EP3488128 - SEAL ELEMENT FOR CONNECTING A FIRST COMPONENT AND A SECOND COMPONENT IN A FLUID-TIGHT AND ELECTRICALLY CONDUCTIVE MANNER, AND CORRESPONDING COMPONENT ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.11.2020 Database last updated on 11.01.2025 | |
Former | The patent has been granted Status updated on 05.12.2019 | ||
Former | Grant of patent is intended Status updated on 16.09.2019 | ||
Former | Request for examination was made Status updated on 26.04.2019 | ||
Former | The international publication has been made Status updated on 03.02.2018 | ||
Former | unknown Status updated on 21.07.2017 | Most recent event Tooltip | 08.09.2023 | Lapse of the patent in a contracting state New state(s): SI | published on 11.10.2023 [2023/41] | Applicant(s) | For all designated states AUDI AG Auto-Union-Strasse 1 85045 Ingolstadt / DE | [2019/22] | Inventor(s) | 01 /
WEGSCHEIDER, Roland Am Kindergarten 14 84048 Mainburg / DE | 02 /
HENSEL, Manfred Feuchterstrasse 24 90530 Wendelstein / DE | [2019/22] | Application number, filing date | 17737475.8 | 27.06.2017 | [2019/22] | WO2017EP00752 | Priority number, date | DE201610213600 | 25.07.2016 Original published format: DE102016213600 | [2019/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018019400 | Date: | 01.02.2018 | Language: | DE | [2018/05] | Type: | A1 Application with search report | No.: | EP3488128 | Date: | 29.05.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 01.02.2018 takes the place of the publication of the European patent application. | [2019/22] | Type: | B1 Patent specification | No.: | EP3488128 | Date: | 01.01.2020 | Language: | DE | [2020/01] | Search report(s) | International search report - published on: | EP | 01.02.2018 | Classification | IPC: | F16J15/06, H05K9/00 | [2019/22] | CPC: |
F16J15/064 (EP,US);
H01R4/48 (US);
H05K9/0018 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | DICHTUNGSELEMENT ZUR FLUIDDICHTEN UND ELEKTRISCH LEITENDEN VERBINDUNG EINES ERSTEN BAUTEILS UND EINES ZWEITEN BAUTEILS SOWIE ENTSPRECHENDE BAUTEILANORDNUNG | [2019/22] | English: | SEAL ELEMENT FOR CONNECTING A FIRST COMPONENT AND A SECOND COMPONENT IN A FLUID-TIGHT AND ELECTRICALLY CONDUCTIVE MANNER, AND CORRESPONDING COMPONENT ASSEMBLY | [2019/22] | French: | ÉLÉMENT D'ÉTANCHÉITÉ POUR LA LIAISON ÉTANCHE AU FLUIDE ET ÉLECTRO-CONDUCTRICE D'UNE PREMIÈRE PIÈCE ET D'UNE DEUXIÈME PIÈCE, AINSI QU'ENSEMBLE CORRESPONDANT DE PIÈCES | [2019/22] | Entry into regional phase | 25.02.2019 | National basic fee paid | 25.02.2019 | Designation fee(s) paid | 25.02.2019 | Examination fee paid | Examination procedure | 25.02.2019 | Examination requested [2019/22] | 25.02.2019 | Date on which the examining division has become responsible | 17.09.2019 | Communication of intention to grant the patent | 21.11.2019 | Fee for grant paid | 21.11.2019 | Fee for publishing/printing paid | 21.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 02.10.2020 | No opposition filed within time limit [2020/50] | Fees paid | Renewal fee | 01.07.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.06.2017 | AL | 01.01.2020 | CY | 01.01.2020 | CZ | 01.01.2020 | DK | 01.01.2020 | EE | 01.01.2020 | ES | 01.01.2020 | FI | 01.01.2020 | HR | 01.01.2020 | IT | 01.01.2020 | LT | 01.01.2020 | LV | 01.01.2020 | MC | 01.01.2020 | MK | 01.01.2020 | MT | 01.01.2020 | NL | 01.01.2020 | PL | 01.01.2020 | RO | 01.01.2020 | RS | 01.01.2020 | SE | 01.01.2020 | SI | 01.01.2020 | SK | 01.01.2020 | SM | 01.01.2020 | TR | 01.01.2020 | BG | 01.04.2020 | NO | 01.04.2020 | GR | 02.04.2020 | IS | 01.05.2020 | PT | 27.05.2020 | IE | 27.06.2020 | LU | 27.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | [2023/41] |
Former [2022/31] | HU | 27.06.2017 | |
AL | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MK | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2022/30] | HU | 27.06.2017 | |
AL | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2022/27] | HU | 27.06.2017 | |
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/24] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/20] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
IE | 27.06.2020 | ||
LU | 27.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
Former [2021/15] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
LU | 27.06.2020 | ||
Former [2021/10] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/50] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/49] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/48] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/47] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/40] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/39] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/38] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/37] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/35] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
NO | 01.04.2020 | ||
Former [2020/33] | NL | 01.01.2020 | Cited in | International search | [A]DE7437558U (SIEMENS AG) [A] 1-10 * claims 1-9 ** figures 1-5 *; | [A]US4864076 (STICKNEY WILLIAM H [US]) [A] 1-10 * column 3, line 67 - column 4, line 61 * * figures 1-17 *; | [A]GB2285448 (H R SMITH [GB]) [A] 1-10 * page 8, line 13 - page 10, line 9 * * page 11, line 21 - page 13, line 3 * * page 14, lines 10-11 * * figures 1-6 * | by applicant | DE4340108 |