EP3468489 - TOOL FOR CUTTING BONE FOR SURGICAL USE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 31.03.2021 | ||
Former | Request for examination was made Status updated on 15.03.2019 | ||
Former | The international publication has been made Status updated on 28.12.2017 | ||
Former | unknown Status updated on 05.07.2017 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Razor Medical Instruments, Inc. 225 Central Drive Briarcliff Manor, NY 10510 / US | [2022/08] |
Former [2019/16] | For all designated states Razor Medical Instruments LLC 225 Central Drive Briarcliff Manor, New York 10510 / US | Inventor(s) | 01 /
KHALILI, Farid Bruce 225 Central Drive Briarcliff Manor, New York 10510 / US | [2019/16] | Representative(s) | Richards, John, et al Ladas & Parry LLP Temple Chambers 3-7 Temple Avenue London EC4Y 0DA / GB | [2019/16] | Application number, filing date | 17732690.7 | 13.06.2017 | [2019/16] | WO2017US37327 | Priority number, date | US201662350177P | 14.06.2016 Original published format: US 201662350177 P | [2019/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017218589 | Date: | 21.12.2017 | Language: | EN | [2017/51] | Type: | A1 Application with search report | No.: | EP3468489 | Date: | 17.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.12.2017 takes the place of the publication of the European patent application. | [2019/16] | Type: | B1 Patent specification | No.: | EP3468489 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | International search report - published on: | EP | 21.12.2017 | Classification | IPC: | A61B17/16 | [2019/16] | CPC: |
A61B17/1666 (EP,US);
A61B17/1693 (US);
A61F2/28 (US);
A61B17/1635 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | WERKZEUG ZUM SCHNEIDEN VON KNOCHEN FÜR CHIRURGISCHE ZWECKE | [2019/16] | English: | TOOL FOR CUTTING BONE FOR SURGICAL USE | [2019/16] | French: | OUTIL DE DÉCOUPE D'OS DESTINÉ À UNE UTILISATION CHIRURGICALE | [2019/16] | Entry into regional phase | 04.01.2019 | National basic fee paid | 04.01.2019 | Designation fee(s) paid | 04.01.2019 | Examination fee paid | Examination procedure | 11.12.2018 | Amendment by applicant (claims and/or description) | 04.01.2019 | Examination requested [2019/16] | 04.01.2019 | Date on which the examining division has become responsible | 01.04.2021 | Communication of intention to grant the patent | 21.07.2021 | Fee for grant paid | 21.07.2021 | Fee for publishing/printing paid | 21.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 | 29.06.2020 | Renewal fee patent year 04 | 29.06.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.06.2017 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | MT | 01.09.2021 | NL | 01.09.2021 | PL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | [2024/44] |
Former [2024/22] | HU | 13.06.2017 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2024/20] | HU | 13.06.2017 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2024/18] | HU | 13.06.2017 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/08] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Cited in | International search | [A]US3633583 (FISHBEIN MEYER) [A] 1 * the whole document *; | [A]DE102005031402 (PLUS ORTHOPEDICS AG [CH]) [A] 1* paragraph [0050]; figures 1-3 *; | [A]US7837686 (TULKIS PETER [US]) [A] 1 * figures 1-3 * |