| EP3632014 - SYSTEMS AND METHODS FOR WIRELESS TRANSMISSION OF BI-DIRECTIONAL TRAFFIC [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2024 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 10.11.2023 | ||
| Former | Grant of patent is intended Status updated on 17.08.2023 | ||
| Former | Examination is in progress Status updated on 09.07.2021 | ||
| Former | Request for examination was made Status updated on 06.03.2020 | ||
| Former | The international publication has been made Status updated on 04.01.2019 | ||
| Former | unknown Status updated on 14.07.2017 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/15] | Inventor(s) | 01 /
HENCINSKI, Oren c/o Huawei Technologies Duesseldorf GmbH Riesstr. 25 80992 Munich / DE | 02 /
LIANG, Haixiang c/o Huawei Technologies Duesseldorf GmbH Riesstr. 25 80992 Munich / DE | 03 /
LV, Jie c/o Huawei Technologies Duesseldorf GmbH Riesstr. 25 80992 Munich / DE | [2020/15] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Straße 29 80336 München / DE | [N/P] |
| Former [2020/15] | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | Application number, filing date | 17735071.7 | 28.06.2017 | [2020/15] | WO2017EP65945 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019001695 | Date: | 03.01.2019 | Language: | EN | [2019/01] | Type: | A1 Application with search report | No.: | EP3632014 | Date: | 08.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.01.2019 takes the place of the publication of the European patent application. | [2020/15] | Type: | B1 Patent specification | No.: | EP3632014 | Date: | 13.12.2023 | Language: | EN | [2023/50] | Search report(s) | International search report - published on: | EP | 03.01.2019 | Classification | IPC: | H04L1/00, H04L1/1829, H04L5/00, H04L5/14 | [2023/33] | CPC: |
H04L1/1861 (EP);
H04L5/1461 (US);
H04B7/15557 (US);
H04L12/4641 (US);
H04L5/0055 (EP);
H04L5/14 (EP);
H04L2001/0097 (EP)
(-)
|
| Former IPC [2020/15] | H04L1/00, H04L1/18, H04L5/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEME UND VERFAHREN ZUR DRAHTLOSEN ÜBERTRAGUNG VON BIDIREKTIONALEM VERKEHR | [2020/15] | English: | SYSTEMS AND METHODS FOR WIRELESS TRANSMISSION OF BI-DIRECTIONAL TRAFFIC | [2020/15] | French: | SYSTÈMES ET PROCÉDÉS DE TRANSMISSION SANS FIL DE TRAFIC BIDIRECTIONNEL | [2020/15] | Entry into regional phase | 02.01.2020 | National basic fee paid | 02.01.2020 | Designation fee(s) paid | 02.01.2020 | Examination fee paid | Examination procedure | 21.12.2019 | Amendment by applicant (claims and/or description) | 02.01.2020 | Examination requested [2020/15] | 02.01.2020 | Date on which the examining division has become responsible | 13.07.2021 | Despatch of a communication from the examining division (Time limit: M02) | 20.09.2021 | Reply to a communication from the examining division | 13.04.2023 | Despatch of a communication from the examining division (Time limit: M06) | 30.06.2023 | Reply to a communication from the examining division | 18.08.2023 | Communication of intention to grant the patent | 06.11.2023 | Fee for grant paid | 06.11.2023 | Fee for publishing/printing paid | 06.11.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 16.09.2024 | No opposition filed within time limit [2024/47] | Fees paid | Renewal fee | 02.01.2020 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 | 30.06.2021 | Renewal fee patent year 05 | 31.03.2022 | Renewal fee patent year 06 | 31.03.2023 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 28.06.2017 | HU | 28.06.2017 | AT | 13.12.2023 | CZ | 13.12.2023 | DK | 13.12.2023 | EE | 13.12.2023 | ES | 13.12.2023 | FI | 13.12.2023 | HR | 13.12.2023 | IT | 13.12.2023 | LT | 13.12.2023 | LV | 13.12.2023 | MC | 13.12.2023 | NL | 13.12.2023 | PL | 13.12.2023 | RO | 13.12.2023 | RS | 13.12.2023 | SE | 13.12.2023 | SI | 13.12.2023 | SK | 13.12.2023 | SM | 13.12.2023 | BG | 13.03.2024 | NO | 13.03.2024 | GR | 14.03.2024 | IS | 13.04.2024 | PT | 15.04.2024 | GB | 28.06.2024 | IE | 28.06.2024 | LU | 28.06.2024 | BE | 30.06.2024 | CH | 30.06.2024 | FR | 30.06.2024 | [2026/16] |
| Former [2025/51] | CY | 28.06.2017 | |
