EP3507182 - DRIVE ASSEMBLY AND VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 14.01.2021 | ||
Former | Request for examination was made Status updated on 07.06.2019 | ||
Former | The international publication has been made Status updated on 10.03.2018 | ||
Former | unknown Status updated on 02.08.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2019/28] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
HINTERKAUSEN, Markus Klausenburgerstrasse 7 71696 Moeglingen / DE | 02 /
KIMMICH, Peter Schneewittchenweg 3/1 71144 Steinenbronn / DE | [2019/28] | Application number, filing date | 17742708.5 | 14.07.2017 | [2019/28] | WO2017EP67797 | Priority number, date | DE201610216557 | 01.09.2016 Original published format: DE102016216557 | [2019/28] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018041460 | Date: | 08.03.2018 | Language: | DE | [2018/10] | Type: | A1 Application with search report | No.: | EP3507182 | Date: | 10.07.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 08.03.2018 takes the place of the publication of the European patent application. | [2019/28] | Type: | B1 Patent specification | No.: | EP3507182 | Date: | 26.05.2021 | Language: | DE | [2021/21] | Search report(s) | International search report - published on: | EP | 08.03.2018 | Classification | IPC: | B62M6/55, B62M11/06, B62M11/14 | [2019/28] | CPC: |
B62M6/55 (EP,US);
B62M11/06 (EP,US);
B62M11/145 (EP,US);
B62M11/18 (EP,US);
F16H37/065 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ANTRIEBSANORDNUNG UND FAHRZEUG | [2019/28] | English: | DRIVE ASSEMBLY AND VEHICLE | [2019/28] | French: | SYSTÈME D'ENTRAÎNEMENT ET VÉHICULE | [2019/28] | Entry into regional phase | 01.04.2019 | National basic fee paid | 01.04.2019 | Designation fee(s) paid | 01.04.2019 | Examination fee paid | Examination procedure | 01.04.2019 | Examination requested [2019/28] | 01.04.2019 | Date on which the examining division has become responsible | 25.06.2019 | Amendment by applicant (claims and/or description) | 15.01.2021 | Communication of intention to grant the patent | 19.04.2021 | Fee for grant paid | 19.04.2021 | Fee for publishing/printing paid | 19.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21152460.8 / EP3845446 | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Fees paid | Renewal fee | 31.07.2019 | Renewal fee patent year 03 | 31.07.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.07.2017 | AL | 26.05.2021 | CY | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | MT | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | TR | 26.05.2021 | IE | 14.07.2021 | LU | 14.07.2021 | BE | 31.07.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | PT | 27.09.2021 | [2024/42] |
Former [2024/29] | HU | 14.07.2017 | |
AL | 26.05.2021 | ||
CY | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
MK | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
TR | 26.05.2021 | ||
IE | 14.07.2021 | ||
LU | 14.07.2021 | ||
BE | 31.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2024/22] | HU | 14.07.2017 | |
AL | 26.05.2021 | ||
CY | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
MK | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
IE | 14.07.2021 | ||
LU | 14.07.2021 | ||
BE | 31.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2023/33] | HU | 14.07.2017 | |
AL | 26.05.2021 | ||
CY | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
IE | 14.07.2021 | ||
LU | 14.07.2021 | ||
BE | 31.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2023/30] | AL | 26.05.2021 | |
CY | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
IE | 14.07.2021 | ||
LU | 14.07.2021 | ||
BE | 31.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/35] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
IE | 14.07.2021 | ||
LU | 14.07.2021 | ||
BE | 31.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/34] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
LU | 14.07.2021 | ||
BE | 31.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
LU | 14.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/26] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
LU | 14.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | DK | 26.05.2021 | |
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
LU | 14.07.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/18] | DK | 26.05.2021 | |
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | DK | 26.05.2021 | |
EE | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/08] | DK | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | FI | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | FI | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | FI | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | FI | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | FI | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | FI | 26.05.2021 | |
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | FI | 26.05.2021 | |
LT | 26.05.2021 | Cited in | International search | [XI]DE102008064514 (FINESCHNITT GMBH [DE]) [X] 1-3 * paragraphs [0146] - [0206]; figures 3-36; claims 1-3 * [I] 7-11; | [XI]DE102010051727 (PINION GMBH [DE]) [X] 1-3 * paragraphs [0053] - [0096]; figures 3-11 * [I] 7-11; | [A]DE102011106107 (PINION GMBH [DE]) [A] 1-11 * paragraphs [0071] - [0094]; figures 1-3 *; | [A]EP3028934 (BOSCH GMBH ROBERT [DE]) [A] 1-11* abstract * |