12] | H04W12/10, H04W4/00, H04B1/3816 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR VERWALTUNG EINES SICHEREN ELEMENTS | [2019/12] | English: | METHOD OF MANAGING A SECURE ELEMENT | [2019/12] | French: | PROCÉDÉ DE GESTION D'UN ÉLÉMENT SÉCURISÉ | [2019/12] | Entry into regional phase | 12.12.2018 | National basic fee paid | 12.12.2018 | Designation fee(s) paid | 12.12.2018 | Examination fee paid | Examination procedure | 12.12.2018 | Examination requested [2019/12] | 12.12.2018 | Date on which the examining division has become responsible | 22.01.2020 | Communication of intention to grant the patent | 23.04.2020 | Fee for grant paid | 23.04.2020 | Fee for publishing/printing paid | 23.04.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 04.03.2021 | No opposition filed within time limit [2021/19] | Fees paid | Renewal fee | 21.06.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.06.2017 | AL | 03.06.2020 | AT | 03.06.2020 | CY | 03.06.2020 | CZ | 03.06.2020 | DK | 03.06.2020 | EE | 03.06.2020 | ES | 03.06.2020 | FI | 03.06.2020 | HR | 03.06.2020 | LT | 03.06.2020 | LV | 03.06.2020 | MC | 03.06.2020 | MK | 03.06.2020 | MT | 03.06.2020 | NL | 03.06.2020 | PL | 03.06.2020 | RO | 03.06.2020 | RS | 03.06.2020 | SE | 03.06.2020 | SI | 03.06.2020 | SK | 03.06.2020 | SM | 03.06.2020 | TR | 03.06.2020 | IE | 14.06.2020 | LU | 14.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | BG | 03.09.2020 | NO | 03.09.2020 | GR | 04.09.2020 | IS | 03.10.2020 | PT | 06.10.2020 | [2022/33] |
Former [2022/27] | HU | 14.06.2017 | |
AL | 03.06.2020 | ||
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
MT | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
TR | 03.06.2020 | ||
IE | 14.06.2020 | ||
LU | 14.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/24] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
IE | 14.06.2020 | ||
LU | 14.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/20] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
IE | 14.06.2020 | ||
LU | 14.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/18] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
LU | 14.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/15] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
LU | 14.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/10] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/09] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
PT | 06.10.2020 | ||
Former [2021/04] | AL | 03.06.2020 | |
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2021/01] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/51] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/50] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/48] | FI | 03.06.2020 | |
LT | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
Former [2020/47] | LT | 03.06.2020 | |
NO | 03.09.2020 | Cited in | International search | [A]US2012096547 (BARAU EMMANUEL [FR], et al) [A] 1-13 * paragraph [0056] - paragraph [0079] *; | [A]US8429409 (WALL JONATHAN [US], et al) [A] 1-13* column 1, line 24 - column 2, line 25 *; | [A]EP2608478 (GEMALTO SA [FR]) [A] 1-13 * paragraph [0001] - paragraph [0013] * * paragraph [0021] - paragraph [0034] * * figure 2 * |