EP3482039 - FLOW CONTROL ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.10.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 18.11.2022 | ||
Former | Grant of patent is intended Status updated on 11.07.2022 | ||
Former | Examination is in progress Status updated on 22.01.2020 | ||
Former | Request for examination was made Status updated on 12.04.2019 | ||
Former | The international publication has been made Status updated on 12.01.2018 | ||
Former | unknown Status updated on 27.07.2017 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states Cameron Technologies Limited Parkstraat 83 2514 JG The Hague / NL | For all designated states Shirley, Brandon Blake 20402 Lakeland Falls Drive Cypress, Texas 77433 / US | For all designated states Guidry, Kirk Paul 13606 Branson Lane Cypress, Texas 77429 / US | [2019/20] | Inventor(s) | 01 /
SHIRLEY, Brandon Blake 13606 Branson Lane Cypress, Texas 77429 / US | 02 /
GUIDRY, Kirk Paul 13606 Branson Lane Cypress, Texas 77429 / US | [2019/20] | Representative(s) | Schlumberger Intellectual Property Department Parkstraat 83 2514 JG Den Haag / NL | [2019/20] | Application number, filing date | 17740269.0 | 07.07.2017 | [2019/20] | WO2017US41209 | Priority number, date | US201662359984P | 08.07.2016 Original published format: US 201662359984 P | US201715643015 | 06.07.2017 Original published format: US201715643015 | [2019/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018009874 | Date: | 11.01.2018 | Language: | EN | [2018/02] | Type: | A1 Application with search report | No.: | EP3482039 | Date: | 15.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.01.2018 takes the place of the publication of the European patent application. | [2019/20] | Type: | B1 Patent specification | No.: | EP3482039 | Date: | 21.12.2022 | Language: | EN | [2022/51] | Search report(s) | International search report - published on: | EP | 11.01.2018 | Classification | IPC: | E21B34/02, E21B34/04, F16K15/00 | [2019/20] | CPC: |
E21B34/02 (EP,US);
E21B33/068 (US);
F16K15/00 (EP,US);
F16K15/063 (EP,US);
F16K15/18 (EP,US);
F16K27/0209 (EP,US);
F16L29/02 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | STRÖMUNGSREGLERANORDNUNG | [2019/20] | English: | FLOW CONTROL ASSEMBLY | [2019/20] | French: | ENSEMBLE DE RÉGULATION DE DÉBIT | [2019/20] | Entry into regional phase | 30.01.2019 | National basic fee paid | 30.01.2019 | Designation fee(s) paid | 30.01.2019 | Examination fee paid | Examination procedure | 30.01.2019 | Examination requested [2019/20] | 30.01.2019 | Date on which the examining division has become responsible | 10.05.2019 | Amendment by applicant (claims and/or description) | 27.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 27.08.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 29.10.2020 | Reply to a communication from the examining division | 12.07.2022 | Communication of intention to grant the patent | 15.11.2022 | Fee for grant paid | 15.11.2022 | Fee for publishing/printing paid | 15.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 22.09.2023 | No opposition filed within time limit [2023/48] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 29.10.2020 | Request for further processing filed | 29.10.2020 | Full payment received (date of receipt of payment) Request granted | 09.11.2020 | Decision despatched | Fees paid | Renewal fee | 15.07.2019 | Renewal fee patent year 03 | 14.07.2020 | Renewal fee patent year 04 | 15.07.2021 | Renewal fee patent year 05 | 26.05.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 21.12.2022 | AT | 21.12.2022 | CZ | 21.12.2022 | DK | 21.12.2022 | EE | 21.12.2022 | ES | 21.12.2022 | FI | 21.12.2022 | HR | 21.12.2022 | IT | 21.12.2022 | LT | 21.12.2022 | LV | 21.12.2022 | MC | 21.12.2022 | NL | 21.12.2022 | PL | 21.12.2022 | RO | 21.12.2022 | RS | 21.12.2022 | SE | 21.12.2022 | SI | 21.12.2022 | SK | 21.12.2022 | SM | 21.12.2022 | GR | 22.03.2023 | IS | 21.04.2023 | PT | 21.04.2023 | IE | 07.07.2023 | LU | 07.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | FR | 31.07.2023 | [2024/33] |
Former [2024/26] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
IT | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
LU | 07.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
FR | 31.07.2023 | ||
Former [2024/24] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
LU | 07.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
FR | 31.07.2023 | ||
Former [2024/18] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
LU | 07.07.2023 | ||
Former [2024/14] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
MC | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2024/11] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/46] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/39] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/38] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/37] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/35] | AT | 21.12.2022 | |
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/34] | EE | 21.12.2022 | |
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/33] | ES | 21.12.2022 | |
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
GR | 22.03.2023 | ||
Former [2023/29] | FI | 21.12.2022 | |
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
GR | 22.03.2023 | ||
Former [2023/25] | FI | 21.12.2022 | |
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
GR | 22.03.2023 | ||
Former [2023/23] | FI | 21.12.2022 | |
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
SE | 21.12.2022 | ||
GR | 22.03.2023 | ||
Former [2023/22] | FI | 21.12.2022 | |
LT | 21.12.2022 | ||
SE | 21.12.2022 | ||
Former [2023/20] | LT | 21.12.2022 | Cited in | International search | [X]GB2132728 (NL INDUSTRIES INC) [X] 1-5,8,10-12,17,18,20 * pages 1-6; figures 1-4, 7 *; | [X]US6050338 (WATKINS BRUCE J [US]) [X] 1,3,5-9,17-20* columns 1, 3-4; figures 1-2A *; | [X]US7566045 (JUNE DAVID [US]) [X] 1-4,8,17,18,20 * columns 4-6; figures 1-4 * |