EP3481462 - CONTRAST HEATING SYSTEM WITH IN-LINE CONTRAST WARMER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 01.01.2025 | |
Former | The patent has been granted Status updated on 19.02.2021 | ||
Former | Grant of patent is intended Status updated on 19.10.2020 | ||
Former | Examination is in progress Status updated on 10.03.2020 | ||
Former | Request for examination was made Status updated on 12.04.2019 | ||
Former | The international publication has been made Status updated on 12.01.2018 | ||
Former | unknown Status updated on 27.07.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Bayer Healthcare LLC 100 Bayer Boulevard P.O. Box 915 Whippany, NJ 07981 / US | [2019/20] | Inventor(s) | 01 /
UBER, III, Arthur, E. 7426 Ben Hur Street Pittsburgh, PA 15208 / US | 02 /
BINGAMAN, Molly 9076 Willoughby Road McCandless, PA 15237 / US | 03 /
CALLAN, Gerald 108 Hunter Drive Cranberry Twp., PA 16066 / US | 04 /
COWAN, Kevin 4242 Estates Court Allison Park, PA 15101 / US | 05 /
JEROME, Genevieve 178 Ulysses Street Pittsburgh, PA 15211 / US | 06 /
LEROCH, Matthew 5015 Carlyn Drive Pittsburgh, PA 15236 / US | 07 /
MOORE, Daniel 187 38th Street Pittsburgh, PA 15201 / US | 08 /
SCHRIVER, Ralph 1832 Bakerstown Road Tarentum, PA 15084 / US | 09 /
SPOHN, Michael, A. 2814 Old Route 422 East Fenelton, PA 16034 / US | 10 /
SWANTNER, Michael, J. 145 Knoch Rd Saxonburg, PA 16056 / US | 11 /
TUCKER, Barry, L. 219 McGregor Drive Verona, PA 15147 / US | [2019/20] | Representative(s) | BIP Patents c/o Bayer Intellectual Property GmbH Alfred-Nobel-Straße 50 40789 Monheim am Rhein / DE | [N/P] |
Former [2019/20] | BIP Patents c/o Bayer Intellectual Property GmbH Alfred-Nobel-Straße 10 40789 Monheim am Rhein / DE | Application number, filing date | 17740228.6 | 05.07.2017 | [2019/20] | WO2017US40651 | Priority number, date | US201662359056P | 06.07.2016 Original published format: US 201662359056 P | [2019/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018009498 | Date: | 11.01.2018 | Language: | EN | [2018/02] | Type: | A1 Application with search report | No.: | EP3481462 | Date: | 15.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.01.2018 takes the place of the publication of the European patent application. | [2019/20] | Type: | B1 Patent specification | No.: | EP3481462 | Date: | 24.03.2021 | Language: | EN | [2021/12] | Search report(s) | International search report - published on: | EP | 11.01.2018 | Classification | IPC: | A61M5/145 | [2019/20] | CPC: |
A61M5/14546 (EP,US);
A61M5/14566 (EP,US);
A61M5/44 (US);
A61M2005/14553 (EP,US);
A61M2205/35 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KONTRASTERWÄRMUNGSSYSTEM MIT INLINE-KONTRASTERWÄRMER | [2019/20] | English: | CONTRAST HEATING SYSTEM WITH IN-LINE CONTRAST WARMER | [2019/20] | French: | SYSTÈME DE CHAUFFAGE À CONTRASTE AVEC DISPOSITIF DE CHAUFFAGE À CONTRASTE EN LIGNE | [2019/20] | Entry into regional phase | 06.02.2019 | National basic fee paid | 06.02.2019 | Designation fee(s) paid | 06.02.2019 | Examination fee paid | Examination procedure | 06.02.2019 | Examination requested [2019/20] | 06.02.2019 | Date on which the examining division has become responsible | 20.08.2019 | Amendment by applicant (claims and/or description) | 13.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 07.07.2020 | Reply to a communication from the examining division | 20.10.2020 | Communication of intention to grant the patent | 15.02.2021 | Fee for grant paid | 15.02.2021 | Fee for publishing/printing paid | 15.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 15.07.2019 | Renewal fee patent year 03 | 14.07.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.07.2017 | AL | 24.03.2021 | CY | 24.03.2021 | CZ | 24.03.2021 | DK | 24.03.2021 | EE | 24.03.2021 | ES | 24.03.2021 | FI | 24.03.2021 | HR | 24.03.2021 | LT | 24.03.2021 | LV | 24.03.2021 | MC | 24.03.2021 | MK | 24.03.2021 | MT | 24.03.2021 | NL | 24.03.2021 | PL | 24.03.2021 | RO | 24.03.2021 | RS | 24.03.2021 | SE | 24.03.2021 | SI | 24.03.2021 | SK | 24.03.2021 | SM | 24.03.2021 | BG | 24.06.2021 | NO | 24.06.2021 | GR | 25.06.2021 | IE | 05.07.2021 | LU | 05.07.2021 | IS | 24.07.2021 | PT | 26.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | [2024/42] |
Former [2024/22] | HU | 05.07.2017 | |
AL | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
MK | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/33] | HU | 05.07.2017 | |
AL | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/30] | AL | 24.03.2021 | |
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/35] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IE | 05.07.2021 | ||
LU | 05.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/34] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
LU | 05.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/23] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
LU | 05.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/21] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 24.12.2021 | ||
Former [2022/18] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 24.12.2021 | ||
Former [2022/13] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 24.12.2021 | ||
Former [2022/10] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 24.12.2021 | ||
Former [2022/08] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/07] | AL | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/52] | CZ | 24.03.2021 | |
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/51] | CZ | 24.03.2021 | |
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/50] | CZ | 24.03.2021 | |
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
Former [2021/48] | CZ | 24.03.2021 | |
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/46] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/43] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/38] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/37] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/36] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/35] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
NO | 24.06.2021 | ||
Former [2021/33] | FI | 24.03.2021 | |
NO | 24.06.2021 | Cited in | International search | [Y]WO9822168 (LIEBEL FLARSHEIM CO [US]) [Y] 1-20 * page 41, line 18 - page 42, line 15; figure 8 *; | [XY]WO2006108026 (MALLINCKRODT INC [US], et al) [X] 1,17 * page 36, line 40 - line 41; figures 5A,5B; claims 7-10, 68 * [Y] 2-16,18-20; | [Y]WO2007021746 (THERMACORE TECHNOLOGIES INC [US], et al) [Y] 1-20 * figures 1-3,6; claim 4 *; | [Y]US2011202034 (LOPEZ JAMES T [US]) [Y] 1-20 * figures 1,2 *; | [Y]US2014094883 (LIM ALEX L [US], et al) [Y] 1-20* figures 1-3 * | Examination | US2006030917 | US2015359976 | US2016213829 | by applicant | US5383858 | US6322535 | US6652489 | US7553294 | US7666169 | WO2015164783 | US9173995 | US9199033 | WO2016112163 | US9474857 | WO2016191485 |