EP3417261 - WIND TUNNEL FOR HUMAN FLIGHT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.02.2023 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 25.02.2022 | ||
Former | Grant of patent is intended Status updated on 27.01.2022 | ||
Former | Examination is in progress Status updated on 09.10.2020 | ||
Former | Request for examination was made Status updated on 23.11.2018 | ||
Former | The international publication has been made Status updated on 01.09.2017 | Most recent event Tooltip | 29.09.2023 | Lapse of the patent in a contracting state New state(s): MC | published on 01.11.2023 [2023/44] | Applicant(s) | For all designated states Inclined Labs AB Ranhammarsvägen 14 168 67 Bromma / SE | [2022/13] |
Former [2019/04] | For all designated states Inclined Labs AB Ranhammarsvägen 14 168 67 Bromma / SE | ||
Former [2018/52] | For all designated states Inclined Labs AB Nybodagatan 16 171 42 Solna / SE | Inventor(s) | 01 /
WESTMAN, Anton Rimfrostvägen 3 179 75 Skå / SE | 02 /
GEORÉN, Peter Nybodagatan 16 171 42 Solna / SE | 03 /
STRÖMBERG, Johan Carl Malmstens väg 2 lgh 1001 170 73 Solna / SE | [2018/52] | Representative(s) | Valea AB Box 7086 103 87 Stockholm / SE | [2022/13] |
Former [2018/52] | AWA Sweden AB P.O. Box 45086 104 30 Stockholm / SE | Application number, filing date | 17753575.4 | 14.02.2017 | [2018/52] | WO2017SE50137 | Priority number, date | SE20160050199 | 15.02.2016 Original published format: SE 1650199 | [2018/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017142461 | Date: | 24.08.2017 | Language: | EN | [2017/34] | Type: | A1 Application with search report | No.: | EP3417261 | Date: | 26.12.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.08.2017 takes the place of the publication of the European patent application. | [2018/52] | Type: | B1 Patent specification | No.: | EP3417261 | Date: | 30.03.2022 | Language: | EN | [2022/13] | Search report(s) | International search report - published on: | SE | 24.08.2017 | (Supplementary) European search report - dispatched on: | EP | 11.11.2019 | Classification | IPC: | A63G31/00, G01M9/04, B64D23/00 | [2019/50] | CPC: |
G01M9/04 (EP,US);
G01M9/02 (RU,SE,US);
A63G31/00 (EP,RU,SE,US);
A63G31/16 (US);
B64D23/00 (RU,SE,US);
G09B9/00 (US);
A63G2031/005 (EP,SE,US)
(-)
|
Former IPC [2018/52] | G01M9/02, A63G31/00, B64D23/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | WINDKANAL FÜR MENSCHLICHEN FLUG | [2018/52] | English: | WIND TUNNEL FOR HUMAN FLIGHT | [2018/52] | French: | TUNNEL AÉRODYNAMIQUE POUR VOL HUMAIN | [2018/52] | Entry into regional phase | 14.09.2018 | National basic fee paid | 29.10.2018 | Search fee paid | 14.09.2018 | Designation fee(s) paid | 14.09.2018 | Examination fee paid | Examination procedure | deleted | Deletion: Application deemed to be withdrawn, date of legal effect [2018/52] | deleted | Date on which the examining division has become responsible | 15.12.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 15.08.2018 | Observations by third parties | 14.09.2018 | Examination requested [2018/52] | 26.10.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time [2018/52] | 20.05.2020 | Amendment by applicant (claims and/or description) | 13.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 22.02.2021 | Reply to a communication from the examining division | 06.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2021 | Reply to a communication from the examining division | 28.01.2022 | Communication of intention to grant the patent | 11.02.2022 | Fee for grant paid | 11.02.2022 | Fee for publishing/printing paid | 11.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.01.2023 | No opposition filed within time limit [2023/10] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the search fee | 29.10.2018 | Request for further processing filed | 29.10.2018 | Full payment received (date of receipt of payment) Request granted | 13.11.2018 | Decision despatched | Fees paid | Renewal fee | 14.09.2018 | Renewal fee patent year 03 | 14.01.2020 | Renewal fee patent year 04 | 18.01.2021 | Renewal fee patent year 05 | 16.02.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 30.03.2022 | EE | 30.03.2022 | FI | 30.03.2022 | LT | 30.03.2022 | MC | 30.03.2022 | RO | 30.03.2022 | RS | 30.03.2022 | SE | 30.03.2022 | SM | 30.03.2022 | BG | 30.06.2022 | IS | 30.07.2022 | [2023/44] |
Former [2023/06] | AL | 30.03.2022 | |
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
LT | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
IS | 30.07.2022 | ||
Former [2023/01] | AL | 30.03.2022 | |
EE | 30.03.2022 | ||
FI | 30.03.2022 | ||
LT | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
IS | 30.07.2022 | ||
Former [2022/51] | EE | 30.03.2022 | |
FI | 30.03.2022 | ||
LT | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
IS | 30.07.2022 | ||
Former [2022/49] | EE | 30.03.2022 | |
FI | 30.03.2022 | ||
LT | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
Former [2022/48] | EE | 30.03.2022 | |
FI | 30.03.2022 | ||
LT | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
Former [2022/47] | FI | 30.03.2022 | |
LT | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
Former [2022/39] | FI | 30.03.2022 | |
LT | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
Former [2022/35] | LT | 30.03.2022 | |
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
Former [2022/33] | LT | 30.03.2022 | Documents cited: | Search | [A]US3620076 (HEYSON HARRY H) [A] 2,4 * Figure 3 and corresponding passages in the description *; | [XAYI]JPS5535662 (IGARASHI HISAHIRO) [X] 1,3,8 * paragraph [0002]; figure - * [A] 4-7,10,11 [Y] 9,12-20 [I] 2; | [Y]JPH0236887 (MITSUBISHI HEAVY IND LTD) [Y] 9,12-20 * Figures 1, 3-6 and corresponding passages in the description *; | [A]NZ568424 (DELTAVDEVELOPMENT LTD) [A] 1-11* the whole document *; | [A]WO2014007600 (ZVJAGINS IGORS [LV]) [A] 2,5 * paragraphs [0033] - [0044]; figure - * | International search | [A]US1635038 (FALES ELISHA N) [A] 1-30* , figure 4; claim 1 *; | [A]GB2062557 (LOUTTIT I A) [A] 1-30 * , abstract; figure 1 *; | [Y]US5209702 (ARENAS FRANK [US]) [Y] 15-30 * ; column 6, line 47 - line 59; figure 6 *; | [A]DE4241574 (SZEKELY ISTVAN [DE]) [A] 1-30 * ; abstract; figures 1-4 *; | [A]US2003113695 (LEE SUNG TAEE [KR], et al) [A] 1-30 * , abstract; figures 1-3 *; | [XY]NZ568424 (DELTAVDEVELOPMENT LTD) [X] 1-14 * , whole document * [Y] 15-30; | [A]US2010137069 (PETRUK VICTOR BORISOVICH [UA]) [A] 1-30 * , abstract; figure 1 *; | [A]DE102013007143 (KIRCH FRANZ-JOSEF [DE]) [A] 1-30 * ; abstract; figures 1-5 * | by applicant | US1947962 | US3276251 | US7156744 |