EP3513625 - INVERTER-FED ARC FURNACE WITH CAPACITOR ASSEMBLY IN SECONDARY CIRCUIT [Right-click to bookmark this link] | |||
Former [2019/30] | CONVERTER-FED ELECTRIC ARC FURNACE WITH CAPACITOR ASSEMBLY IN THE SECONDARY CIRCUIT | ||
[2020/10] | Status | No opposition filed within time limit Status updated on 11.05.2021 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 29.05.2020 | ||
Former | Grant of patent is intended Status updated on 18.02.2020 | ||
Former | Request for examination was made Status updated on 21.06.2019 | ||
Former | The international publication has been made Status updated on 24.03.2018 | ||
Former | unknown Status updated on 11.08.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Primetals Technologies Germany GmbH Schuhstrasse 60 91052 Erlangen / DE | [2019/30] | Inventor(s) | 01 /
DITTMER, Björn Egonstrasse 7 90461 Nürnberg / DE | 02 /
HERGT, Martin Bierweg 90 90411 Nürnberg / DE | 03 /
RIEGER, Detlef Alpenrosenstrasse 26 85598 Baldham / DE | [2019/30] | Representative(s) | Metals@Linz Primetals Technologies Austria GmbH Intellectual Property Upstream IP UP Turmstraße 44 4031 Linz / AT | [2019/30] | Application number, filing date | 17746431.0 | 24.07.2017 | [2019/30] | WO2017EP68571 | Priority number, date | EP20160188941 | 15.09.2016 Original published format: EP 16188941 | [2019/30] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018050332 | Date: | 22.03.2018 | Language: | DE | [2018/12] | Type: | A1 Application with search report | No.: | EP3513625 | Date: | 24.07.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 22.03.2018 takes the place of the publication of the European patent application. | [2019/30] | Type: | B1 Patent specification | No.: | EP3513625 | Date: | 01.07.2020 | Language: | DE | [2020/27] | Search report(s) | International search report - published on: | EP | 22.03.2018 | Classification | IPC: | H05B7/18, H05B7/00, H05B7/144 | [2019/30] | CPC: |
H05B7/18 (EP,US);
H05B7/005 (EP,US);
H05B7/144 (EP,US);
Y02P10/25 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | UMRICHTERGESPEISTER LICHTBOGENOFEN MIT KONDENSATORANORDNUNG IM SEKUNDÄRKREIS | [2019/30] | English: | INVERTER-FED ARC FURNACE WITH CAPACITOR ASSEMBLY IN SECONDARY CIRCUIT | [2020/10] | French: | FOUR À ARC ÉLECTRIQUE ALIMENTÉ PAR ONDULEUR AVEC SYSTÈME DE CONDENSATEURS DANS LE CIRCUIT SECONDAIRE | [2020/10] |
Former [2019/30] | CONVERTER-FED ELECTRIC ARC FURNACE WITH CAPACITOR ASSEMBLY IN THE SECONDARY CIRCUIT | ||
Former [2019/30] | FOUR À ARC ALIMENTÉ PAR UN CONVERTISSEUR AYANT UN ENSEMBLE DE CONDENSATEURS DANS LE CIRCUIT SECONDAIRE | Entry into regional phase | 15.04.2019 | National basic fee paid | 15.04.2019 | Designation fee(s) paid | 15.04.2019 | Examination fee paid | Examination procedure | 12.07.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 15.04.2019 | Examination requested [2019/30] | 15.04.2019 | Date on which the examining division has become responsible | 19.02.2020 | Communication of intention to grant the patent | 20.05.2020 | Fee for grant paid | 20.05.2020 | Fee for publishing/printing paid | 20.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 06.04.2021 | No opposition filed within time limit [2021/23] | Fees paid | Renewal fee | 25.07.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.07.2017 | AL | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | MT | 01.07.2020 | NL | 01.07.2020 | PL | 01.07.2020 | RO | 01.07.2020 | RS | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | IE | 24.07.2020 | LU | 24.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | LI | 31.07.2020 | FR | 01.09.2020 | BG | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | [2022/33] |
Former [2022/28] | HU | 24.07.2017 | |
AL | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 24.07.2020 | ||
LU | 24.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
FR | 01.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/37] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 24.07.2020 | ||
LU | 24.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
FR | 01.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/36] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 24.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
FR | 01.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/35] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 24.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
FR | 01.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/28] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 24.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/25] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 24.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/23] | CZ | 01.07.2020 | |
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 24.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/22] | CZ | 01.07.2020 | |
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 24.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/20] | CZ | 01.07.2020 | |
DK | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
LU | 24.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/18] | CZ | 01.07.2020 | |
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/17] | CZ | 01.07.2020 | |
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/11] | CZ | 01.07.2020 | |
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/09] | CZ | 01.07.2020 | |
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/08] | ES | 01.07.2020 | |
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/07] | FI | 01.07.2020 | |
LT | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
Former [2021/01] | BG | 01.10.2020 | Cited in | International search | [I]DE867267 (DEMAG ELEKTROMETALLURGIE GMBH); | [A]DE949425 (AEG); | [A]US3408447 (FERDINAND BECK); | [A]DE3025466 (ERO STARKSTROM KONDENSATOREN [DE]); | [X]US6687284 (BEAUREGARD FRANCOIS [CA], et al) | by applicant | DE867267 | DE949425 | DE3025466 | WO9749157 | US6687284 | DE102008049610 | US8933378 |