| AT | 13.12.2023 | ||
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| FI | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| MC | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SI | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| GB | 28.06.2024 | ||
| IE | 28.06.2024 | ||
| LU | 28.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| FR | 30.06.2024 | ||
| Former [2025/45] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| FI | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| MC | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SI | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| GB | 28.06.2024 | ||
| IE | 28.06.2024 | ||
| LU | 28.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| FR | 30.06.2024 | ||
| Former [2025/23] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| MC | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SI | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| GB | 28.06.2024 | ||
| IE | 28.06.2024 | ||
| LU | 28.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| FR | 30.06.2024 | ||
| Former [2025/22] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| MC | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SI | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| IE | 28.06.2024 | ||
| LU | 28.06.2024 | ||
| BE | 30.06.2024 | ||
| CH | 30.06.2024 | ||
| Former [2025/13] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| MC | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SI | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| LU | 28.06.2024 | ||
| Former [2025/11] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| MC | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SI | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| Former [2024/49] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SI | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| Former [2024/47] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| DK | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| Former [2024/36] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| IT | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| PL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SK | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| PT | 15.04.2024 | ||
| Former [2024/35] | AT | 13.12.2023 | |
| CZ | 13.12.2023 | ||
| EE | 13.12.2023 | ||
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| RO | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| Former [2024/34] | EE | 13.12.2023 | |
| ES | 13.12.2023 | ||
| HR | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| Former [2024/33] | ES | 13.12.2023 | |
| HR | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| SM | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| Former [2024/32] | ES | 13.12.2023 | |
| HR | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| IS | 13.04.2024 | ||
| Former [2024/26] | ES | 13.12.2023 | |
| HR | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| LV | 13.12.2023 | ||
| NL | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| Former [2024/24] | ES | 13.12.2023 | |
| HR | 13.12.2023 | ||
| LT | 13.12.2023 | ||
| RS | 13.12.2023 | ||
| SE | 13.12.2023 | ||
| BG | 13.03.2024 | ||
| NO | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| Former [2024/21] | LT | 13.12.2023 | |
| BG | 13.03.2024 | ||
| GR | 14.03.2024 | ||
| Former [2024/20] | GR | 14.03.2024 | Cited in | International search | [XYI] US2011243070 (DOPPLER KLAUS et al.) [X] 1-4,7,10,12-14 * figures 4, 8, 10 * * paragraph [0035] - paragraph [0040] * * paragraph [0056] - paragraph [0069] * * paragraph [0071] *[Y] 5,6,8,9 [I] 11 | [X] US2011211523 (SEO HAN BYUL et al.) [X] 1,3,4,7,14 * figures 6-10, 13 * * paragraph [0052] - paragraph [0062] * * paragraph [0074] - paragraph [0078] * | [Y] US2014169261 (MING JIA et al.) [Y] 5 * figure 4 * * paragraph [0032] - paragraph [0033] * | [Y] US2009154356 (WIEMANN HENNING et al.) [Y] 6,8,9 * figures 2, 5 * * paragraph [0003] * * paragraph [0005] - paragraph [0009] * | [A] US2015117467 (LEUNG WAN CHUN et al.) [A] 11 * paragraph [0033] * |